hundred picces will flow through from the first machinc A to the final machine 1 on the given sequence of operations. A unit load size of 50 is initially specified irst machinc. However, due to lot sizing decisions, the unit load size is doubled aft essing on machine D. e vehicle (c.g., lift truck) is uscd to transport the unit loads from machine to machir mine the total number of trips that the vehicle has to make, assuming that the vehic city is one unit load.
Q: The structure of MRP systems suggests "buckets" and inliniteloading. What is meant by these two term...
A: A Material Requirements Planning often called MRP system can be stated as the planning and the decis...
Q: can you explain quarters 1-4
A: Given- Hiring cost = 40 per unitLayoff cost = 70 per unitProduction cost = 35 per unitStockout cost ...
Q: From the options below, which one would NOT be an opportunity that companies experience when expandi...
A: In the present worldwide economy, organizations of all sizes are laying out tasks in unfamiliar busi...
Q: How does the y relate to the x axis
A: The horizontal axis of something like the cartesian plane is represented by the X-axis. From left to...
Q: What information do you need to clarify with service providers to ensure they know their roles and r...
A: Individualized planning assists individuals in: enhancing natural supports such as friendships, neig...
Q: At a car washing service facility customers arrive at the rate of 8 cars per hour. The service can m...
A: This is a single-server model, we can understand that and the arrival rate (λ) = 8 cars/hr and servi...
Q: What are the distinctions between MRP, DRP, and ERP?
A: MRP, DRP, and ERP are distinct from one other in the following ways:
Q: What are the 3 defects in your department. How would you help new hires overcome this obstacles?
A: Note- Hi! Thank you for the question As per the honour code, We’ll answer the first question since t...
Q: Question 15 Gulong Inc are manufacturers of brakes sets for sedan and off-road SUVS vehicles. 500 ho...
A: Linear programming is an optimization technique, where the decision-maker uses the limited resources...
Q: A CFE of -140 suggests which of the following? Group of answer choices a. There is a bias towards ...
A: The CFE stands for the cumulative sum of forecast errors. It helps to the measurement of the total f...
Q: A management science solution can be either a recommended decision or information that helps a manag...
A: Concept Introduction : Management Science is a concept of management which deals the systematic ana...
Q: Describe closed-loop MRP
A: The closed-loop MRP framework also refers to the second-generation framework, like the Enterprise Re...
Q: Better Products (Assigning Plants to Products) The Better Products Company has decided to initiate t...
A: This is a transportation question in which decision needs to be made which plant will produce or shi...
Q: Sheaves Corporation economists estimate that a good business environment and a bad business environm...
A: Volatility can be broadly described as a tool for the measurement of the security risk of the compan...
Q: Problem 225-17 (Algo) The M-N plant manufactures two different products: M and N. Selling prices and...
A: A Small Introduction of Supply Chain Management Supply Chain Management incorporates, arranges, p...
Q: ) Recommend a suitable quality tool that could identify the problem and to monitor the business perf...
A: Many organizations use quality tools to help observe and control their quality initiatives. There ar...
Q: carately on hand. Assess the business impact of this situation, describe how this process could be i...
A: As per the Bartleby guidelines, only the first question has been answered.
Q: ___ model of inventory control involves placing an order when inventory levels reach re-order level ...
A: The fixed order quantity system is also called the Q model. Here, whenever the stock on hand matches...
Q: ct plans from the knowledge areas base on the Components of the Scope Management plan
A: Project management plan
Q: What is considered to be the "holy grail" of online advertising? Group of answer choices Being able ...
A: Holi grail refers to the customer loyalty towards specific brand and product offered by the firm it ...
Q: If 10 pallets are received each 8-hour day, what is the average number of pallets in the system on a...
A: We will follow the two lines i.e, S/R- PRICING-STOCKING-CYCLE COUNT S/R-PRICING-SPOTTING-CYCLE COUNT...
Q: A part structure, lead time (weeks), and on-handquantities for product A are shown in Figure 14. 14....
A: given,
Q: What is the difference between a level and a chase strategy? What are some advantages and disadvanta...
A: Business level strategies can be stated as the detailed actions taken to offer to clients and obtain...
Q: In year 2010, a saop manufacturer forecasts that demand of 2011 will be 200 lakhs of units of saop. ...
A: Forecasting is a process that uses historical data as inputs to make informed estimates that are pre...
Q: The maintenance department in Ranchi Hospital uses 816 cases of liquid cleanser annually. Ordering c...
A: Many firms instead of employing a reorder quantity formula when restocking items make orders dependi...
