Problem # 4: A company needs to improve its power factor to 0.95 lagging by connecting a 3-phase capacitor bank at a 3-phase motor drawing 50 kVA at 0.85 power factor lagging from a 230-V source. Find the required KVAR rating of the capacitor bank, the line current before and after the capacitors are added.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem 6.61P
icon
Related questions
Question
Problem #4:
A company needs to improve its power factor to 0.95 lagging by connecting a 3-phase capacitor bank at a
3-phase motor drawing 50 kVA at 0.85 power factor lagging from a 230-V source. Find the required KVAR
rating of the capacitor bank, the line current before and after the capacitors are added.
Transcribed Image Text:Problem #4: A company needs to improve its power factor to 0.95 lagging by connecting a 3-phase capacitor bank at a 3-phase motor drawing 50 kVA at 0.85 power factor lagging from a 230-V source. Find the required KVAR rating of the capacitor bank, the line current before and after the capacitors are added.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Single Phase Controlled and Uncontrolled Rectifiers
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning