he following are some observations of worker timings for a number of elements that make up a task. The total allowance factor is 15% task OBSERV.1 OBS.2 OBS.3 OBS.4 OBS.5 OBS.6 PERF. RATING A 8 9 10 13 14 12 120% B 3 4 5 4 3 6 85% C 5 6 7 4 5 7 105% D 3 2 1 3 2 2 95% Calculate the average times for each element A, B, C etc. Calculate the normal (basic) time for each job element. Ie. Normal time = (Average observed time) x (Rating) Find the total normal time for the whole task (A+B+C +….) Compute the standard time for the Job. 2. Name 5 advantages of work sampling over time study. 3.What is the difference between design capacity and effective capacity in a production environment?
he following are some observations of worker timings for a number of elements that make up a task. The total allowance factor is 15% task OBSERV.1 OBS.2 OBS.3 OBS.4 OBS.5 OBS.6 PERF. RATING A 8 9 10 13 14 12 120% B 3 4 5 4 3 6 85% C 5 6 7 4 5 7 105% D 3 2 1 3 2 2 95% Calculate the average times for each element A, B, C etc. Calculate the normal (basic) time for each job element. Ie. Normal time = (Average observed time) x (Rating) Find the total normal time for the whole task (A+B+C +….) Compute the standard time for the Job. 2. Name 5 advantages of work sampling over time study. 3.What is the difference between design capacity and effective capacity in a production environment?
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
- The following are some observations of worker timings for a number of elements that make up a task. The total allowance factor is 15%
task |
OBSERV.1 |
OBS.2 |
OBS.3 |
OBS.4 |
OBS.5 |
OBS.6 |
PERF. RATING |
A |
8 |
9 |
10 |
13 |
14 |
12 |
120%
|
B |
3 |
4 |
5 |
4 |
3 |
6 |
85%
|
C |
5 |
6 |
7 |
4 |
5 |
7 |
105%
|
D |
3 |
2 |
1 |
3 |
2 |
2 |
95% |
- Calculate the average times for each element A, B, C etc.
- Calculate the normal (basic) time for each job element.
Ie. Normal time = (Average observed time) x (Rating)
- Find the total normal time for the whole task (A+B+C +….)
- Compute the standard time for the Job.
2. Name 5 advantages of work sampling over time study.
3.What is the difference between design capacity and effective capacity in a production environment?
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.