Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each products price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week, no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Product A $2 Step 1 Station W (10 min) Raw materials Product B Step 1 Station X Raw materials Step 2 Station X (10 min) Purchased part (18 min) Step 2 Station Wi (10 min) Purchased part G Step 3 Station Y (19 min) Step 3 Station Y (12 min) Which of the three workstations, W, X, or Y has the highest aggregate workload, and thus serves as the bottleneck for CKC? response as an integer) Product A Price: $55/unit Demand: 85 units/wk Product: B Price: $65/unit Demand: 80 units/wk with a total load time of minutes. (Enter your

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question

Note:-

  • Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism.
  • Answer completely.
  • You will get up vote for sure.

 

 

Any help please just confused

Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W.X
and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and
each products price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles.
CKC can make and sell up to the limit of its demand per week, no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work
on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operabes one 8-hour shift per day, or 40 hours/week.
Product A
$2
Step 1
Station W
(10 min)
Raw materials
Product B
50
Step 1
Station X
(18 min)
Raw materials
Step 2
Station X
(10 min)
Purchased part
Step 2
Station W
(19 min)
Purchased part
G
Step 3
Station Y
(19 min)
Step 3
Station Y
(12 min)
Which of the three workstations, W, X, or Y has the highest aggregate workload, and thus serves as the bottleneck for CKC?
response as an integer)
Product A
Price:
$55/unit
Demand: 85 units/wk
Product: B
Price:
$65/unit
Demand: 80 units/wk
with a total load time of minutes. (Enter your
Workstation X
Workstation Y
Workstation W
Transcribed Image Text:Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W.X and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each products price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week, no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operabes one 8-hour shift per day, or 40 hours/week. Product A $2 Step 1 Station W (10 min) Raw materials Product B 50 Step 1 Station X (18 min) Raw materials Step 2 Station X (10 min) Purchased part Step 2 Station W (19 min) Purchased part G Step 3 Station Y (19 min) Step 3 Station Y (12 min) Which of the three workstations, W, X, or Y has the highest aggregate workload, and thus serves as the bottleneck for CKC? response as an integer) Product A Price: $55/unit Demand: 85 units/wk Product: B Price: $65/unit Demand: 80 units/wk with a total load time of minutes. (Enter your Workstation X Workstation Y Workstation W
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,