If we used AW analysis instead of PW analysis to select a project, it will give us a different selection . True or false ?
Q: Table 1: Expected time, standard deviation and cost associated with each activity of a project…
A: From the above network diagram and table: a) critical path is the path with maximum expected time:…
Q: c. Suppose that the indirect costs of the project amount to $200 per day. Find theoptimal number of…
A: Given Data Activity Immediate Predecessor Normal Time Expedited Time Normal Cost Expedited…
Q: I wanted to clarify, in which project life cycle we have the preparation phase? For example, the…
A: In order to understand which stage in the project life cycle the production stage falls in, let us…
Q: Before answering the following questions, you must draw the arrow diagram, rectangles, network…
A: Expected Time= a+4m+b6 Where a= Optimistic time b= Pessimistic time m = Most…
Q: Alfred Korzybski is created with the quote, “The map is not the territory.” How does this quote…
A: The cite “The outline isn't the territory” from Alfred Korzybski, pleasantly summarizes the…
Q: a) What is the probability that the project can be completed in 25 days or fewer?
A: The expected activity time is the time taken by the particular activity to complete the project…
Q: Explain resource loading and resource leveling. Why would you level resources in a project?
A: Project management is nothing but the utilization of particular skills, methods, or techniques, and…
Q: Which process involves measuring against the project schedule baseline by looking to see what things…
A: Project schedule A project schedule can be explained as a plan for completing a project…
Q: Ssus and the management at yankee ltd. Want an expected time and variance for pest control activity…
A: Given: Optimistic time (a) = 2 weeks Pessimistic time (b) = 8 weeks Most likely Time (m) = 4 weeks…
Q: Find out the following: a. Sketch the whole network. b. Find out critical path by analyzing and…
A: Below is the solution:-
Q: What is the most important points that must be included in the analysis performance of the…
A: The analysis of the project performance is the procedure of contrasting the actual cost of the…
Q: (i) Write the scope of the project (ii) Provide the WBS for the project.
A: BELOW IS THE SOLUTION:-
Q: Given the following diagrams of progress on individualwork packages of a project answer the…
A: In the given Graph the project is behind the schedule.
Q: Project Typhoon has a net present value of $10,000 and a profitability index of 1.01. Project…
A: Net present value (NPV) is the difference between the current value of income and the present value…
Q: Financial methods provide objective analysis for project selection. Select one: a. True O b. False
A: Since you have asked multiple questions, we will answer the first question for you. If you want a…
Q: Þroject, Activity, Predecessor, Duration Below is a project listed in a table with: • activity, •…
A: Given- Activity Predecessor Duration (Weeks) A None 3 B A 7 C A 5 D B 12 E B 8 F C 5…
Q: Before answering the following questions, you must draw the arrow diagram, rectangles, network…
A: Given data is
Q: What should be included in the project's plan?
A: THE ANSWER IS AS BELOW:
Q: Construct a Gantt chart for the following set of activities and indicate the project completion…
A:
Q: What is the importance of variance analysis to project managers?
A: Variance analysis can be summed up as an analysis of the distinction between arranged and genuine…
Q: QI: For the project listed below, find the following items. 1- Total project finishing time 2-…
A: NOTE: Since you have posted a question with multiple sub-parts, we will solve the first three…
Q: For each of the following network diagrams, determine both the critical path and the expected…
A: b. The possible paths are: 1-2-4-6-8-9: = 5 + 18 + 3 + 4 + 9 2 = 41 weeks 1 - 2 - 5 - 6 - 8 - 9 = 5…
Q: A project has the following activities, with specified precedents and expected durations (in days).…
A: The AON diagram with the given table:
Q: Use the following project status information to calculate each of the requested EVM numbers below.…
A: Task Budget Cost Duration % Complete Actual Cost Planned Value Earned Value =% complete *PV A…
Q: Ssus and the management at yankee Itd. Want an expected time and variance for pest control activity…
A: Expected time is the estimated time required to complete the project activities to complete the…
Q: When developing a Work Breakdown Structure (WBS) for a project, your team can organize the second…
A: A work breakdown structure is a project structure method where the components, activities, and…
Q: The optimistic duration for a project is 10 weeks. The worst case estimate is 22 weeks, and the most…
A: t( p) = 22 t(o ) = 10 t(m) = 13 expected duration assuming beta distribution is t(e) = (t(o) +…
Q: A project to build a new bridge seems to be going very well since the project is well ahead of…
A: Given values: Planned Value (PV) = Estimated value of the work planned to be done Estimated Value…
Q: a. Draw a network diagram and determine the expected project completion time b. What is the…
A: Below is the solution:-
Q: Hoosier Burger Juan Rodriquez has assigned you the task of requirements determination for the…
A: a. Assume you are preparing the customer satisfaction questionnaire. What types of questions would…
Q: The activities, their durations and precedences for designing, writing and installing a bespoke…
A: Note: - Since the exact question to be answered is not specified we will answer the first question…
Q: Based on the case below, answer the following questions: The duration for the project is two year.…
A: The question is related to Project Management. The details are given.