Q: Faizah is travelling to the United Kingdom for her 2022 family trip. She is planning to rent a car a...
A: Options for Car dealers Weekly rental Mileage allowance Extra cost Avis 275 36000 0.15 Europcar ...
Q: Day 1/Chapter 1 Case Study: Guided Practice WILLIAMS MACHINE TOOL COMPANY For 85 years, the Williams...
A: Any kind of alterations in the hierarchy can be understood as adjustments in the framework, procedur...
Q: _____ works at finding defects while ____ works at preventing defects a. Quality Control, Quality ...
A: Many individuals mistakenly assume that quality assurance and quality control are the same thing. Bo...
Q: Remit ancillaries plans to set up a production unit for 1000 motors and the management has identifie...
A: GIVEN: Faridabad: Fixed Cost = Rs. 64,00,000 Variable cost = 970 x 90,000 = Rs. 8,73,00,000 Gaziab...
Q: Explain the use of the PDSA and DMAIC cycles for continuous improvement.
A: PDSA, that stands for Plan, do, study,act and is used for filling up gaps during quality improvement...
Q: One might consider the innovation process to be threefold. What are the three processes and how imp...
A: The Innovation Process This procedure is divided into three stages: insight, recognition of the issu...
Q: Which of the following is not a goal of process improvement? a. increasing customer satisfaction ...
A: A Small Introduction about Process Improvement Process Improvement is the proactive assignment of r...
Q: process technology strategy
A: Process technology strategy indicating the decision regarding the direct and indirect process techno...
Q: Brands can be owned by any firm in the supply chain, whether manufacturers, wholesalers or retailers...
A: Let us first grasp the notion of brands at both the manufacturing and retail levels. Essentially, th...
Q: QUESTIONS Write a vision and a mission statement for Cutey Barber Salon. Why is it important for t...
A: Note: “Since you have asked multiple questions, we will solve the first question for you. If you wan...
Q: MRP is more than an inventory system; what additionalcapabilities does MRP possess?
A: Material requirement planning is the production system of planning, inventory control and scheduling...
Q: Organizations today operate in an environment of rapid, continuous change. How will you use “Greiner...
A: Greiner model constitutes of Time factor as it is variable in nature. Alterations in any organisatio...
Q: What is the minimum shipping cost?
A: Transportation problem helps to identify the least cost way for transporting the items from a source...
Q: Is Amazon Web Services an ERP system?
A: When practically all significant suppliers have opted to aggressively shift to the cloud, replacing ...
Q: Assess the impact of this situation on business performance and management decision making.
A: Given the fact that Synders works at a very large scale globally, it will have massive data collecti...
Q: Which of the following are the technological attributes that contribute to project complexity? N...
A: Project complexity is the characteristic of a project which makes it challenging to comprehend, anti...
Q: What is the d-ary tree's minimum feasible depth?
A: The depth of a tree is determined as the quickest or shortest pathway between both the root and the ...
Q: Explain the dimension of power in an organisation: First dimension (managing resources) Second dimen...
A: Organizational management is described as the process of controlling, leading, planning, and organiz...
Q: Consuela Chua, Inc., is a disk drive manufacturer in need of an aggregate plan for July through Dece...
A: given,
Q: What is Talisman's optimal inventory control policy; that is, its optimal order quantity Q* and re-o...
A: A Small Introduction about Inventory Management Stock management alludes to the most common way of ...
Q: D. The information related to project crashing is shown in the following table. Normal Duration (hou...
A: Find the Cost slope calculations below:
Q: ctual demand was 210 lakhs of saops , now using the smoothing constant choosen by the management of ...
A:
Q: What is the throughput time of a typical pallet? a. 222 minutes b. 90 minutes c. 10 minutes d....
A: The amount of time it takes a manufacturing to create a product, including process time, inspection ...
Q: Which of the following product flow types are characterized by high skill level? Continuous O Job sh...
A: Job shop uses general-purpose equipment and depends on the knowledge and skill of the workers. So, t...
Q: How will the company maximize its overall net profit?
A: The following information is given: Carpentry hours available= 1800 hours( 60 employees for 30 hours...
Step by step
Solved in 2 steps with 3 images
- Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 9 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing Processing time (hours per chair per worker) Stripping 3 2.5 Priming 2 1.5 Painting 3 1.75 Inspection 1 0.8 A truck loaded with 10 chairs arrives. How many hours will it take them to complete these 10 chairs?(The accuracy should be of two digits after the decimal places.)Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 90. The projected demand, lot size, and time standards are shown in the following table: LOADING... Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 110 units 90 units Standard processing time 0.30 hour/unit 0.75 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 50 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing…Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 110. The projected demand, lot size, and time standards are shown in the following table: Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 100 units 110 units Standard processing time 0.25 hour/unit 0.50 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 52 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing the firm's current capacity cushion? The number of workstations required next year is ?(Enter your response rounded up to the next whole number.)
