Briefly Explain the Following: Critical Role of a Feedback System Key Components of Effective Project Monitoring Major Tasks of Project Audit/Closure Audit Life Cycle Retrospectives
Q: Discuss the scope of project risk management.
A: Disclaimer: Since you have asked multiple question, we will solve the first question for you. If you…
Q: Explain the difference between Leading metric and Lagging metric and which one is used for Project…
A: The success of an organization is measured through key performance indicators, ensuring that the…
Q: State two (2) advantages associated with the use of the payback method of project appraisal.
A: Project appraisal is the process of checking and measuring the viability of the proposal of any…
Q: Describe how you will assess the risk of the project using predictive project analytics
A: Predictive project analytics allows project directors to identify the proper levels for controls…
Q: A project manager states that he is involved in monitoring and controlling project costs for the…
A: Here, the correct answer is option (a).
Q: please help Running Case1 The Global Treps Project team is working hard to ensure they meet…
A: Given data is
Q: Project staffing levels
A: A Project staffing plan is used to get a clear picture of headcount additions and reductions in a…
Q: The University of Professional Studies, Accra (UPSA) aims to evaluate students’ academic…
A: Summary of the topic The University of professional Accra (UPSA) evaluated the student academic…
Q: Which of the following is NOT a tool or technique of Qualitative Risk Analysis? A. Risk urgency…
A: Qualitative Risk Analysis is all about figuring out prioritizing each risk and figuring out its…
Q: Given your understanding of the Earned Value Management practice, provide the specific type of…
A: Earned value management is also know as Earned value analysis. It is a method through which a…
Q: Solve the questions: Tony and his team identified some risks during the first month of the…
A: given, : Tony and his team identified some risks during the first month of the Recreation and…
Q: What is the name of one of the popular certifications provided by the Project Management Institute?…
A: The PMP is that the core business saw the approval of the project managers. it is evident because…
Q: four key stages in project risk management
A: Note: I have answered for 1st question. kindly post the remaining questions separately. Project risk…
Q: What are the most common reasons for project failure? How do agile and predictive methodologies seek…
A: Any organization or project can lead to project failure. There are so many reasons for project…
Q: 1- Explain what you understand about the Project Monitoring!
A: Note: We'll answer the first question since the exact one wasn't specified. Please submit a new…
Q: Define project process and how organizations benefit from adopting those processes oriented towards…
A: The process has grown in the most efficient ways to how an industry is regulated for reaching…
Q: The process of developing methods for responding to project risks is called: a. Plan risk…
A: The risk reaction arranging implies deciding approaches to lessen or wipe out any dangers to the…
Q: Discuss below steps in the project selection process Develop a set of criteria against which the…
A: As per Bartle's guidelines for multi-part questions, the first three parts are answerable, please…
Q: Discuss how project managers can develop a quality-conscious approach to managing project…
A: The basic steps for Project management are Initiation, Planning, Execution, Monitoring & Control…
Q: Identify any 10 risks connected with IT project management. Define risk management for projects and…
A: Risk management is all about looking at your project's goals and determining what dangers they face,…
Q: Think of project that you have worked on. Describe what made the project manager for that project…
A: For any project, project manager and how he manages the project decides the project efficiency.…
Q: Define Project Management plan with respect to the following points? · The role of the…
A: In every organization, there is some kind of manufacturing activity and industrial process which is…
Q: Critically discuss the concept of Project Management in relation to how it may contribute to the…
A: Project management is the application of knowledge, expertise, procedure, tools, and procedures to…
Q: What are the most common reasons for project failure? How do agile and predictive methodologies seek…
A: Any organization or project can lead to project failure. There are so many reasons for project…
Q: Tony and his team identified some risks during the first month of the Recreation and Wellness…
A: Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: Evaluate the below statement according to the project management terminologies and choose the…
A: Project management is - the process of conducting the task of a team to accomplish all project…
Q: Kloppenberg et al (2019:392) define project quality as “the characteristics of a product or service…
A: Given: “The characteristics of a product or service that bear on its ability to satisfy stated or…
Q: Discuss what criteria are applied in an organization in order to proceed with a project, and what…
A: Ans: every project will have certain criterias whether to go ahead with the same or not. This will…