Q: A. (5 points) Draw AON diagram of the project, including activity durations. B. (4 points) Based on…
A:
Q: Before answering the following questions, you must draw the arrow diagram, rectangles, network…
A: Find the given details below: Activity Dependency Optimistic Time(To) a(Weeks) Pessimistic…
Q: Show the project schedule by drawing Gant Chart in Microsoft excle for the given data:- Activity…
A: Given data is
Q: Why do you think resource allocation is important ?As a project manger which method will you use to…
A: What is Resources? Resource allocation is assigning the right people to work on the tasks necessary…
Q: Why do we evaluate projects and what is usually evaluated?
A: An approach for assessing the performance and effects of projects, initiatives, or policies is…
Q: 11-23 Tom Schriber, the director of personnel of Manage- ment Resources, Inc., is in the process of…
A: In a network diagram, the activities with no predecessor activities are initial activities. When an…
Q: Below matrix shows one of the important data used in project management, identify the name of the…
A: The matrix shown in the question is named as RACI Chart or RACI Matrix. The RACI Chart or RACI…
Q: Before answering the following questions, you must draw the arrow diagram, rectangles, network…
A: Find the Given details: Activity Dependency Optimistic Time(To) a(Days) Pessimistic Time(Tp)…
Q: The following CPM/PERT network represents a small project with 4 activities labelled A through D.…
A: Given data is
Q: What is the slack time for activity A? 7 5 3 0
A: Formula:
Q: 14 - In earned value analysis, we found that BCWP: $24,800 BCWS: $27,650 ACWP: $21,900 The project…
A: Earned Value Analysis (EVA): It is a system that enables the project manager to estimate the amount…
Q: Use a weighted score model to choose between three projects (A,B,C) for updating an important…
A: In the weighted scoring model, different criteria are assigned different relative weights by the…
Q: The network dlagram and task times for a project are shown below. A2 A4 A5 A3 Task Duration (days)…
A: Using Forward Path, find Early Start of the activity = Early Finish of predecessor activity Early…
Q: What are 2R and 3R projects? Where can you find the standards for those types of projects?
A: 2R projects is a sub category of (RRR) restoration, resurfacing and rehabilitation. 2R is considered…
Q: Given the following information for a one-year project, answer the following questions. Recall that…
A: *As per the guideline, the first three parts are answerable in multipart questions, please repost…
Q: The project described in the following table has just begun. It is scheduled to be completed in 11…
A: Given, Activity Estimated Time(weeks) StandardDeviation (wks.) 1-2 4 0.70 2-4 6 0.90 1-3 3…
If we used AW analysis instead of PW analysis to select a project, it will give us a different selection . True or false ?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Stinnett Transmissions, Incorporated, has the following estimates for its new gear assembly project: Price $1,220 per unit; variable costs = $3.75 million; quantity = 90,000 units. Suppose the company believes all of its estimates are accurate only to within ±15 percent. What values should the company use for the four variables given here when it performs its best-case scenario analysis? What about the worst-case scenario? Pls don't copy answer i give up voteWhat are three choices that may be used in a project depending on the layout of a decision tree? What method do you believe is the most efficient for collecting data and analyzing decisions?ew Assessment X G As an independent pro x vle.phoenix.edu/ultra/courses/_386284_1/grades/asse X The project you have been hired to turn around is one that was started 18 months ago and was managed by the then-director of customer service, who, after 20 years, has left for another opportunity. This project, like other projects at the company, is floundering. It is already six months behind schedule and over budget, and it lacks commitment from the four other functional groups who are key stakeholders: sales, accounting, IT, and order processing. The project you are charged with getting back on track and completing is for a new customer service system that is projected to create efficiencies, automate call center functions, and increase the quality of customer service. Use this scenario to address the following in 525 to 700 words using MS Word. 1. Assess two reasons why the previous manager may not have been the right person to run this project. The previous manager was the director of…
