A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers' paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are
Q: Two plates are held together by 3, 23 mm diameter bolts. If a 11 kN load is applied to the plates in…
A: Number of bolt = 3 Diameter of bolt (d) = 23 mm Load (P) = 11KN
Q: A frame and loading are shown. B P 120 mm 120 mm D 120 mm 90 mm Determine the force acting on member…
A: Given:P = 320 NRequired:Force at C
Q: Q1-2/ If the apparent specific gravity of a porous soil, G, is 1.25 and its porosity, n, is 40%.…
A: Given data,apparent specific gravity of porous soil is G=1.25porosity FINDreal specific gravitydry…
Q: A concrete mix includes 360kg cement and 162kg water per cubic meter and no admixture is used. The…
A: A concrete mix includes the following ingredients per cubic meter:a. Cement = 360 kgb. Water = 162…
Q: The A-frame shown is pin-connected at A, B, C, and D. The surface at E is level and frictionless.…
A: To find support reaction and pin reaction at B,C,D
Q: How can I calculate the water level in a grit chamber at average flow and at peak hourly flow. The…
A: Average daily flow rate, Width of tank, Length, Depth, Elevation, To find: HRT at average…
Q: Draw the shear and moment diagrams for the beam.
A: The given beam is shown below.
Q: For a given HVAC water piping system, a pressure of 67 ft of head is required to produce 44 GPM…
A:
Q: uired information TE: This is a multi-part question. Once an answer i owe scissors roof truss is…
A:
Q: Q1-3/Put a Circle around the correct Answer in the following questions/ 1/ Texture of Sand is, (a)…
A: Sand is compared with silt and clay to define its texture. Clay is compared with sand and silt to…
Q: F-2.5m high 4m Mass - 100kg COG 1m Mass - 100kg COG-3m 4m
A: Center of gravity The center of gravity is the average, or mean, point of the force of gravity on an…
Q: Commuters choose auto or bus for their trips. The utility function for each travel mode was…
A: Utility function, Values of auto, bus, rail are given.To find: (a) Mode splits of auto and…
Q: For the If the chemical composition of cement is as follows (CaO=60%, SiO2 =25.6%, Al203= 3.8%,…
A: Chemical composition of cement :
Q: What are the possible pavement recommendation
A: Pavements are important for providing safe, durable, and efficient surfaces for transportation and…
Q: Figure -2m 101 > Pri
A:
Q: Please calculation all reactions on this beam and shear force and bending moment diagrams. Need…
A:
Q: P8.13 WP Two uniformly distributed loads w = 3,600 lb/ft act on the simply supported beam shown in…
A: A two sided overhanged simply supported beam is loaded as follows
Q: Following Newmark's method, calculate average stresses at the bottom and the top of the clay…
A: q= 100Kn/m2unit weight of clay = 18.5 kN/m3w=22%
Q: For linear stress variation over the base of the dam of the figure, find where the resultant crosses…
A:
Q: The rigid bar EFG is supported by the truss system shown. Knowing that the member CG is a solid…
A: Given Load PSpan 12 ftTo find out Normal stress in CG
Q: Explain a Contact Curve?
A: A contact curve is a mathematical concept that describes the set of points where two curves in a…
Q: Request: use Excel Spreadsheet Classical_Settlement_Shallow.xls to finish the homework and print out…
A: Given data,B=6ftD=2ftP=100k
Q: Part 2- Estimate Build Costs The land you are planning to buy for the brewery is for sale for…
A: The cost range for different work items is shown in the above. Using three-point estimation, we have…
Q: The velocity profile of a liquid flowing through the pipe is approximated by the truncated conical…
A:
Q: The X and Y coordinates (in feet) of station Shore are 654,127.06 and 394,087.32, respectively, and…
A: X coordinate of station shore, Y coordinate of station shore, X coordinate of station rock, Y…
Q: Answer using slope deflection method only, use the picture below as guide for the formulas. thanks…
A: A continous beam is loaded as follows:
Q: A horizontal channel with rectangular cross-section has a width of B₁ = 3 m and depth of y₁ = 1.55…
A:
Q: 10.29. The symmetrical frame shown in Fig. P10.29 supports a uniform loading of p per unit length.…
A: The illustration of a frame with all the values is given. A uniformly distributed load acting on the…
Q: Get the bending moment diagram. 8kN/m ΕΙ 4m B 10KN EI + -2m 2m 8kN/m EI 4m D
A: A continuous beam is given we need to draw the bending moment diagram
Q: The following table shows the productions and attractions used in the first iteration of a trip…
A: The following table shows the productions and attractions used in the first iteration of a trip…
Q: The hollow cylindrical cast iron column is 4m long with both ends fixed. Determine the minimum…
A: A hollow cylindrical cast iron column,Length= L= 4m= 4000mmPsafe= 250kNFos= 5σc= 550kN/mm²Rankine's…
Q: P8.21. Compute the deflection at B and the slope at C in Figure P8.21. Given: El is constant. 3…
A: Given DataEI = Constant Determine the slope at C and deflection at B. Let us apply moment area…
Q: 9-21. Determine the reactions at the supports. Assume A is fixed and the joint at B is rigid. EI is…
A:
Q: Water is being pumped from a large lake to a reservoir 25 m above at a rate of 25 L/s by a 11-kW…
A:
Q: 8.3 A planned flexible load area (see Figure P8.3) is 2 m x 3.2 m and carries a uniformly…
A:
Q: The drill is jammed in the wall and is subjected to the torque and force shown in 20 N-m 125 mm σA =…
A: A drill is subjected to torque, we need to find out the normal stress and transverse stress at point…
Q: 35m 40 m Dam The dam in figure 2 has a curved face, being part of a 40 m radius circle. The dam…
A: Given:Required:Magnitude and direction of resultant hydrostatic force per meter length
Q: Draw the shear and moment diagram for the given beam. Clearly label all points on the diagrams. For…
A:
