A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. What are the utilization and efficiency of the repair shop?
Q: A 1,500,000 SF plant employs 300 people and produces 242,000 LCD panel per month. The plant is idle,…
A: Given- No. of workers= 300Monthly production = 242,000 LCD panel per monthFixed costs = $3,000,000…
Q: What does a utilization of greater than one mean in practice?
A: The definition of utilization, this will observe that it is the ratio of the actual output based on…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Note: - As in the question it is specified to answer the 2nd question, only the 2nd question is…
Q: Given the following information, compute the efficiency and the utilization of the vehiclerepair…
A:
Q: snip
A: Design capacity = 300 units a day Effective capacity = 60% * design capacity = 60%*300 = 180 units a…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Current System: Number of labors = 5 Labor output = 80 carts per hour Wage per hour = $10 Machine…
Q: BBC is deciding whether to weld bicycle frames manually or to purchase a welding robot. If welded…
A: From the above given information, The investment costs for equipment if done manually, Fi = $18000…
Q: Determine the utilization and the efficiency for each of these situations:a. A loan processing…
A:
Q: Comment on the present system of Heartha Hardware and Construction Supplies. Using process…
A: Introduction: The term Market refers to an exchange of goods and services between the buyer and the…
Q: Generate (1) specific example of superior performance that you have seen as a customer, and generate…
A: Customer satisfaction is the key to success of a business. It doesn't come naturally. Delivering…
Q: Christopher's Cranks uses a machine that can produce 100 cranks per hour. The firm operates 12 hours…
A: THE ANSWER IS AS BELOW:
Q: Compare the following machines on the basis of their present worth. Use 12% per year. Machine A…
A: Present Worth Formula PW = Initial Cost - Annual Operating Cost*(PVAF,r,n) - Annual repair…
Q: Under ideal conditions, a service bay at a Fast Lube can serve 6 cars per hour. The effective…
A: Due to regulations that include quality issues, delays, as well as handling of materials, an…
Q: POIS proc per Calculate the probabilities of: a) no customers in 20 minutes; b) exactly one customer…
A: Below is the solution:-
Q: A department could generate an additional $520,000 in billable revenue each year if they could lower…
A: No-show rate = 0.8 patients per day Average per day visits for a PT = 6.5 Working days = 210 Number…
Q: Christopher's Cranks uses a machine that can produce 100 cranks per hour. The firm operates 12 hours…
A: Ideally: Production per hour = 100 crank Production per day = hours per day * production per hour…
Q: Our local maternity ward delivers 1,500 babies per year.On the average, 5 beds in the maternity ward…
A: Total no. of babies deliver per year= 1500 Average no. of beds which are filled= 5
Q: An all-you-can-eat buffet invites various types of customers. The ones who value food at $20 but eat…
A: Given - The restaurant gets no. of customers = 100 per day Type 1 customer food value= $20 Type 2…
Q: Hospital output has frequently been measured by bed day, or by number of cases admitted to or…
A: D.Cross-sectional comparisons
Q: For nearly 20 years, Cullumber Coatings has provided painting and galvanizing services for…
A: Here is the given data: Current Approach Automated Approach Sales $2,560,000 $2,560,000…
Q: Give an example of a good and a service that exhibit these seasonal demand patterns: Annual Monthly…
A: Let us first understand some terms related to the demand for a product. Demand for a good is said to…
Q: The university has an ongoing community project in which it uses a machine in its mechanical…
A: Here, we have following data, these are like widgets per hour, the lab could operate 12 hours per…
Q: What are the five types of customer-induced variability that impact service operations, according to…
A: Consumers are frequently involved in the service delivery process. Businesses must take proactive…
Q: State the process to check the accuracy of the simulation model in operations management
A: The learning simulation involves the recognition, articulation, data collecting, and simulator…
Q: Planning service capacity involves consideration of the mean arrival rate and the mean service rate.…
A: The quality of service indeed declines when the mean arrival rate exceeds or gets too close to the…
Q: A manufacturing shop is designed to operate most eficiently at an output of 550 units per day. In…
A: Hence, the utilization rate is 89.09%.
