Chapter 5, Problem 1ST
To determine
Calculate the present worth.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A machine cost $315,000 to purchase. Fuel, oil, grease, and minor maintenance are
estimated to cost $53.50 per operating hour. A set of tires cost $16,000 to replace, and
their estimated life is 3,100 use hours. A $17,000 major repair will probably be required
after 6,200 hr of use. The machine is expected to last for 9,300 hr, after which it will be
sold at a price (salvage value) equal to 13% of the original purchase price. A final set of
new tires will not be purchased before the sale. How much should the owner of the
machine charge per hour of use, if it is expected that the machine will operate 3,100 hr
per year? The company's cost-of-capital rate is 7.25%.
You are about to buy a piece of equipment (machine Alpha) for a project.
The initial cost is $500,000 and the annual maintenance costs is
$15,000. Another company offers you a second option (Machine Beta)
for which the annual maintenance cost is $20,000. What is the
maximum price (the initial cost) you would be willing to pay for the
second option? Both machines have the same useful life of 11 years and
the difference between their performances is negligible. Assume an
annual interest rate of 4%.
$767,524
$667,197
$456,197
$567,524
A firm is considering the “make vs. buy” question for a subcomponent. If the part is made in-house, the production data would be: first cost = $350, 000; annual costs for operation = $45, 000; salvage value = $15, 000; project life = 5 years; interest = 10%; and material cost per unit = $8.50. If annual production is 10,000 units, the maximum amount that the firm should be willing to pay to an outside vendor for the subcomponent is nearest? (a) $10 per unit (b) $16 per unit (c) $22 per unit (d) $28 per unit?
Chapter 5 Solutions
Contemporary Engineering Economics (6th Edition)
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - If a project costs 100,000 and is expected to...Ch. 5 - Refer to Problem 5.2, and answer the following...Ch. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Consider the cash flows from an investment...Ch. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Consider the project balances in Table P5.19 for a...Ch. 5 - Your RD group has developed and tested a computer...Ch. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Geo-Star Manufacturing Company is considering a...Ch. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Prob. 41PCh. 5 - Prob. 42PCh. 5 - Two methods of carrying away surface runoff water...Ch. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 1STCh. 5 - Prob. 2ST
Knowledge Booster
Similar questions
- . A construction company is considering two possibilities for warehouse operations. Proposal 1 would require the purchase of a forklift for $5,000 and 500 pallets that cost $5 each. The average life of a pallet is assumed to be 2 years. If the forklift is purchased, the company must hire an operator for $9,000 annually and spend $600 per year on maintenance and operation. The life of the forklift is expected to be 12 years with a $700 salvage value. Alternatively, proposal 2 requires that the company hire 2 men to operate power driven hand trucks at a cost of $7,500 per man. One hand truck will be required at a cost of $900. The hand truck will have a life of 6 years with no salvage value. If the company's minimum attractive rate of return is 12%, which alternative should be selected? Use the annual equivalent method.arrow_forwardYou are evaluating a project for The Ultimate recreational tennis racket, guaranteed to correct that wimpy backhand. You estimate the sales price of The Ultimate to be $300 per unit and sales volume to be 1,000 units in year 1, 1,250 units in year 2, and 1,325 units in year 3. The project has a three-year life. Variable costs amount to $200 per unit and fixed costs are $50,000 per year. The project requires an initial investment of $150,000 in assets that will be depreciated straight-line to zero over the three-year project life. The actual market value of these assets at the end of year 3 is expected to be $25,000. NWC requirements at the beginning of each year will be approximately 10 percent of the projected sales during the coming year. The tax rate is 21 percent and the required return on the project is 10 percent. What will the free cash flow for this project be in year 2? Multiple Choice $53,000 $102,450 $107,250 $49,950arrow_forwardInternational Machine Manufacturing Company is preparing to build a new plant by considering three potential processes for it. International Machine Manufacturing Company has identified three process alternatives and developed costs as well. The fixed and variable costs for the three alternative processes are presented below. Process A, B and C are the name of three process alternatives. The cost data are as follows: Process A Process B Process C Annual Contracted Units 350,000 350,000 350,000 Annual fixed cost OMR 100,000 OMR 250,000 OMR 550,000 Variable cost (Per Unit) OMR 16 OMR 12 OMR 10 Calculate the following by using the data given: a. Identify the best process to be followed by the International Machine Manufacturing Company. b. Determine the Economical Volume for each process. c. Determine the best process for each of the following volumes: (i) 100,000 (ii) 275,000 (iii) 325,000arrow_forward
