If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily capacity of the system, assuming the company operates two, 8-hour shifts? Enter an integer value.
Q: Suppose it takes a color printer 12 minutes to print a design logo on a T-shirt. What is the…
A: Capacity of a process indicating the maximum available production unit in a specific period of time.…
Q: 1. Jeans manufacturing plant operation is one shift per day at 100% efficiency. Workers of this…
A: The takt time is time is the maximum acceptable time to meet the demands of the customer. In other…
Q: What is the maximum utilization a resource can achieve?a. A value equal to the demandb. A value…
A: d. 1.00
Q: A single model manual assembly line produces a product whose work content time = 47.8 min. The line…
A: Efficiency is the ability to reduce the wastage of resources, materials, and money in the production…
Q: A production line at V. J. Sugumaran's machine shophas three stations. The first station can process…
A: A Small Introduction about Bottleneck A bottleneck is a point of saturation in a supply chain (such…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: A firm uses a serial assembly system and needs answers to the following: An output of 900 units…
A: Given: Desired output = 900 units time = 7.5 hours work content at each station = 30 seconds
Q: A company makes two products X and Y, using a single resource pool. The resource is available for 8…
A: Availability of resources for production of X and Y = 8 hrs. (480 minutes) Unit load of X = 15…
Q: What cycle time would match capacity and demand if demand is 120 units a day, there are twoshifts of…
A:
Q: Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken,…
A:
Q: A production system is as shown below. Station 1 could produce 60 per hour if the rest of the line…
A: The following information is given: The system runs at a rate of 45 per hour (actual output)…
Q: For a given process, the raw processing time is 102 sec, the bottleneck cycle time is 20 sec/item,…
A: Given, Raw processing time = 102 seconds. Bottleneck cycle time= 20 seconds per items. Work in…
Q: A company makes two products X and Y, using a single resource pool. The resource is available for 8…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Cycle Time and Velocity, MCE Computador has a manufacturing plant in Des Moines that has the…
A: Theoretical Capability = 253,000 units Theoretical Capability = 253,000 units Actual Production=…
Q: Clients are served in a process with two resources. The first resource has a capacity of 14 clients…
A: Given data: Capacity for the first resource = 14 client/hour Capacity for the second resource = 15…
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: In a company that processes insurance claims, the average flow is 10 claims per hour and the average…
A: a) Based on Little’s Law , for an insurance company whose claims have the average flow rate of 10…
Q: capacity is determined by the number of machine used? True or False?
A: Capacity refers to the total number of units a firm is able to produce during a given period of time…
Q: It is election day and 1800 voters vote in their precinct’s library during the 10 hours thepolls are…
A: Inventory or stock is the products and materials that a business holds for a definitive objective of…
Q: First question in the image Question N0 2: A production line has an hourly throughput rate 6…
A: Given data - Task A Task B Processing time (Min) 9 12 No. of worker 1 1
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: Cans are made in a process with two resources. The first resource has a capacity of 11 cans per…
A: Given: 1st resource capacity =11 cans/sec2nd resource capacity =10 cans/sec 1st resource has workers…
Q: Mack’s guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically,…
A: Multifactor productivity (MFP), otherwise called complete factor productivity (TFP), is a proportion…
Q: Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per…
A: Given - Process Demand = 7.2 meals per hour 1st Resource capacity = 9.5 meals per hour 2nd Resource…
Q: Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to…
A: Tenants request residences for periods ranging from one month to a year, and in some cases even…
Q: Under ideal conditions, a picture frame manufacturing facility can produce 480 frames per day. Under…
A: Given data Under the ideal scenario, a firm manufactures 480 frames in a day Under a normal…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 30 loans…
A: Given, First resource capacity = 30 loans / hour Second resource capacity = 38 loans / hour Demand =…
Q: A work cell at Chris Ellis Commercial Laundryhas a workstation with two machines, and each unit…
A: Given Number of machines = 2 Production capacity of machine = 4 units/hour.