Q: . Which of the following questions is NOT related to operations management?a. When will the demand…
A: Operations management is defined as the administration of the business practices in order to create…
Q: The next TWO questions refer to the following data. (This data may not be the same as in the…
A: Find the Given details below: Given Details Job title Required time Receptionist 29450 PSR…
Q: create another example of parts per hour of work
A: Workers of company X work in a 5 day work week and the worked for 22 days in the month of November…
Q: Zanmale Enterprise operates bread baking company. It is able to produce 8400 1341 week. The…
A: Given Data: Producing capacity =Input=8400 unit Effective capacity=Output=9600 unit
Q: A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled…
A: We are allowed to do one question at a time. The answer is as below:
Q: A process currently services an average of 42 customers per day. Observations in recent weeks show…
A: Given, The average demand is 42 customers per day. Utilization is 90%. Demand in 5 years is 60%.…
Q: Owners of a local restaurant are concerned about their ability to provide quality service as they…
A: The number of relevant units of service that may be generated by a particular facility or service…
Q: Owners of a local restaurant are concerned about their ability to provide quality service as they…
A: Capacity is the capacity of an individual/machine to give a yield in a given time/asset.…
Q: I have no idea, please help me! 1. Assume that the arrival rate is increased to 1 customer per…
A: Arrival rate shows the average rate of customer that is arriving at a particular station or location…
Q: A furnace repair team that services an average of four furnaces a day if the design capacity is six…
A:
Q: A loan processing operation that processes an average of 8 loans per day. The operation ha design…
A: Efficiency is frequently calculated as a ratio of actual to anticipated production. On the other…
Q: If operated around the clock under ideal conditions, the fabrication department of an engine…
A: Capacity: Capacity can be described as the amount that can be delivered. Utilization:Utilization…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: a) Labor productivity is defined as the ratio of quantity produced to the number of workers.
Q: A machine cell uses 200 pounds of a certain material each day. Material is transported in vats that…
A: In this question, I would determine the number of vats that will be utilized. Given data,…
Q: A computer repair service has a design capacity of 80 repairs per day. Its effective capacity,…
A: Design capacity (DC) = 80 repairs per day Effective capacity (EC) = 64 repairs per day Output per…
Q: e new equipment, the company used 4 workers, who produced an average of 87 carts per hour. Workers…
A: Given that A Company used 4 workers, who produced an average of 87 carts per hour. Workers receive…
Q: A local restaurant is concerned about their ability to provide quality service as they continue to…
A: Given - Arrival Rate = 75 customers per hour Service Rate = 100 customers per hour
Q: A milling department has 10 machines. Each operates an average of eight hours before requiring…
A: Here, the number of machines is 10, which means population is finite. There is one adjuster, which…
Q: A Company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Given Information: Before Purchase of new equipment:- Number of workers used = 6 Wage of a worker =…
Q: A machine cell uses 200 lbs of a certain material each day. Materials is transported in vats that…
A: Let, "n" be the number of vats used. d=200 lbs per day t =2 ÷8 =0.25 c=120 lbs x=0.08 The formula…
Q: A department works on 8 hours shift, 288 days a year and has the usage data of a machine, as given…
A: Given- Machine usage data- Product Annual Demand (Units) Processing Time (Standard…
Q: Determine the utilization and the efficiency for each of these situations: a. A loan processing…
A: Utilization and Efficiency are calculated by the following formula. Ans 1: Given data, Actual…
Q: A machine cell uses 194 pounds of a certain material each day. Material is transported in vats that…
A: The concept used here is kanban container size.
Q: An important difference between service and manufacturing operations is that customers introduce far…
A: Characteristics of a service organization The main characteristics of the service industry that its…
A fleet repair facility has the capacity to repair 800 trucks per month. However, due to
Step by step
Solved in 2 steps
- JB Bunt's fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. What is the utilization of the repair shop?Shouldice Hospital in Canada is widely known for one thing—hernia repair! In fact, that is the only operation it performs, and it performs a great many of them. Over the past two decades this small 90-bed hospital has averaged 7,000 operations annually. Last year, it had a record year and performed nearly 7,500 operations. A hernia repair operation at Shouldice Hospital is performed by one of the 12 full-time surgeons assisted by one of seven part-time assistant surgeons. The first operations begin at 7:30 AM each day, Monday through Friday. Surgeons generally take about one hour to prepare for and perform each hernia operation, and they operate on an average of at most four patients per day. This four patient per day limit on the average number of operations performed per surgeon has been found to be the best operating level for the hospital as it takes into account time the surgeons need for patient exams and consultations, updating medical charts, writing reports, traveling to…9. Shouldice Hospital in Canada is widely known for one thing—hernia repair! In fact, that is the only operation it performs, and it performs a great many of them. Over the past two decades this small 90-bed hospital has averaged 7,000 operations annually. Last year, it had a record year and performed nearly 7,500 operations. A hernia repair operation at Shouldice Hospital is performed by one of the 12 full-time surgeons assisted by one of seven part-time assistant surgeons. The first operations begin at 7:30 AM each day, Monday through Friday. Surgeons generally take about one hour to prepare for and perform each hernia operation, and they operate on an average of at most four patients per day. This four patient per day limit on the average number of operations performed per surgeon has been found to be the best operating level for the hospital as it takes into account time the surgeons need for patient exams and consultations, updating medical charts, writing reports, traveling to…
