McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of Items such as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labor costs (e.g., surgeons, anesthesiologists, radiologists, and nurses) associated with specific surgical procedures and tests are traced to individual patients. All other costs, such as depreciation of medical equipment, Insurance, utilities, Incidental medical supplies, and the labor costs associated with around-the- clock monitoring of patients are treated as overhead costs. Historically, McCullough has used one predetermined overhead rate based on the number of patient-days (each night that a patient spends in the hospital counts as one patient-day) to allocate overhead costs to patients. For the most recent period, this predetermined rate was based on three estimates-fixed overhead costs of $17,800,000, variable overhead costs of $110 per patient- day, and a denominator volume of 20,000 patient-days. Recently a member of the hospital's accounting staff has suggested using two predetermined overhead rates (allocated based on the number of patient-days) to improve the accuracy of the costs allocated to patients. The first overhead rate would include all overhead costs within the Intensive Care Unit (ICU) and the second overhead rate would include all Other overhead costs. Information pertaining to these two cost pools and two of the hospital's patients-Patient A and Patient B-is provided below: Estimated number of patient-days Estimated fixed overhead cost Estimated variable overhead cost per patient-day Direct materials Direct labor Total number of patient-days (including ICU) Number of patient-days spent in ICU ICU 2,000 $ 3,260,000 $ 236 1a. Predetermined overhead rate 1b. Total cost for patient A Patient A 1b. Total cost for patient B 2a. Predetermined ICU overhead rate $ 6,000 $ 28,750 2a. Predetermined Other overhead rate 2b. Total cost for patient A 2b. Total cost for patient B 14 0 Required: 1.Assuming McCullough continues to use only one predetermined overhead rate, calculate: other 18,000 $ 14,540,000 $ 96 Patient B $ 7,700 $ 39,000 a. The predetermined overhead rate. b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B. 21 7 2. Assuming McCullough calculates two overhead rates as recommended by the staff accountant, calculate: a. The ICU and Other overhead rates. b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B. per patient-day (Round "Predetermined overhead rate" to 2 decimal places. Round other Intermediate calculations and final answers to the nearest dollar amount.) per patient-day per patient-day Total 20,000 $ 17,800,000

Managerial Accounting
15th Edition
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:Carl Warren, Ph.d. Cma William B. Tayler
Chapter4: Activity-based Costing
Section: Chapter Questions
Problem 20E: Activity-based costing for a service company Crosswinds Hospital plans to use activity-based costing...
icon
Related questions
icon
Concept explainers
Topic Video
Question

A1

McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of Items such
as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labor costs (e.g., surgeons, anesthesiologists,
radiologists, and nurses) associated with specific surgical procedures and tests are traced to individual patients. All other costs, such
as depreciation of medical equipment, Insurance, utilities, incidental medical supplies, and the labor costs associated with around-the-
clock monitoring of patients are treated as overhead costs.
Historically, McCullough has used one predetermined overhead rate based on the number of patient-days (each night that a patient
spends in the hospital counts as one patient-day) to allocate overhead costs to patients. For the most recent period, this
predetermined rate was based on three estimates-fixed overhead costs of $17,800,000, variable overhead costs of $110 per patient-
day, and a denominator volume of 20,000 patient-days.
Recently a member of the hospital's accounting staff has suggested using two predetermined overhead rates (allocated based on the
number of patient-days) to Improve the accuracy of the costs allocated to patients. The first overhead rate would include all overhead
costs within the Intensive Care Unit (ICU) and the second overhead rate would include all other overhead costs. Information pertaining
to these two cost pools and two of the hospital's patients-Patient A and Patient B-is provided below:
Estimated number of patient-days
Estimated fixed overhead cost
Estimated variable overhead cost per patient-day
Direct materials
Direct labor
Total number of patient-days (including ICU)
Number of patient-days spent in ICU
ICU
2,000
$ 3,260,000
$ 236
1a. Predetermined overhead rate
1b. Total cost for patient A
1b. Total cost for patient B
2a. Predetermined ICU overhead rate
2a. Predetermined Other overhead rate
Patient A
2b. Total cost for patient A
2b. Total cost for patient B
$ 6,000
$ 28,750
14
0
other
18,000
$ 14,540,000
$ 96
Patient B
Required:
1.Assuming McCullough continues to use only one predetermined overhead rate, calculate:
per patient-day
per patient-day
per patient-day
$ 7,700
$ 39,000
21
7
a. The predetermined overhead rate.
b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B.
2. Assuming McCullough calculates two overhead rates as recommended by the staff accountant, calculate:
a. The ICU and Other overhead rates.
b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B.
(Round "Predetermined overhead rate" to 2 decimal places. Round other Intermediate calculations and final answers to the
nearest dollar amount.)
Total
20,000
$ 17,800,000
Transcribed Image Text:McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of Items such as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labor costs (e.g., surgeons, anesthesiologists, radiologists, and nurses) associated with specific surgical procedures and tests are traced to individual patients. All other costs, such as depreciation of medical equipment, Insurance, utilities, incidental medical supplies, and the labor costs associated with around-the- clock monitoring of patients are treated as overhead costs. Historically, McCullough has used one predetermined overhead rate based on the number of patient-days (each night that a patient spends in the hospital counts as one patient-day) to allocate overhead costs to patients. For the most recent period, this predetermined rate was based on three estimates-fixed overhead costs of $17,800,000, variable overhead costs of $110 per patient- day, and a denominator volume of 20,000 patient-days. Recently a member of the hospital's accounting staff has suggested using two predetermined overhead rates (allocated based on the number of patient-days) to Improve the accuracy of the costs allocated to patients. The first overhead rate would include all overhead costs within the Intensive Care Unit (ICU) and the second overhead rate would include all other overhead costs. Information pertaining to these two cost pools and two of the hospital's patients-Patient A and Patient B-is provided below: Estimated number of patient-days Estimated fixed overhead cost Estimated variable overhead cost per patient-day Direct materials Direct labor Total number of patient-days (including ICU) Number of patient-days spent in ICU ICU 2,000 $ 3,260,000 $ 236 1a. Predetermined overhead rate 1b. Total cost for patient A 1b. Total cost for patient B 2a. Predetermined ICU overhead rate 2a. Predetermined Other overhead rate Patient A 2b. Total cost for patient A 2b. Total cost for patient B $ 6,000 $ 28,750 14 0 other 18,000 $ 14,540,000 $ 96 Patient B Required: 1.Assuming McCullough continues to use only one predetermined overhead rate, calculate: per patient-day per patient-day per patient-day $ 7,700 $ 39,000 21 7 a. The predetermined overhead rate. b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B. 2. Assuming McCullough calculates two overhead rates as recommended by the staff accountant, calculate: a. The ICU and Other overhead rates. b. The total cost, including direct materials, direct labor, and applied overhead, assigned to Patient A and Patient B. (Round "Predetermined overhead rate" to 2 decimal places. Round other Intermediate calculations and final answers to the nearest dollar amount.) Total 20,000 $ 17,800,000
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Knowledge Booster
Costing Systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Managerial Accounting
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub
Financial And Managerial Accounting
Financial And Managerial Accounting
Accounting
ISBN:
9781337902663
Author:
WARREN, Carl S.
Publisher:
Cengage Learning,