Q: control systems and examines how this may aid buyers of project ideas
A: Internal controls structure is made up to control the internal environment, activities, and…
Q: What do you understand by the term organizational development? What trends are shaping the…
A: Organization refers to a group of individuals engaged in the pursuit of established goals. It can be…
Q: If we don’t know our history, we are doomed to repeat it. Knowing an organisation’s past failures…
A: Decision making is very essential and crucial part of management process. And it is very important…
Q: (a). You are the System Analyst for VIP Transport Company Ltd. The company wants to develop a…
A: Explanation : A feasibility study assesses the operational, technical and economic merits of the…
Q: 1. Which of the following is NOT an objective of the Monitor Risks process? a. Determine if…
A: Risk monitoring is the process that would track and evaluate the level of risk i a project or…
Q: FIVE key areas to be focused to kick start the implementation of Project Portfolio Managemen
A: Managing multiple projects at once (otherwise known as project portfolio management), then, is a…
Q: iscuss the project
A: Project Controls is a process that includes the assets, methods, and devices for the arranging,…
Q: A college planned for a major project to understand the readiness of the college to conduct online…
A: For any project, whether it is a minor project or a major project, its success is definable and also…
Q: Discuss what criteria are applied in an organization to decide whether or not to proceed with a…
A: There are a few elements to consider while deciding whether or not you have a project on your hands.…
Q: Based on the information below, prepare a comprehensive report that includes the following: Your…
A: BFHI is the basic way of the task with a length of 48. Least span subsequent to slamming is 42…
Q: List and critically discuss the Four Core Quality Concepts Discuss the six success factors for…
A: Quality is the entirety of features and components of a good that bears on its capability to satisfy…
Q: The PMBOK categorises risks into internal and external factors. Anne found that her working…
A: The company will take up a project to gain profits for the company. The company will first analyze a…
Q: https://www.space.com/nasa-picksspacex- blue-origin-private-moon-lander-companies. Communication is…
A: Project Management involves the plan, processes, tools, and schedule of how a project would be…
Q: Name and briefly define at least three (3) leading authorities/standards in Project Management? What…
A: No two projects are the very same (in any event, when you're utilizing handy features like project…
Q: Develop a response strategy for one of the negative risks and one of the positive risks. Enter the…
A: A risk is an inevitable and unavoidable event but happens to be an integral part of the life of a…
Q: Kloppenberg et al (2019:392) define project quality as “the characteristics of a product or service…
A: Since you have asked multiple questions, we will answer the first question for you. If you want a…
Q: A soft skills program is likely to include modules on: a. social etiquette and desirable personal…
A: Soft skills can be described as those skills that show an individual's personality and attitude…
Q: In order to increase the overall quality of your project, could you briefly describe any two of the…
A: Project quality management involves the activities of measuring the quality of a project. The main…
Critical Path Method
The critical path is the longest succession of tasks that has to be successfully completed to conclude a project entirely. The tasks involved in the sequence are called critical activities, as any task getting delayed will result in the whole project getting delayed. To determine the time duration of a project, the critical path has to be identified. The critical path method or CPM is used by project managers to evaluate the least amount of time required to finish each task with the least amount of delay.
Cost Analysis
The entire idea of cost of production or definition of production cost is applied corresponding or we can say that it is related to investment or money cost. Money cost or investment refers to any money expenditure which the firm or supplier or producer undertakes in purchasing or hiring factor of production or factor services.
Inventory Management
Inventory management is the process or system of handling all the goods that an organization owns. In simpler terms, inventory management deals with how a company orders, stores, and uses its goods.
Project Management
Project Management is all about management and optimum utilization of the resources in the best possible manner to develop the software as per the requirement of the client. Here the Project refers to the development of software to meet the end objective of the client by providing the required product or service within a specified Period of time and ensuring high quality. This can be done by managing all the available resources. In short, it can be defined as an application of knowledge, skills, tools, and techniques to meet the objective of the Project. It is the duty of a Project Manager to achieve the objective of the Project as per the specifications given by the client.
