Where you have to put a warning sign for checkpoint if the design speed is 100km/hr, deceleration rate is 3.4m/s² with downgrade 2.5%, and driver reaction time is 0.50 sec?
Q: What is the difference between reporting that an object weighs 2 pounds and reporting that it…
A: this question is from surveying. this question is from chapter error and weight measurement. here…
Q: the box. What is the probability ?that both marbles are red
A: Solution: Given that, No of yellow marbles = 3 No of red marbles = 2 No of green marbles = 4 No of…
Q: The structure rests on a frictionless support at A and pin connected at E. Determine the internal…
A:
Q: Prob. 2.7-9. Two -in. nylon rods are spliced together by gluing a 2-in. section of plastic pipe over…
A: Shear stress "A sort of stress that acts coplanar with the cross-section of material," is how…
Q: Q3: The annual rainfall was measured in the Western Desert during a period of one year, and the…
A:
Q: Q.3 Determine the deflections at B and C for the beam shown in Fig. 2 using the conjugate beam…
A:
Q: Example 4.4 A fully penetrating artesian well is pumped at a rate Q = 1500 m³/day from an aquifer…
A:
Q: In the figure below, the horizontal bar ABC is supported by a pin at A and two rods with identical…
A:
Q: Determine the coordinates of the centrond of the shaded area. 25 80 y I Answers: X = i i 45 25 * 165…
A:
Q: Prob. 2.7-6. A pipe flange is attached by four bolts, whose effective diameter is 0.425 in., to a…
A: Note : Neglect the friction between pipe flange and concrete base. The Average shear stress is given…
Q: Determine the reactions at the supports of the beam. Assume that support at B is a roller and EI is…
A: Some standard formula for slope and deflection.
Q: 5. Determine the moment of inertia of the unequal 1-section about its centroidal Axes and find the…
A: Given data A1 = 200 × 10 = 2000 mm2 A2 = 10 × 300 = 3000 mm2 A3 = 300 × 10 = 3000 mm2 Centroid…
Q: In a plane strain problem in xy plane, the shear strain=12 x 10^-6 and the normal strain in x and y…
A:
Q: A simple beam of length L- 5 m carries a uniform load of intensity = 5.8 kN/m and a concentrated…
A: Given Data A simply supported beam is given with the following data Span length is 5 m A uniformly…
Q: What is Highway Bridge and its functions?
A: What is Highway Bridge and its functions?
Q: : Determine the displacement at C. Assume A is a fixed support, B is an internal hinge, and D is a…
A: Given data EI = constant In unit load method To find displacement or deflection at any point in…
Q: Q4) Given the following data: RL of the floor = 100.595m, staff reading on the floor =1.795m,…
A: Find height of the beam above the floor level.
Q: Solve the given problem in the image using SLOPE DEFLECTION METHOD.
A: In order to determine the moments at ends we will proceed as follows: 1. Find the fixed end…
Q: Determin the x- and
A: given:
Q: The assembly shown in the figure consists of a brass core (diameter d₂ = 0.25 in.) surrounded by a…
A: Given values: Assembly of brass core surrounded by steel shell. Brass core diameter, Db = 0.25 in.…
Q: A 3200-lb forklift truck is used to lift a 1700-lb crate in Figure 1. Determine the reaction at one…
A:
Q: 22. The forces F1 & F2 equal to 490 ton and 100000 N respectively. What is the ratio between the…
A: Forces and length of pipe arrangement is given as shown in figure above and it has been asked in the…
Q: Determine the moments in the beam at A, B. and C. O-15 1. What is MAB in kN-m? O15 Select the…
A:
Q: Q3: The annual rainfall was measured in the Western Desert during a period of one year, and the…
A: Given,
Q: 4. A venturi meter with throat diameter of 37.5 mm and coefficient of discharge of 0.957 is…
A:
Q: Q2: Determine the moment that each member exerts on the joints at C and D. Assume the supports at A,…
A:
Q: he hole by a distance x. Given: h = 0.85 m, a = 0.4 m, b = 0.7 m. Determine: by what distance x do…
A: Given:- h = 0.85 m, a = 0.4 m, b = 0.7 m. To find:- by what distance x do we have to move the…
Q: Darcy's equation is given by Eq. 1. In SI units the unit conversion factor C s equal to 1. Estimate…