- Please use a financial calculator to solve. Be sure to list your steps. You are evaluating two different silicon wafer milling machines. The Techron I costs $237,000, has a three-year life, and has pretax operating costs of $62, 000 per year. The Techron II costs $ 415,000, has a five - year life, and has pretax operating costs of $ 35,000 per year. For both milling machines, use straight - line depreciation to zero over the project's life and assume a salvage value of $39, 000. If your tax rate is 21 percent and your discount rate is 8 percent, compute the EAC for both machines. (Your answer should be a negative value and indicated by a minus sign. Do not round intermediate calculations and round your answers to 2 decimal places, e.g., 32.16.)arrow_forwardBrawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at their plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. Excel file: data14-05.xlsx Number of Line Defective Speed Parts Found 20 23 20 21 30 19 30 16 40 15 40 17 50 14 50 11 If required onterarrow_forwardCambridge Instruments is an aircraft instrumentation manufacturer. It has received a contract from the U.S. Department of Defense to produce 30 radar units for a military fighter plane. The first unit took 85 hours to produce. Based on past experience with manufacturing similar units, Cambridge estimates that the learning rate is 93 percent. How long will it take to produce the 5th unit? The 10th? The 15th? The final unit?arrow_forward
- Artisan Metalworks has a bottleneck in their production that occurs within the engraving department. Jamal Moore, the COO, is considering hiring an extra worker, whose salary will be $55,000 per year, to solve the problem. With this extra worker, the company could produce and sell 3,000 more units per year. Currently, the selling price per unit is $25 and the cost per unit is $7.85. Using the information provided, calculate the annual financial impact of hiring the extra worker.arrow_forwardA company is about to invest in a joint venture research and development project with another company. The project is expected to last nine years, but yearly payments the company makes will begin immediately (a payment is made today, and the last payment is nine years from today). Salaries will account for $50,000 of each payment. The reminder of each payment will cover equipment costs and facility overhead. The initial (immediate) equipment and facility cost is $50,000. Each subsequent year this figure will drop by $5000 until a cost of $25000 is reached, after which the costs will remain constant until the end of the project. a) Draw a cash flow diagram to illustrate the cash flows for this project. b) At an interest rate of 10%, what is the total future worth of all project payments at the end of the nine years?arrow_forwardENGINEERING ECONOMY RATE WILL BE GIVEN. WRITE THE COMPLETE SOLUTIONS/EXPLANATION LEGIBLY OR TYPEWRITTEN. GIVE STRAIGHT TO THE POINT EXPLANATION. A company is analyzing a make-versus-purchase situation for a component used in several products, and the engineering department has developed these data: Option A: Purchase 10,000 items per year at a fixed price of $8.50 per item. The cost of placing the order is negligible according to the present cost accounting procedure. Option B: Manufacture 10,000 items per year, using available capacity in the factory. Cost estimates are direct materials = $5.00 per item and direct labor = $1.50 per item. Manufacturing overhead is allocated at 200% of direct labor (= $3.00 per item). Based on these data, should the item be purchased or manufactured?arrow_forward
- Lulu hypermarket estimates daily demand of 18 kgs for a product. It costs RO 100 to make and receive an order, and it takes 16 workdays to receive it. The annual holding cost is 25 % of purchase price. The price RO 2 per kg. The company is operating 5 days per week, and a total of 210 workdays in one year. What is the minimum annual total holding and ordering cost in RO? Round-up to the nearest integerarrow_forward8.35 Emerson Electric is considering the purchase of equipment that will allow the company to manufacture a new line of wireless devices for home appliance control. The fırst cost will be $80,000 and the life estimated is 6 years with a salvage value of $10,000. Three different salespeople have provided estimates regarding the added revenue the equipment will generate. Salespersons 1,2, and 3 have made estimates of $10,000, $16,000, and $18,000 per year, respectively. If the company's MARR is 8% per year, use a PW=based relation to perform a sensitivity analysis to assist in the decision to purchase the equipment. This question is in four parts. Part 1: Using Salesperson 1 estimate of $10,000 per year, what is the present worth (PW) of this scenario? (your answer should be a positive or negative number and do not use commas or $ signs)arrow_forwardABC Corporation will be making a $100,000 payment and a collection of the same amount. The buying spot rate for a USD is P52.10 and the selling spot rate is P52.35. By matching the collection and the payment, ABC was able to make cost savings of how much?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education