- Shouldice Hospital in Canada is widely known for one thing-hernia repair! In fact, that is the only operation it performs, and it performs a great many of them. Over the past two decades this small 66-bed hospital has averaged 5,080 operations annually. Last year, it had a record year and performed nearly 5,580 operations. A hernia repair operation at Shouldice Hospital is performed by one of the 12 full-time surgeons assisted by one of seven part-time assistant surgeons. The first operations begin at 7:30 AM each day, Monday through Friday. Surgeons generally take about one hour to prepare for and perform each hernia operation, and they operate on an average of at most four patients per day. This four patient per day limit on the average number of operations performed per surgeon has been found to be the best operating level for the hospital as it take into account time the surgeons need for patient exams and consultations, updating medical charts, writing reports, traveling to…Explain how to decide whether a process is capable of delivering a service or product that meets the requirements.Shouldice Hospital in Canada is widely known for one thing—hernia repair! In fact, that is the only operation it performs, and it performs a great many of them. Over the past two decades this small 90-bed hospital has averaged 7,000 operations annually. Last year, it had a record year and performed nearly 7,500 operations. A hernia repair operation at Shouldice Hospital is performed by one of the 12 full-time surgeons assisted by one of seven part-time assistant surgeons. The first operations begin at 7:30 AM each day, Monday through Friday. Surgeons generally take about one hour to prepare for and perform each hernia operation, and they operate on an average of at most four patients per day. This four patient per day limit on the average number of operations performed per surgeon has been found to be the best operating level for the hospital as it takes into account time the surgeons need for patient exams and consultations, updating medical charts, writing reports, traveling to…
- Williams Performance Co. manufactures sports cars. After making a sale, the salesperson sends thecar to be detailed before the customer takes it home. Detailing the car takes 30 minutes at a cost of$15 per hour for direct labor and $5 per car for materials. If the company is open 5 days per week andsells an average of five cars per day, what is the average cost per 5-day week for detailing cars?The following data for 2021 are available for Canlubang AutomotiveCompany which manufactures and sells a single automotive product line.Unit selling price = 4Unit variable cost = 20Total fixed cost = 200,000a.) What is the break-even point in units for the current year?b.) Prepare a break-even chart for the operation in 2021 intervals of 5,000 units from 5,000to 30,000 units (show complete solution)Management of Mittel Company would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time 0.7 days Wait time (from order to start of production) 16.9 days Process time 2.7 days Move time 1.0 days Queue time 4.3 days 1. Compute the delivery cycle time. (Round your intermediate calculations and final answer to 1 decimal place.) 2. If by using Lean Production all queue time during production is eliminated, what will be the new MCE? (Do not round intermediate calculations. Round your percentage answer to 1 decimal place.)
- Hospital output has frequently been measured by bed day, or by number of cases admitted to or discharged from hospitals. Overtime, however, the typical admitted patient receives a greater intensity of services primarily attributable to technology. If you want to compare year-over year outputs you must account for this changes. What is the term we use to account for these adjustments so that we can compare apples to apples? A. Measure of effectiveness B. Output adjustments C. Intensity adjustments D. Cross-sectional comparisonsThe Holt Million Corporation’s plant manufactures two different products: X and Y. The plant has three different machines: A, B, and C. Each performs different tasks and can work on only one unit of material at a time. Details for each product are shown in the table below: Product X Y Demand Per Week 200 units 100 units Selling Price $150 $160 Machine Operation Required A, B, C B, B, C Operation Times in Minutes 20, 15, 15 15, 15, 15 Raw Materials Needed RM-1, RM-2 RM-2, RM-3 Raw Materials Costs RM-1 = $40/unit, RM-2 or RM-3 = $20/unit Each product uses raw materials with costs as shown in the above table where the processing times and the machine required for each operation are also shown. Each machine is available 4,800 minutes per week. There are no system foul-ups. Demand is deterministic (i. e., no uncertainty). Operating expenses, including labor (but excluding raw materials) total $12,000 per week. Assuming…The Holt Million Corporation’s plant manufactures two different products: X and Y. The plant has three different machines: A, B, and C. Each performs different tasks and can work on only one unit of material at a time. Details for each product are shown in the table below: Product X Y Demand Per Week 200 units 100 units Selling Price $150 $160 Machine Operation Required A, B, C B, B, C Operation Times in Minutes 20, 15, 15 15, 15, 15 Raw Materials Needed RM-1, RM-2 RM-2, RM-3 Raw Materials Costs RM-1 = $40/unit, RM-2 or RM-3 = $20/unit Each product uses raw materials with costs as shown in the above table where the processing times and the machine required for each operation are also shown. Each machine is available 4,800 minutes per week. There are no system foul-ups. Demand is deterministic (i. e., no uncertainty). Operating expenses, including labor (but excluding raw materials) total $12,000 per week. Assuming…