A: DATA GIVEN,Length (L) = 1m=3.28083 ftViscosity (μ) = 1Pa.s=1000 cpPressure (p) = 1Pa=1.450377×10-4…
Q: brine. tly to into the water table. The concentration of chloride in the be img/L. The flow in the…
A: In this question ,we have to find out Hydraulic gradient i from given data
Q: Q2: Determine the moment that each member exerts on the joints at C and D. Assume the supports at A,…
A:
Q: Find the tensile stress in MPa in member AB shown in the figure. All connection bars have square…
A:
Q: Determine the vertical displacement of point C in inches by using the method of virtual work. A is a…
A:
Q: Road cum railway bridge
A: The fifth-longest bridge in India is the Bogibeel Bridge.Dibrugarh in Assam and Pasighat in…
Q: 44. A township is to treat 5,00,000 litres of sewage per day which has a 5 day BOD of 150 ppm. An…
A:
Q: In a plane strain problem in xy plane, the shear strain=12 x 10^-6 and the normal strain in x and y…
A:
Q: fair dices are tossed at the 2.3 same time. Find the probability of getting 1, 2 or 3 on the first…
A: The likelihood that an event will occur is quantified by probability.
Q: What is the probability that a value picked at random from the standard normal distribution will be…
A: This probability distribution curve is used in each and every subject of civil engineering
Q: Determine the design moment strength oMn (k-ft) of the section shown
A:
Q: al pump has an impeller of 500 mm external diameter and 200 mm internal diameter. It runs at 1000…
A: Given:- D=500mm d=200mm runs at 1000 rpm angle= 30 degree radial velocity=2m/s To find"- (a) Angle…
Q: Determine the nodal displacements and the element stresses, including principle stresses, due to the…
A:
Q: 19. A pump delivers a discharge to head of 30 m. Given, suction lift = 5.58 m, atmospheric head…
A:
Q: azimuth in
A: solution of above problem is below:
Q: e difference between a rock and a mineral?
A: Hi! Thank you for the question As per the honor code, We’ll answer the first question since the…
Q: 2. Determine the discharge in each pipe of the network shown in the figure by using the Hardy- Cross…
A: Given: Consider the loop given and assuming n=2 for all pipes. In Hardy Cross Method, Q values are…
Q: Loft Given the following tabulated data representing a sample from a concrete mix used in a bridge.…
A: Given Data The Compressive strength of concrete in MPa is given in the table. Cumulative frequency…
Q: Consider the three level sections shown in Table 1. i) If the width of the road, b=12 m,…
A:
Q: Knowing that the bracket AB has a uniform thickness of t, Base of theory of elasticity, determine…
A: Given A bracket having uniform thickness t Required Maximum principle stress
Q: Assume that a material has true stress - true strain curve given by: o = 100,000 £0.5 psi. Calculate…
A: GIVEN DATA:-⇒σ= 100000 ε0.5 psiW.K.T,⇒σ=k×εnwhere,⇒σT= True stress⇒εT= True strain⇒σe= Engineering…
Q: Maximum shear stress developed on the surface of a solid circular shaft under pure torsion is 240…
A: Given, τmax = 240 MPa
Q: The crane hook carries a load of 24 kN and the section at P-Q is rectangular as shown in the figure.…
A: Given :
Step by step
Solved in 2 steps
- Calculate safe overtaking sight distance for a two way traffic road for the following data. The speed of overtaking and overtaken vehicles are 50and 40kmph respectively. The acceleration is 3kmph/sec, design speed is 60 kmph and reaction time is 2seconds.Develop a signal timing for the intersection shown below. Assume values as necessary (provide justification on the assumptions). Level terrain Driver reaction time (t) = 1.0 s Vehicle deceleration rate (a) = 10 ft/s² Length of typical vehicle = 18 ft 375 One way PHF = 0.90 1,200 Target v/c = 0.95 Low pedestrian activity Average approach speeds: 35 mi/h WB 60 ft 40 mi/h NB Crosswalk widths = 10 ft Crosswalk setback = 2 ft 2,105 Walking speed = 4.0 ft/s NB grade = 3% WB grade = -1% l1 = e = 2.0 s 300 One way N 55 ft1. An equation has been calibrated for the amount of time (in seconds) required to clear N vehicles through a given signal phase (N>5): T= 2.04 +2.35N a. What start-up lost time does this equation suggest? b. What saturation headway and saturation flow rate are implied by the equation? 