From the traffic counting in 2020, the average commercial vehicle per day is 500 (10% commercial vehicle) and the traffic growth rate is estimated at 5%. A pavement needs to be designed for 15 years and is expected to open for the public in 2022. Using ATJ 5/85 method, estimate the total number of vehicles per direction during the first year of service. * O 100740 O 213669 O 1108240 O 2173824
Q: Given the data below: Daily Traffic Count Axle Load (Kips) 1000 (single axle cars) 300 (single axle…
A: The ESAL is given by: Where, Assuming Seasonal correction factor Scf = 1 N = Number of axle FE =…
Q: Please solve this question in step by step in hand- It is transportation-2 Civil engineering…
A: Given:- Number of lanes of the divided highway to be constructed = 6 lane The average annual daily…
Q: Problem Calculate the pavement width? for two directions divided highway. The current daily traffic…
A:
Q: Q. 2 A vehicle moving at 18.06 m/sec speed was stopped by applying brake and the length of skid mark…
A:
Q: The traffic projection for a new pavement of a two-lane rural dual carriageway is as follows: Design…
A: Given Design period = 25 years AADT in current year = 5000 vehicles per day Direction factor = 0.5…
Q: A northbound direction on an interstate highway consists of three lanes of flexible pavement. The…
A: Given. CBR=4.5 Standard deviation =0.38 Reliability=95% Initial PSI =4.5 Final PSI =2.5
Q: Q2: Results from a traffic survey required for a planned new flexible pavement construction revealed…
A: The design traffic is given by: T=∑TC×Y×P TC=365×F×G×W×10-6 msa Where, TC = Weighted annual traffic…
Q: Superelevation is developed over a given length of roadway, beginning with a road to being fully…
A: This question is related to the Highway Engineering and Traffic Engineering.
Q: 4.7.4 Design a pavement for a two lañe rural road to carry 250 vehicles per direction per day with…
A: We have to determine the design a pavement for a two lane rural road to carry 250 vehicles per…
Q: 8 8 8 8* 10 15.00 m. FIGURE 1-6 CROSS SECTION OF THE ROAD
A: Concrete is the mixture of fine and coarse aggregate mixed together with fluid cement and it will…
Q: A six lane divided highway is to be designed to replace an existing highway. The present AADT (both…
A: ESAL is generally the for equivalent single axle load. ESAL is a concept developed to determine a…
Q: The predicted traffic mix of a proposed four lane urban non-interstate freeway: Passenger cars…
A:
Q: A grader will be used to maintain 4 miles of haul road, It is estimated the work will require…
A: The distance of the road is 4 miles. The number of passes to remove the nuts in the first gear is 3.…
Q: A proposed four-lane divided highway is to be constructed using asphalt concrete surface layer.…
A:
Q: I. Determine the thickness of Portland cement concrete pavement (PCCP) slab for the two-lane toll…
A:
Q: A six lane divided highway is to be designed to replace an existing highway. The present AADT (both…
A: AADT (both directions) of 6000 vehicles Growth rate = G = 5% per year SN = 4 pt = 2.5 Design life =…
Q: Please solve this question. Subject: Transportation engineering Fillet Radius Problem (Airport…
A: Given ?=50.4 ft, ?=40.5 ft, ?=25.5 ft design group III (110.3 ft wingspan) (Table 6-2) centerline…
Q: Consider the following data for designing a taxiway for operating Boeing 707-320 aeroplane: Wheel…
A: Given data: Wheel base, w = 17.70 m Tread of main landing gear = 6.62 m Turning speed, v = 40 km/h…
Q: The predicted traffic mix of a proposed 4-lane urban non-interstate freeway is: Passenger cars = 78%…
A:
Q: A bulldozer was used in pushing soil 8. with going speed 3 km/hr , and return empty on the same road…
A: Given, Going speed = 3 km/hr or 0.833 m/s Return speed = 6 km/hr or 1.667 m/s Total cycle time = 2…
Q: Daily Traffic Count Axle Load (Kips) (2-аxle) (3-аxle) 22 (4-axle) 40 (5-axle) 50 (6-аxle) 50 SN is…
A: The highway consists of many sections such as road, intersection, intersections and all these…
Q: Give at least 3 advantages of using concrete pavement and using asphalt pavement for our highway…
A:
Q: A pavement designer has arrived at a design traffic of 100 million standard axles for a newly…
A: Given data- 100 million standard axles,design life=15 years,4500 vehicles/day,traffic growth=8%, To…
Q: Determine the capitalized cost for an asphalt road that will require a construction cost of 10M, 50…
A: Given data, Initial cost = 10 M Maintenance cost = 50000 each year Expenditure every 4 year = 1 M…
Q: Q4/ An 6 lane divided highway is to be constructed on a new alignment. Traffic volume forecasts…
A: Given Design life = 20 yrs , traffic growth= 0.04 AADT= 8000 number of lanes= 6
Q: A civil engineer found that the durability dd of the road, she is laying depends on two functions y1…
A: Introduction- The durability of Concrete is defined as the capacity of concrete to endure weather,…
Q: The azimuth of the tangents of the simple curve is 514 degrees and 749 degrees respectively. The…
A: Since on a curve the road is constructed along the curve so Length of the road is equal to the…
Q: Determine the horsepower developed by a passenger car traveling at a speed of 50-mi/h on an upgrade…
A: (a) The weight of the truck is W=4500 lb. The cross-sectional area is A=50 ft2. The coefficient of…
Q: On a two-lane road, the lane width is 3.2 m, and the shoulder widths on both sides of the road are 1…
A: Given data with of the road with shoulder W=8.4 m; velocity v=90 kmph; radius R=500 m assume frog…
Q: Current truck traffic volumes (in AADTT) for a six-lane highway are shown in the table below. An…
A:
Q: What are the factors affecting the handling capacity of highways.