- What is OEE and also calculate the OEE from the given data in below table. Item Data Shift Length 8 hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes Ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsC&A Furniture uses a four-step process to make its famous wood table: Processing Time Process Milling Table top Milling Table stand Assembly Finishing The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands. If the batch size is 10, what is the capacity of the process in tables per minute? A) 0.077 B) 0.05 C) 0.067 10 5 15 20 D) 0.048An assembly line requires two components: gadjits and wi-djits. Gadjits are produced by center 1 and widjits by center 2.Each unit of the end item, called a jit-together, requires three gadjits and two widjits, as shown in Figure 6.13. The dailyproduction quota on the assembly line is 800 jit-togethers. The container for gadjits holds 80 units. The policy variablefor center 1 is set at 0.09. The average waiting time for a con-tainer of gadjits is 0.09 day, and 0.06 day is needed to producea container. The container for widjits holds 50 units, and thepolicy variable for center 2 is 0.08. The average waiting timeper container of widjits is 0.14 day, and the time required toprocess a container is 0.20 day.a. How many containers are needed for gadjits?b. How many containers are needed for widjits?
- Parent S requires three of component T and two of component U. Both T and Uare run on work center 30. Setup time for T is 7 hours, and run time is 0.1 hour perpiece. For component U, setup time is 8 hours, and run time is 0.2 hour per piece. Ifthe rated capacity of the work center is 120 hours, how many Ts and Us should beproduced in a week?Jason Carter works for a producer of soaps that come inpackages of 6 each. His job is to fi ll the packages with soap, andhe is expected to process 30 packages an hour. Th e facility whereJason works uses a kanban production system in which eachcontainer holds 5 packages of soap. It takes 20 minutes to receivethe packages he needs from the previous workstation. How manykanbans are needed for the fi lling process?Up, Up, and Away is a producer of kites and wind socks. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table Wind Socks 10,000 units/year Item Demand forecast Lot size Standard processing time Standard setup time Kites 32,000 units/year 25 units 0.4 hourlunit 3.0 hours/lot 70 units 0.8 hour/unit 40 hours/fol The shop works two shifts per day, 8 hours per shift, 210 days per year. Currently, the company operates four machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year's demand without resorting to any short-term capacity solutions? The number of additional machines required is (Enter your response rounded up to the next whole number)
- d CE Additional Algo 5-11 Attrition Losses and Yields A process has three resources and two types of flows. The first flow has a demand of 20 units per day, and the second flow has a demand of 40 units per day. The first flow type visits all three resources, while the second flow type only visits the first and the third resources. The capacity is 100 units per day at the first resource, 40 units per day at the second resource, and 70 units per day at the third resource. 1. What is the demand total for each resource? Note: Do not round intermediate calculations. Resource Resource 1 Resource 2 Resource 3 Resource Resource 1 Resource 2 Resource 3 Type 1 20 20 20 Implied Utilization Actual Flow Rate 1 Actual Flow Rate 2 Type 2 2. What is the implied utilization for each resource? Note: Round your answers to 2 decimal places. 40 TO 40 Demand Total 3. What is the actual flow rate for each flow? Note: Round your answers to 2 decimal places.Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 100. The projected demand, lot size, and time standards are shown in the following table: Item Touring Mountain Demand forecast Lot size Standard processing time Standard setup time 5,000 units/year 100 units .25 hour/unit 2 hours/lot 10,000 units/year 100 units .50 hour/unit 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 50 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing the firm’s current capacity cushion?The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there is a sequence of assembly steps performed by five workers. Each worker does two tasks. Inventory buffers are allowed between workers. (a) What is the capacity and cycle time of this process? (b) What is the idle time of each worker if the process operates at full capacity? (c) Suppose two workers could be hired, F and G, and they take the same time to complete tasks as the current five workers. F and G can be assigned to work on the same pair of tasks as one of the current workers. For example, F could be assigned tasks T1 and T2 (just like worker A) while G is assigned T5 and T6 (just like worker C). They cannot be assigned tasks that are currently assigned to two workers. For example, F cannot be assigned to tasks T2 and T3 (because they are currently being done by workers A and B). What is the capacity of this process with workers F and G included?