2 The saturation flow rate for an intersection approach is 3600 veh/h. At the beginning of a cycle (effective red) no vehicles are queued. The signal is timed so that when the queue (from the continuously arriving vehicles) is 13 vehicles long, the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds, what is the arrival rate, assuming D/D/1 queuing? 3 An intersection has a four-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in The table below Calculate the sum of the flow ratios for the critical lane groups. Phase Allowed movements Analysis flow rate Saturation flow rate…
- The speeds of overtaking and overtaken vehicles are 90 km/hr. and 70 km/hr. respectively on a two-way traffic road. The acceleration of overtaking vehicle is 4.5 km/hr./sec. and reaction time is 2 seconds. Calculate Safe OSD and Minimum length of overtaking zone?Develop a signal timing for the intersection shown below. Assume values as necessary (provide justification on the assumptions). Level terrain Driver reaction time (t) = 1.0 s Vehicle deceleration rate (a) = 10 ft/s² Length of typical vehicle = 18 ft PHF = 0.90 375 %3D One way 1,200 Target v/c = 0.95 Low pedestrian activity 60 ft Average approach speeds: 35 mi/h WB 40 mi/h NB Crosswalk widths = 10 ft 2,105 Crosswalk setback = 2 ft ↑ Walking speed = 4.0 ft/s NB grade = 3% WB grade = -1% l1 = e = 2.0 s 300 One way N 55 ftA highway section has a grade of -2%, a school zone is operated for 30 minutes before and after school time, the posted speed during the school zone will be 25 km/hr. A new sign will be installed to aware drivers about the school zone with a flashing light. Find the proper distance from the school zone that the sign should be located in a meter. Knowing that the traffic stream has a posted speed of 80 km/hr and the driver can recognize 1 in. of sign letter from 20 ft. The engineer summary for a spot speed study shows that there is a lot of speed violation, that some drivers drive 10% higher than the posted speed. The sign has a height of 5 in. Use default vehicle deceleration. one decimal answer for example 00.0, just a ut of Jestion value. Answer Next page 254 AM ROOD ENG 4/13/2021 W ProBook 4540s
- An approach to a pretimed signal has 25 seconds of effective green, a saturation flow of 1300 veh/hr, and a volume to capacity ratio less than 1.0. If the cycle length is 60 seconds and Allsop's delay formula estimates a delay of 34 sec/veh higher than the estimated using D/D/1 delay formula, determine the vehicle arrival rate (in veh/hr). Round off answers to 2 decimal places.An intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. 155 sec Calculate minimum cycle length O 100 sec 255 sec Phase O 60 sec Allowed movements. Analysis flow rate Saturation flow rate 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EBL, WBL 110, 80 veh/h 650, 600 veh.h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/hThe yellow time of an intersection movement was designed based on the speed limit of 35 miles/hour. If a driver is driving at 45 miles/hour is it possible for the driver to be trapped in dilemma zone. yes no
- Traffic Volume and Capacity If saturation headway of given traffic is 2.5 sec and the cycle time on a particular intersection is 65 sec. With green time as 25 sec and corresponding yellow time as 3.5 sec. If the start-up loss-time is 2 sec and clearance time is 1 sec, then the actual capacity of the vehicle per lane in veh/hour isBased on the following traffic speed frequency table, the median and 85th percentile speeds are approximately & respectively. Speed class (kph) 30- <40 40- <50 50- <60 60- <70 70- <80 80- <90 90- <100 100- <110 Frequency 8 12 20 25 22 15 8 a noneTRANSPORTATION ENGINEERING-TRAFFIC SIGNALS" Recent analysis at an approach to pre-time signalized intersection indicate that the volume-to-capacity ratio (v/c) is 0.8, htat saturation flow rate (s) is 1600 vehicles/hour, and the effective green time is 50 seconds. If the average delay, assuming D/D/1 is 11.25 seconds per vehicle, determine the arrival flow rate (vehicles/hour) and the cycle length.