Question
Chapter 3, Problem 35P
Summary Introduction
To determine: The way to maximize the profit of the firm using solver.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A diabetic patient needs at least 40 units of Vit. A, at least 30 units of Vit. C, and at least 40 units 30 units of Vit. E each day. Each brand X multivitamin capsule contains 4 units of Vit. A, 6 units of Vit. C, and 2 units of Vit. E; each brand Y capsule contains 5 units of Vit. A, 3 units of Vit.C, and 5 units of Vit. E. If each brand X capsule costs P6.00 and each brand Y capsule costs P9.00, how many capsules should the patient take each day to minimize the costs?
A diabetic patient needs at least 40 units of Vit. A, at least 30 units of Vit. C, and atleast 30 units of Vit. E each day. Each brand X multivitamin capsule contains 4 units of
Vit. A, 6 units of Vit. C, and 2 units of Vit. E; each brand Y capsule contains 5 units of Vit.A, 3 units of Vit.C, and 5 units of Vit. E. If each brand X capsule costs P6.00 and eachbrand Y capsule costs P9.00, how many capsules should the patient take each day tominimize the costs? Solve using graphical method. Show complete solution.
A Company produces a component for use in the aerospace industry. The component consists of three parts (A, B and C), which are purchased externally and cost 50c, 60c and 70c per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 150 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are six drilling machines in total, but only three are currently operational. Each drilling machine drills part C at a rate of 30 parts per hour. The final assembly line has a production capacity of 100 components per hour. At present, components are produced eight hours a day, five days a week.
If the need arises, management can add a second shift of eight hours for the assembly lines only.
The cost of assembly labour is 40c per assembly operation for each assembly line; the cost of drilling labour is 20c per part. For drilling, the cost of electricity is 10c per part. The overhead cost…
Chapter 3 Solutions
Practical Management Science
Ch. 3.6 - Prob. 1PCh. 3.6 - Prob. 2PCh. 3.6 - Prob. 3PCh. 3.6 - Prob. 4PCh. 3.6 - Prob. 5PCh. 3.6 - Prob. 6PCh. 3.6 - Prob. 7PCh. 3.6 - Prob. 8PCh. 3.6 - Prob. 9PCh. 3.7 - Prob. 10P
Ch. 3.7 - Prob. 11PCh. 3.7 - Prob. 12PCh. 3.7 - Prob. 13PCh. 3.7 - Prob. 14PCh. 3.7 - Prob. 15PCh. 3.7 - Prob. 16PCh. 3.7 - Prob. 17PCh. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - Prob. 21PCh. 3.8 - Prob. 22PCh. 3.8 - Prob. 23PCh. 3.8 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 31PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 35PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Prob. 41PCh. 3 - Prob. 42PCh. 3 - Prob. 43PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Prob. 48PCh. 3 - Prob. 49PCh. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - Prob. 52PCh. 3 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Sawing 20 min/unit Sanding 20 min/unit Drilling 32 min/unit Welding 30 min/unit Assembly 93 min/unit Assembly 93 min/unit Assembly 93 min/unit A production process is shown in the figure above. The drilling operation occurs separately from, and simultaneously with the sawing and sanding operations. Welding starts when both drilling and sanding operations have been completed. After welding, a product needs to go through only one of the three assembly operations (the operations are in parallel, where parallel lines perform the exact same operation). Considering the process times at stations, what is the process time of the system (in min/unit)?arrow_forwardThere is an upstream Picking department that feeds two downstream Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…arrow_forwardKnott's Berry Farm is contemplating buying a new van for its operations. The farm's engineering staff has researched the market and found 2 units that appear to meet their requirements. Truck # 1 has a cost of $37,000 and requires an annual maintenance cost of $2,700. At the end of its useful life (3 years), it is projected to have a salvage value of $5,000. On the other hand, Truck #2 has an initial cost of $40,000 and requires only $2,000 in annual operating costs because the manufacturer is claiming that some routine maintenance is covered in the price of the truck. Truck # 2 has an estimated salvage value of $8,000 at the end of its 4 year service life. The CEO has determined that the farm's MARR is 12%. The trucks are needed for 12 years according to the 2024 Strategic Plan. The Engineering Department has determined that no significant changes are needed in the future that would change prices and functional characteristics of each truck. As a member of the Engineering Department,…arrow_forward