- Which of the following information is required from the client for 'preliminary estimating'? Select the BEST combination. Select one: а. Site location, risk register, project requirements, budget constraints. b. Site location, key dates, sustainability strategy, budget constraints. Site location, building use, risk register, budget constraints. ос. O d. Site location, building use, key dates, budget constraints.Montgomery Healthcare System is a health system that has 14 hospitals and 32 outpatient clinics. The leader is responsible for working with a team of health professionals to improve clinical errors, compile reports, implement evidence based management practices, and collaborate to provide training to health professionals at all levels. The leader is working with an interdisciplinary team of various specialties, backgrounds, and personalities. This is a high visibility project as the CEO wants weekly reports on progress based on the outcomes. Unfortunately there are a few team members that do not get along and it is challenging to get these professionals to work together to achieve the goals defined. Please remember to write from a 3rd person perspective and use references to support ideas, assumptions, and answers for this analysis. Thank you! Please write a paper describing the following: Who's on the team? Define team roles? What is the actual interpersonal conflict? How…Hoosier Burger Juan Rodriquez has assigned you the task of requirements determination for the Hoosier Burger project. You are looking forward to this opportunity because it will allow you to meet and interact with Hoosier Burger employees. Besides interviewing Bob and Thelma Mellankamp, you decide to collect information from Hoosier Burger’s waiters, cooks, and customers. Mr. Rodriquez suggests that you formally interview Bob and Thelma Mellankamp and perhaps observe them performing their daily management tasks. You decide that the best way to collect requirements from the waiters and cooks is to interview and observe them. You realize that discussing the order-taking process with Hoosier Burger employees and then observing them in action will provide you with a better idea of where potential system improvements can be made. You also decide to prepare a questionnaire to distribute to Hoosier Burger customers. Because Hoosier Burger has a large customer base, it would be impossible to…
- The decision was made by JMP management that a certain critical development in the overall project will be subcontracted-out to a vendor. JMP has issued a six-month cost plus fixed fee contract for that development, and you are the vendor's project manager. The approved JMP budget for your development is $500,000. A recent Earned Value Analysis that your firm (the vendor) has done shows that you will complete the project four weeks ahead of time, thus depriving your firm of $80,000 of billable time. Among your options are: 1. Since it was the approved budget, go ahead and bill JMP for the entire $500.000. 2. Inform JMP of the project status and completion date, and ask if they'd like to add any features to account for the monies spent. 3. Inform JMP of the project status and completion date. 4. Bill JMP for the $500,000 by adding more work at the end of the project.Randall Systems in considering four projects A, B, C and D that have risks associated with the producing benefits. Based on the information given in the table below, which project is more desirable for the company? Project A Project B Project C Project D EUAW Prob. EUAW Prob. EUAW Prob. EUAW Prob. $2,000 0.2 $3,000 0.1 -$5,000 0.2 $4,000 0.4 $1,500 0.5 -$2,500 0.4 $6,500 0.5 $2,500 0.3 $3,000 0.3 $3,500 0.5 $1,000 0.3 -$2,000 0.3The owner of Maxwell's Coffee and Cakes wants to start selling products that feature her coffee shop's logo. Her first product will be backpacks which she will sell for $137.44 each. She can buy the backpacks for $21.97 and have them customized for $10.92 apiece. There is a one-time set up charge of $1,525.15 for customization. In order for the project to go forward, she needs to show a $14,718.68 profit. How many backpacks will she have to sell in order for this project to be acceptable? Round to the nearest whole number.
- What are the benefits and downsides of SPI techniques, and what criteria should be utilised to choose a method that fits the needs of both the project and the business?choose the correct answer for the following questions 1. When composing a risk management plan, one of the activities is to define: Group of answer choices Methods Work breakdown structure Project charter Project Resource allocationThe initial step in developing an IFE Matrix is A)attaching a cost to each discrete activity. B)assigning weights to key internal factors. C)assigning ratings to key internal factors. D)obtaining weighted scores. E)developing a full and narrow list of key internal factors