Step by step
Solved in 2 steps
- Cousins Jeri Lynn DeBose, Tish Hoover, and Josephine (Joey) Parks looked forward to meeting up during the Christmas holidays to compare notes on the results of midyear teacher evaluations. All were public school teachers in districts scattered over the state. In the pressured search for new levels of teacher accountability demanded by legislators, the state department of education joined 16 other States in implementing a new teacher evaluation system. The goal is to hold teachers account-able for student learning progress in the classroom. Under the guidance of the National Council for Teacher Quality, criteria varies by State, but in most cases, 40 percent of each teacher's accountability score would be based on the principal's evaluation and ranking based on personal observation, 30 percent would be based on personal observation by a master teacher from outside the district, and the Other 30 percent would be based on student test score gains. The state department of education would set a performance goal each school district, and the principal would set a performance goal for each teacher. In preparation, the State conducted intensive training sessions for principals and designated master teachers who would conduct the evaluations based on four class observations per teacher. Officials used standardized achievement tests to derive value-added scores that measure student learning over the year. Teacher ratings were 1-5, with I am being the lowest and 5 representing near perfection. The publication of the first year's evaluations stirred interest and controversy, particularly among teachers who worried about the possible long-term effects on job retention and tenure. Now, with the first-year evaluations in hand, the three cousins pored over their experiences. The three represented different types of school systems within the state. Jeri Lynn worked for a metropolitan system in the state capital. The system included many low-income students whose first language was nor English, and several schools within the system were teetering on the brink of State takeover if improvement in student scores didn't materialize this school year. Tish worked in a county System dominated by upper-income residents, and Joey taught in the rural community in which all three grew up. The rural community had high unemployment, and a low percentage of graduates went on to college. As a result, the cousins came to the table with differing teaching experiences. "The numbers are all over the place," Jeri Lynn remarked as she studied the pages. "The whole system is flawed, and they need to make changes," Joey said. " It's too subjective. The principal and master teacher observations are subjective because there are personal factors that affect a true outcome." "Yeah, look at the numbers from your upper-income district," Jeri Lynn said to Tish. " How can 60 percent of the teachers score 5s?" Tish chuckled. "Yeah, lucky us. Our schools are overflowing with children from wealthy families. These are the kids who will apply to Ivy League schools. I can tell you that the principals are going to avoid confrontation on all fronts. No principal is going to give any indication that their students are receiving an education that's less than perfect, and that means cramming the rankings with 5s. They claim a higher level of motivation for students, and thus the selection of an elite team of educators. So with those pressures, I don't think we get personal feedback that IS accurate." "At the other end of the spectrum, we have my rural district," Joey said. "The big problem is that the principals know everyone and have longstanding relationships with everyone in the county, so I think scores are based on personal history. We could almost predict who would get high or low scores before the observations. For principals, it can go back as far as 'his daddy and my daddy hated each other in high school, and now I get to evaluate his daughter." "I think that in many cases, principals feel pressure to align scores with state expectations. The stare expected my district to have high scores and expected rural schools such as yours to be lower," Tish said. "But isn't that partially offset by lower goals for the rural school distracts responded Joey. "The key to the accountability system is the principal in each school," Jeri Lynn suggested. "With several of the schools in Metro teetering on the edge of state takeover by the end of the year, we had lots of strict principals who wanted to hold our feet to the fire with lower scores." "I thought the whole idea was to provide the teachers With feedback so that we would know the areas where we need improvement," Tish said. "The principals were supposed to conduct two observations in the fall and two more in the spring," Jeri Lynn said. think that's asking too much of them when they already have so much on their plates. I think a lot of them are skimping on their visits. know I only had one observation last semester, and I'm sure Mr. Talley just faked the second set of numbers. The master teachers make only two observations a year, which may be more objective but counts for less." "I'm wondering, too, how a principal measure performance in a course area outside his area of expertise, such as math," Joey said. "If the guy has a phobia about math, anything the teacher says or does is going to 100k brilliant—thus a 5." Tish and Jeri Lynn looked at each other and laughed. Maybe we picked the wrong subjects," Tish said. "My question is one of perception," Jeri Lynn said. "A large percentage of my students are ELL. That affects their scores. How do you measure a 3 in my situation against a 5 for Tish? At the