- Digital Controls, Inc. (DCI), manufactures two models of a radar gun used by police to monitor the speed of automobiles. Model A has an accuracy of plus or minus 1 mile per hour, whereas the smaller model B has an accuracy of plus or minus miles per hour. For the next week, the company has orders for 100 units of model A and 150 units of model B. Although DCI purchases all the electronic components used in both models, the plastic cases for both models are manufactured at a DCI plant in Newark, New Jersey. Each model A case requires 4 minutes of injection-molding time and 6 minutes of assembly time. Each model B case requires 3 minutes of injection-molding time and 8 minutes of assembly time. For next week, the Newark plant has 600 minutes of injection-molding time available and 1,080 minutes of assembly time available. The manufacturing cost is $10 per case for model A and $6 per case for model B. Depending upon demand and the time available at the Newark plant, DCI occasionally…arrow_forwardThe Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and small size tractor (SM). Its production manager desires to produce to customer demand using a mixed-model production line. The current sequence of production, which is repeated 30 times during a shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hour shifts. There is no downtime because the 4 hours between each shift are dedicated to maintenance and restocking raw material. Based on this information, answer the following questions.a. How long does it take the production cycle to be completed?b. How many of each type of machine does Farm-4-Less produce in a shift?arrow_forwardA company has two warehouses that store different products: Tashkent and Samarkand. When an order is received, it is distributed across these warehouses: if some of the relevant products are maintained in Tashkent, a sub-order is sent there; likewise, if some relevant products are maintained in Samarkand, a sub-order is sent there. Afterward, the order is registered and the process completes. Draw a detailed BPMM model for this scenarioarrow_forward
- A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalarrow_forwardA computer recycler sells computer enclosures to a computer remanufacturer. To meet monthly expected demand, the remanufacturer needs 2.000 enclosures. The recycler utilizes a four-step disassembly process with scrap rates given as follows: d1=0.08, d2=0.05, d3=0.05, and d4=0.03. How many computers must be recycler receive each month in order to meet the remanufacturer’s demand?arrow_forwardThe sales department clerk receives a customer orders from the customers and prepares a three-part sales order. The three copies are sent to the credit department for approval, where the clerk reviews the Customer Credit Records. After approval, the credit department clerk returns one copy of the sales order to the Sales Department, where it is reviewed and filed. The remaining two copies are sent to the warehouse. The Warehouse clerk picks the goods from the shelves and sends them along with one copy of the sales order to the shipping department. The third copy of the sales order is filed in the warehouse. Upon receipt if the goods, the shipping clerk prepares a shipping notice and sends the goods and one copy of the sales order to the customer. The clerk then sends the shipping notice to the Billing Department. Upon receipt of the shipping notice the billing clerk updates the customer’s account receivable and files the shipping notice in the department. Required Prepare a system…arrow_forward
- Two vital stages in a production process are assembly I and assembly II. The unit load for the assembly I stage is 7.0 ( 50% higher for high skill) minutes, while it is 10.0 (30 % higher for high skill) minutes for assembly II. There are 7 employees working in assembly I and 8 employees working in assembly II. 65% of low skill labor and 35% of high skill labor are required at both stages. . On average 18% of the operating time is wasted, what's the theoretical unit load for Assembly II? answer is 9.06 please explainarrow_forwardA fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. [Kemudahan pembaikan armada berkapasiti untuk memperbaiki 800 trak sebulan. Namun, penyelenggaraan peralatan mereka yang telah dijadualkan, pihak pengurusan berpendapat bahawa mereka tidak dapat membaiki lebih dari 600 trak sebulan. Bulan lalu, dua pekerja tidak hadir setiap hari, dan hanya 400 trak yang dapat diperbaiki..] (a) Calculate the utilization of the repair shop. [Kirakan penggunaan kedai membaiki.] i) Calculate the efficiency of the repair shop. [Kirakan kecekapan kedai membaiki.] ii)arrow_forwardIn a sandwich production factory, making each ham and cheese sandwich consists of a number of activities which totally take 7 minutes. The production line for ham and cheese sandwich has five workers who work 12 hours a day. What is the maximum number of ham and cheese sandwiches they canmake in this production line?a) 465 b) 425c) 612 d) 514e) 102arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.