A: handling capacity is nothing but the ability of a road to accommodate traffic volume. It is the…
Q: Exercise 3: Calculate the design traffic in million standard axle (MSA) and commercial vehicles per…
A: Given:- The annual daily commercial vehicles at least count (May 2021) = 200 The rate of growth = 6%…
Q: A pavement designer has arrived at a design traffic of 100 million standard axles for a newly…
A:
Q: Daily Traffic Count Axle Load (Kips) 1000 (single axle cars) 300 (single axle buses) 120 (tandem…
A: The highway consists of many parts like traffic, crosswalk, crossroads and this all comes together…
Q: Daily Traffic Count Axle Load (Kips) (2-аxle) (3-аxle) 22 (4-axle) 40 (5-axle) 50 (6-axle) 50 SN is…
A: (Note: Equivalent single axle load (ESAL) in this question, not ESAT) Given Data : Average Annual…
Q: Pavement Management Systems is a tool for the pavement engineer to decide WHERE, WHEN, and HOW and…
A: Pavement management system provides data to the stakeholders which can be used in the following…
Q: Q 3/A/Determine the wire steel fabric required for a two lane (each lane 3.6 m) concrete pavement,…
A: Note:- Hi! Thank you for the question As per the honor code, We’ll answer the first question since…
Q: A highway is having a design speed of 65 km/h and its pavement is having a friction coefficient of…
A: Given: Highway design speed = 65 km/h Pavement friction coefficient = 0.4 Driver reaction time = 2.5…
Q: Briefly discuss the importance of the following parameters used in designing a highway to…
A: For pavement design, several aspects including the number of cars, speed, weather conditions, as…
Q: 1. a little covered opening in a floor, pavement, or other surface that allows a person to enter,…
A: The given questions pertain to Transportation Engineering. The same can be answered as follows:
Q: Q1) A highway has the following pavement design daily traffic: 300 single axles at 10,000 lb each,…
A: The flow of fluid includes movement of an unbalanced fluid. As long as unequalled forces are in…
Q: The driver of a vehicle saw a stray dog 40 meters away and decided to hit the brakes…
A:
Q: 3. Determine the horsepower developed by a passenger car traveling at a speed of 60 mph on an…
A: Given Grade = G = 0.04 Speed = u = 60mph Area = 45 ft2 Weight = W = 4500lb
Q: An asphalt road can be constructed for P 5M. It is estimated that resurfacing is needed very year…
A: Given data, Initial cost P = 5000000 Resurfacing cost A = 1000000 Interest rate i = 10% Years n = 5
Q: 3) A rural arterial is expected to carry an ESAL of 1.88x10" during the 1st year of operation with…
A:
Q: 1) A six-lane highway (3 lanes in each direction) is to be designed to replace an existing highway.…
A: Note:- Hi! Thank you for the question As per the honor code, We’ll answer the first question since…
Q: 1. A concrete road 15 meters wide, 5 kilometers long, is de- signed with a thickness as shown in the…
A: To Determine Quantity of 40 kg. cement bags, sand and gravel required. If there is no available 40…
Q: Q1: The predicted traffic mix of a proposed four-lane urban freeway: • Passenger cars = 69% •…
A: Given:- Number of lanes of a proposed freeway = 4 lanes The predicted traffic mix are:- Passenger…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Scheduled maintenance will close two of the four westbound lanes of a freeway during one weekday for the period from 9:00 AM to 4:00 PM. The demand on the two lanes are as follows: Time Demand, vph 9:00-10:00 AM 4000 10:00-11:00 AM 3500 11:00-12:00 NN 2500 12:00-1:00 PM 2000 1:00-2:00 PM 2000 2:00-3:00 PM 2000 3:00-4:00 PM 2000 If the estimated capacity of the 4 lanes with 2 lanes open is 2960 vph, a. compute the time when maximum queue occurs. 11:00 AM b. compute the maximum queue formed. 1580 vehicles c. compute the maximum length of queue if the average length of cars is equal to 5 meters. 