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 0.38…
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: Loans are evaluated in a process with two sequential resources. The capacities of the resources are…
A: Given, Loans are utilized in a process with two sequential resources with, Capacity C1 =0.16 loans…
Q: 30,000-seat college football stadium is used 18 times for games, concerts, and graduation…
A: It is given that the stadium has been used 18 times. So, the Resource used = 18 times
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Formula:
Q: RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods…
A: “Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: "Ruby runs a machine design shop that has 4 stages of process in succession. Stage i is cutting that…
A: Given data:
Q: A production line has three stations and the first station can process a unit in 10 minutes. The…
A: The capacity of any process is determined by its slowest resource and is measured in units per time.…
Q: T F For a food-processing plant such as Kraft Foods,capacity refers to the number of…
A: Capacity can be defined as the capability or the ability of the system that produce the output in a…
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: We have joined after 4 customers, hence there are a total of 5 customers in the system now
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Number of resources = 2 The capacity of resource 1 = 2.1 Apples pe minute The capacity of resource 2…
Q: A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product…
A: Given- A work system has five stages - Processing times for stages are 6, 4, 2, 8, and 10 mins/unit
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: Callers are helped in a process with two sequential resources. The capacities of the resources are 1…
A: Given, Two resources which are in series. So, the lower capacity will be bottleneck. Capacity of…
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
Q: her line can produce a unit in 10 minutes. The bottleneck is station (just fill in a number in this…
A:
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 21…
A: Given: Process Demand = 16 application/hourThe capacity of 1st resource = 21 Applications/hour The…
If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily capacity of the system, assuming the company operates two, 8-hour shifts? Enter an integer value.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- The magnetic resonance imaging (MRI) unit of St Francis hospital has 2 MRI machines and sees two kinds of patients, “regular” patients and “contrast” patients. The regular patients don’t need any special preparation before imaging but the contrast patients receive an injection of “dye” that enables the physicians to see the images more clearly. Regular patients require 15 minutes in an MRI machine whereas contrast patients take on average 25 minutes in an MRI machine. Over an 8-hour day, the MRI unit receives an average of 25 regular patients and 5 contrast patients. Convert the demand and capacity into "hours of work per day" to answer the following questions: (a) What is the implied utilization (as a %) of the MRI unit? % (Round your answer to whole number) Hint: First calculate the demand in hours of work per day: If there are 5 Contrast patients per day and each Contrast patient takes 25 minutes to 'process', how many 'minutes of work' are demanded every day from…The magnetic resonance imaging (MRI) unit of St Francis hospital has 2 MRI machines and sees two kinds of patients, "regular" patients and "contrast" patients. The regular patients don't need any special preparation before imaging but the contrast patients receive an injection of "dye" that enables the physicians to see the images more clearly. Regular patients require 15 minutes in an MRI machine whereas contrast patients take on average 25 minutes in an MRI machine. Over an 8-hour day, the MRI unit receives an average of 25 regular patients and 5 contrast patients. (a) What is the implied utilization (as a %) of the MRI unit? % (b) What are the actual and maximum flow rates through the MRI (patients per day)? regular contrast Actual flow rates Max flow rates.A department works one 8-hour shift, 250 days a year, and has these figures for usage of amachine that is currently being considered:ProductAnnualDemandStandard ProcessingTime per Unit (hr)Processing TimeNeeded (hr)1 400 5.0 2,0002 300 8.0 2,4003 700 2.0 1,4005,800Units of capacity needed = Processing time needed ___________________________ Processing time capacity per unit (5–3)Working one 8-hour shift 250 days a year provides an annual capacity of 8 × 250 =2,000 hours per year. Consequently, three of these machines would be needed to handle therequired volume:5,800 hours __________________ 2,000
- When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry Panel and CBC run, he spends, on average 2 minutes at patient check-in, 45 minutes in the waiting area, 5 minutes having his medical history updated, and 8 minutes having his blood taken. If the clinical laboratory has 3 full-time Lab Techs, operates 8 hours per day and demand is 75 patients per day, what is the takt time? Assume that the med techs take a 30 minute lunch. Please enter your response using this format: ## minutesWhat is OEE and also calculate the OEE from the given data in below table Items Data Shift Length 8 Hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsA company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute the multifactor productivity under each system. Use units per peso cost (labor plus equipment) as the measure.
- A company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute labor productivity under each system. Use units per worker per hour as the measure of labor productivity.C&A Candy produces two kinds of gumdrops: regular and sugar-free. The data on these gumdrops are given below: Regular Sugar-Free 30 10 60 30 80 80 Demand (lbs per hour) Changeover time (min) Production rate (lbs per hour) C&A first makes 60 pounds of regular gumdrops, then 20 pounds of sugar-free gumdrops, and then repeats this sequence. What is the utilization of the production process? Multiple Choice O O O 25% 20% 50% 40%Doog's Donuts produces five varieties of pastries, which are sold to a national grocery chain: muffins, donuts, cookies, cream puffs, and fritters. Assuming that Doog's operates a single shift for 1,800 hours per year. The processing time per unit, setup time per lot, the annual demand, and lot size are given in the table. Assume that the times given are for a work cell of four workers each. a. Complete the table given below. Pastry Muffins Donuts Cookies Cream puffs Fritters Demand Forecast (units/year) Required capacity 440,000 600,000 1,000,000 240,000 180,000 Processing Time (minutos/unit) 0.10 0.10 0.05 0.20 0.20 colls Lot Size Setup Time (f of pastries) (minutos/setup) 400 300 1,000 200 300 20 5 10 20 15 Total Processing Time minutes/year 0 Number of Batches per Year 0 Total Setup Time minutes/year b. Calculate the required capacity. (The required capacity should be in terms of the number of work cells needed) (Do not round intermediate calculations. Round up your answer to the…
- When the units of demand are at its peak, the capacity will exceed the demand. O False O TrueQuick Stop Pharmacy is a small family-owned drug com-pounding business in Portland Oregon that is trying toperfect its customer service operations. John Suleiman, theowner wants to maximize the productivity of his staff as wellas serve customers well. One area of concern is the drive-thru operation during the 7:30–8:30 morning rush hour.The process of fulfilling an order is as follows: a. If all the steps are handled by one employee, how manypatients could be served per hour?b. If James wants to process 30 patients per hour, how manyemployees will he need?c. How many stations are required using the longest workelement decision rule?d. Using the solution developed in part c, which station isthe bottleneck and how large is its capacity cushion?Calculate the total number of machine-hours needed to produce enough units to meet the sales demand for the two products. Total number of machine hours Marwick Innovations, Inc. produces exercise and fitness gear. Two of its newer products require a finishing process that can only be completed on machines that were recently purchased for this purpose. The machines have a maximum capacity of 10,500 machine hours, and no other products that the company makes use these machines.Sarah Jacob, the company’s operations manager, is preparing the production schedule for the coming month and can’t seem to find enough machine time to produce enough units to meet the customer demand that the marketing department has included in the sales budget.Michael Stoner, the company’s controller, has gathered the following information about the two products: DumbbellRack WeightBench Selling price per unit $50 $60 Direct materials 20 12 Direct labor…