Q: The following table provides data obtained during a specific gravity and absorption test on coarse…
A: The mass of oven-dry sample in the air (g), A = 2998.4The mass of the SSD sample in the air (g), B =…
Q: Explain the concept of model validation and verification, and its critical importance in engineering…
A: Important phases in the creation and application of models in engineering projects are model…
Q: If Vf = 2327 VPH with 9% trucks, VR1 = 653 VPH with 5% trucks, and VR2 = 594 VPH with 8% trucks,…
A: Hourly volume on ramp, Percentage of trucks on ramp, Hourly volume off ramp, Percentage of trucks…
Q: You first say that RA=57.1667. Then later in the problem you use the value 157.1667...what is the…
A:
Q: What are the key challenges in maintaining grid stability, and how are they addressed
A: Grid stability is a fundamental requirement for the reliable and efficient operation of electrical…
Q: Determine the reactions of the given beam using slope deflection method. P₁ = 25 kN, P₂ = 25 kN, and…
A: Given:P₁ = 25 kN, P2 = 25 kN, and w = 35 kN/mRequired:Support reaction and moment at D
Q: 4. Steel plate (2) b. Consider a point in a structural member that is subjected to plane stress.…
A: A stress element is given.Take normal compressive stress as (-)ive and tensile stress as…
Q: Problem 3 The beam shown below is subjected to the loads shown in the figure. Use the moment-area…
A: EI = ConstantDetermine the displacement at point C using moment-area method.
Q: Please
A: Length of span L=10mIntensity of uvl =45kN/mSince there is only one span fixed between two supports,…
Q: QUESTION 3) For the cross-section having uniform wall thickness given in the figure; a) Find the…
A: Shear stress is the effect of a force on a material, causing the material to deform by slippage…
Q: Determine the vertical displacement of joint A. Each bar is made of steel and has a cross-sectional…
A:
Q: 2- A 6-m wide concrete-lined trapezoidal channel (n = 0.013) has a sidewall slope of 1V:1.5H, a…
A: Bottom width of channel, Manning's constant, Side slope, Longitudinal slope, Discharge, To find:…
Civil engineering
Step by step
Solved in 3 steps with 3 images
- A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers' paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers’ paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…A client plans to construct a manufacturing plant that involves multiple engineering disciplines. Calculate the total engineering fees including taxes based on the following: Mechanical Works, $1,540,000 Electrical Works, $1,780,000 Earth Works, $950,000 Civil Works, $2,125,100 Environmental Works, $1,325,000 Basis B fees = 14% There are no office feesDo not include the Contractor payment in the engineering fees. Taxes = 13%
- The following table represents the activities of a small construction pro- ject that is required as follows Act. Dur. Dep. on A 5 B 12 C 7 A 10 E 7 2 D,E 12 D,E G 10 F 4 D,B H,G,F H,G,F M 2 K N M,L 1) Find the critical path and project implementation period. 2) The contractor stipulates a delay fine of one million dinars for each day of delay, the amount of the delay fines that the contractor will pay if the event is delayed (J) (6 weeks), knowing that a week is equal to (6 days). 3) The contractor applied the incentive system for workers within the activities G, D, so that the productivity of that group increased by 50%, what is the time period in which the project duration decreased. 4) The delay of the contractor in the implementation of the event (L) so that the total project period was delayed (3 weeks). VWhat is the period during which the event was delayed (L)? 5) Activity D.E is carried out using a specific machine. Will the contractor pay a late fine if only one machine is…Discuss overlap and underlap of subcontracted work and the problems associated with each condition.EROR Homewerk ENGR-14O WEEK 6 MARR = 30 %. Using IrUr, Show your work ard make a recomendation. Both options have vsefl laves of 3 yrs. Draw 3 CFDS to receive full credit. Use i- 20% and i- 4070 in your andysis A B. $140 Frst Cust $100 Cost e yr 3 $100 $0 10
- If you were bidding on a project in your own town, which of the following activities are not important when preparing the estimate: O a. Your commute time to the office O b. Bid our sub-contractor work OC. Visit the project site Od. Considering contingencyIn the execution of any project, the contractor's role and responsibility is to: Oa. maintain safety and adhere to the schedule b. manage the construction site Oc. Both (a) and (b) odinitiate and finance the project A Click Submit to complete this assessment. wN x *. AR DELLDiscuss “Contract System” of CNW KPK for civil construction work from inviting of tender to allotment of work
- CPM Construction plans to buy a truck for $150,000, andsell it for $15,000 at the end of five years. The annual operatingcost of the vehicle is $60,000. What is the equivalentannual cost of this truck, if the company uses a MARR of12%?I need all the parts otherwise skip, it's my first question on bartleby if I liked I'll purchase more so pls do it nicely so that I can buy againA civil engineer has 2 alternative designs for a house. Both designs involve the acquisition of awork force that will be provided by the owner and other capital equipment to be used for thisconstruction only.a. Design 1 calls for a workforce consisting of 5 men each costing P500/day. This designwill be finished in 4 months.b. Design 2 calls for a workforce consisting of 10 men each costing P350/day and isexpected to be finished in 3 months.In addition, there will be a project engineer who will supervise the work and will be paidP1000/day. His supervision will be required during the entire construction period.Disregarding material cost, how much is the total salary expenses for Design 1 and for Design 2.Assume that there are 24 working days in a month.