1975 m Show all necessary diagrams and solutions.Compute the annual ESAL for the traffic summarized in the table below, using the fourth power formula and assuming 350 days per year to compensate for reduced traffic on weekends. Weekday Traffic Data Truck Gross Weight Average (lbs) 20,000-40,000 40,100-66,000 66,100-80,000 80,100-110,000 Load on Steering Axle Load Distribution (Front/Rear) Number of Trucks 32,000 58,000 76,000 108,000 Weight (lbs) 3-Axle, All Single equal load singles front, -S2 for one tandem for the rear, -2 for two equal load singles for the trailer) 200 0 0 Trailer 5-Axle, 3-S2 Semi 5-Axle, 3-S2-2 Semi + (3 for one steering (3 for one steering single single and two and two equal load for the 8,000 lbs. Equal for the front, -S2 for one tandem for the rear) 330 800 800 300 12,000 lbs. 60/40 380 320 350 360 14,000 lbs. 30/30/20/20(show your solutions) Given the figure above, compute for the Annual Average Daily Traffic of all vehicle types: * A.338 B.None of the above C.393 D.418 E.431
- 2) Given the following data for five traffic analysis zones (TAZ): Zone Production Attraction 1 1 2 4 The travel times are as follows: 5 13 min 20 min 15 min 450 600 270 325 0 9 min 7 min 5 min 3 400 750 120 0 350 Determine the trips on the following: T1-3 and T2-5.2. There are two routes in use between Zones 1 and 2. The volume-delay functions for the two routes are as follows: V1 V2 t1 = 22 + 250 t2 = 15 + 150 where t = travel time(minutes) V = traffic volume If the total traffic volume is 6,950 vehicles per hour between the two zones, what are the traffic volumes and travel times on each of the two routes at a user-equilibrium (UE) condition?Consider the freeway and traffic conditions described in Problem 6.3. If 180 of the 1800 vehicles observed in the peak hour were large trucks and buses, what would the level of service of this freeway be on a 5-mi, 6% downgrade?
- with central reserve the current traffic in 2019 expressed by AADT is 3000 vehicle in both direction. the improved road with design life traffic 20 years will be opened to traffic in 2024. The estimated annual growth rate of traffic is 5%. 1000pcu/hr 12% f ADT 60% of total volume 16% of hourly volume Lane capacity K D Th Q1-B:1-How are travel time and delay studies used?4. Three routes connect and origin and a destination with performance functions t₁ = 8 + x₁, t₂ = 1 + 2x₂, and t3 = 1 + 0.5x3 (with x's in thousands of vehicles per hour and t's in minutes). If the peak-hour traffic demand is 3400 vehicles, determine user- equilibrium traffic flows on each route. [Ans: x₂ = 0.68]5- Traffic volume study was conducted in a section of road in month of April the following information's was obtained ( HEF=18, POV =650 veh/h, total weekly volume =72450 veh/week, total yearly volume = 23770 veh lyear, MEF =1/2 DEF). So, the ADT of this month? (Assume total daily volume = average daily volume) * O 7923 veh 850 veh 660 veh O 1240 veh
- Question 2 Because the new travel time rate (TTR) from the additional traffic (e.g., 300vph) exceeds the minimum acceptable local standard of 2.0 min/mile, it is proposed to increase the road capacity by 900vph/lane by adding one lane in each direction. Calculate the new travel time rate and traffic volume using: a. The traditional method of traffic impact analysis, and b. The above-mentioned pivot point analysis method. c. Compare the results of the two methods and comment on their significance.It is estimated that after 25 years in a section of highway, the average daily traffic will be 15000 vehicles. It is found that ratio of design hourly volume to the average daily traffic was 15%. The one way traffic volume in the predominant direction is 60% of the two way design hourly volume. Determine the directional ?design hourly volume after 25 years **The daily counts of the current traffic volume for a rural highway for one week of May 2000 are as shown in the following table: Sat. Sun. Mon. Tues. Wed. Thur. Fri. Day Daily volume 12000 12500 10500 11500 9500 9000 8500 The traffic is composed of 70% passenger car, 20% bus, 10% truck. The percent of future traffic to current traffic is predicted to be 180% up to May 2020. Determine the required number of lanes for this highway if the lane capacity is 1300 pc/hr.