end of the school year, little Carlos is thrilled that his reading in English has improved, but there's no Big Bang here. a slow steady improvement that may not actually show up in big strides for a couple of years." "So, the question is how do they create a system that is fair?" Tish asked. "And accurate," added Jeri Lynn. Is a 1-5 grading System by principals and master teachers a valuable part of a feedback control system for teachers? Why?Cousins Jeri Lynn DeBose, Tish Hoover, and Josephine (Joey) Parks looked forward to meeting up during the Christmas holidays to compare notes on the results of midyear teacher evaluations. All were public school teachers in districts scattered over the state. In the pressured search for new levels of teacher accountability demanded by legislators, the state department of education joined 16 other States in implementing a new teacher evaluation system. The goal is to hold teachers account-able for student learning progress in the classroom. Under the guidance of the National Council for Teacher Quality, criteria varies by State, but in most cases, 40 percent of each teacher's accountability score would be based on the principal's evaluation and ranking based on personal observation, 30 percent would be based on personal observation by a master teacher from outside the district, and the Other 30 percent would be based on student test score gains. The state department of education would set a performance goal each school district, and the principal would set a performance goal for each teacher. In preparation, the State conducted intensive training sessions for principals and designated master teachers who would conduct the evaluations based on four class observations per teacher. Officials used standardized achievement tests to derive value-added scores that measure student learning over the year. Teacher ratings were I —5, with I am being the lowest and 5 representing near perfection. The publication of the first year's evaluations stirred interest and controversy, particularly among teachers who worried about the possible long-term effects on job retention and tenure. Now, with the first-year evaluations in hand, the three cousins pored over their experiences. The three represented different types of school systems within the state. Jeri Lynn worked for a metropolitan system in the state capital. The system included many low-income students whose first language was nor English, and several schools within the system were teetering on the brink of State takeover if improvement in student scores didn't materialize this school year. Tish worked in a county System dominated by upper-income residents, and Joey taught in the rural community in which all three grew up. The rural community had high unemployment, and a low percentage of graduates went on to college. As a result, the cousins came to the table with differing teaching experiences. "The numbers are all over the place," Jeri Lynn remarked as she studied the pages. "The whole system is flawed, and they need to make changes," Joey said. " It's too subjective. The principal and master teacher observations are subjective because there are personal factors that affect a true outcome." "Yeah, look at the numbers from your upper-income district," Jeri Lynn said to Tish. "How can 60 percent of the teachers score 5s?" Tish chuckled. "Yeah, lucky us. Our schools are overflowing with children from wealthy families. These are the kids who will apply to Ivy League schools. I can tell you that the principals are going to avoid confrontation on all fronts. No principal is going to give any indication that their students are receiving an education that's less than perfect, and that means cramming the rankings with 5s. They claim a higher level of motivation for students, and thus the selection of an elite team of educators. So with those pressures, I don't think we get personal feedback that IS accurate." "At the other end of the spectrum, we have my rural district," Joey said. "The big problem is that the principals know everyone and have longstanding relationships with everyone in the county, so I think scores are based on personal history. We could almost predict who would get high or low scores before the observations. For principals, it can go back as far as his daddy and my daddy hated each other in high school, and now I get to evaluate his daughter "I think that in many cases, principals feel pressure to align scores with state expectations. The stare expected my district to have high scores and expected rural schools such as yours to be lower," Tish said. "But isn't that partially offset by lower goals for the rural school distracts responded Joey. "The key to the accountability system is the principal in each school," Jeri Lynn suggested. "With several of the schools in Metro teetering on the edge of state takeover by the end of the year, we had lots of strict principals who wanted to hold our feet to the fire with lower scores." "l thought the whole idea was to provide the teachers With feedback so that we would know the areas where we need improvement," Tish said. "The principals were supposed to conduct two observations in the fall and two more in the spring," Jeri Lynn said. think that's asking too much of them when they already have so much on their plates. I think a lot of them are skimping on their visits. know I only had one observation last semester, and I'm sure Mr. Talley just faked the second set of numbers. The master teachers make only two observations a year, which may be more objective but counts for less." "I'm wondering, too, how a principal measure performance in a course area outside his area of expertise, such as math," Joey said. "If the guy has a phobia about math, anything the teacher says or does is going to 100k brilliant—thus a 5." Tish and Jeri Lynn looked at each other and laughed. Maybe we picked the wrong subjects," Tish said. "My question is one of perception," Jeri Lynn said. "A large percentage of my students are ELL. That affects their scores. How do you measure a 3 in my situation against a 5 for Tish? At the end of the school year, little Carlos is thrilled that his reading in English has improved, but there's no Big Bang here. a slow steady improvement that may not actually show up in big strides for a couple of years: "So, the question is how do they create a system that is fair?" Tish asked. "And accurate," added Jeri Lynn. What do you see as the major strengths and flaws in the feedback control system used in the schools in this scenario? What changes do you recommend to overcome the flaws?A recent report on executive awareness of and involvement in corporate pandemic preparedness by Michael Evangelides, principal at Deloitte Consulting LLP, most top executives and boards of directors are not engaged in the influenza pandemic planning process and won't give it equal billing to other potential disruptions until at least one of the following occurs: • Media attention to pandemic influenza increases. • Legislation or regulation emerges, requiring a high level of preparedness. • Shareholders and investors demand a high level of preparedness. • The financial impact of a pandemic on the corporation becomes evident. Obviously, planners can do little to nudge along the first three prerequisites. But, fortunately, the fourth is in their sphere of influence. And it is worth pursuing, says Penny Turnbull, senior director of crisis management and business continuity planning at Washington, DC–based Marriott International, Inc. "It certainly helps focus the minds of our senior…
- Problem Diagnosis to be researched, analyzed, and developed for XYZ pharmaceutical company. In this section you will objectively examine the functioning of the organization being studied to explore the barriers hindering more effective and/or efficient functioning. Symptoms of the problem will be identified enabling you to conduct a cause analysis resulting in an accurate assessment of the actual problem. The Problem Diagnosis will be developed using the following guidelines: Analyze how well the organization is currently functioning. Determine one or two symptoms impeding better functioning in the organization. Justify your reasoning. Identify a diagnostic model to facilitate problem diagnosis. Provide rationale as to which model you chose. After a comprehensive analysis of the data generated from the diagnostic model, identify the primary problem impacting the organization. Justify your decision and support with examples. Determine and describe several probable cause(s) of the…Prepare a brief report on how the methods may change to match the differing objectives of two campaigns; firstly a campaign to launch a new instant coffee product and secondly a campaign to promote equal opportunities in the work place. What are some assumptions and the evaluation methods? Provide a conclusion.Participatory M&E is one the best ways in which one would deploy in evaluating a project or program, however this has several ethical issues linked with it. Identify five (4) of such issues and state how you would deal with each.
- In this case study, we explore the meticulous planning and execution of a charity fundraising gala to support a local nonprofit organization. The gala aimed to raise funds for underprivileged children's education and healthcare. The organizing team faced the task of coordinating a luxurious evening event, complete with entertainment, fine dining, and silent auctions, all while staying within a limited budget. They also had to secure sponsorships, promote the event effectively, and ensure that all proceeds went directly to the cause. The study examines how the team managed to achieve their goals by leveraging volunteer support, creative cost-saving measures, and building partnerships with local businesses. Question: How did the organizing team balance the desire for an upscale gala with the need to maximize funds for the charity, and what strategies can be adapted for similar fundraising events with limited resources?What does it mean to state that for variance analysis to be effective, it shouldresult in better communication between managers?Explain other aspects of the goal information system?
- please help Running Case1 The Global Treps Project team is working hard to ensure they meet expectations, especially for the people who will be holding and participating in the four events. The team has a detailed scope statement, but you want to make sure you are not forgetting requirements that might affect how people view the quality of the project. You know that the project’s sponsor and other key stakeholders are most concerned with getting people to use the new website, having successful events, and helping promote entrepreneurship across the globe. You also know that various geographic and cultural issues will need to be addressed. 3. After analyzing survey information, you decide to create a Pareto chart to see which types of guidelines for running an event generated the most interest. First, create a spreadsheet in Excel using the data in the following table. List the most frequently requested guidelines first. Use the attached Excel template pareto_chart.xls:What is involved in medium-term planning and control?Create a SWOT analysis mind map for a project aimed at improving the teaching and learning services provided to Information Systems III B students.