For the sequence using Johnson’s Rule, the Make span =
Q: Q: What is the mean assembly time per product unit for size C in terms of hour?
A: Answer is as below:
Q: Raquel is concerned with effi ciency. She believes it isprobably more effi cient to use SPT…
A: SPT based processing time can be depicted as follows:
Q: . Assume the jobs displayed in Table 18.22 need to be processed on a single resource andare…
A: Formula:
Q: A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling…
A: A production process at Kenneth Day Manufacturing is shown in the figure above. Effective capacity…
Q: What single activity is the bottleneck for the entire process? B what?
A: A bottleneck is an activity which reduce the entire capacity of a system. It reduce the utilisation…
Q: Consider a process consisting of five resources that are operated 8 hours per day. Theprocess works…
A: Given data is Product A = 40 units per day Product B = 50 units per day Product C = 60 units per day…
Q: 18Every company has a Bottleneck True False 19Capacity of each sequence in a process is independent…
A: The detailed solution is given in Step ahead.
Q: The standard time to perform the regular work cycle for a certain manual operation is 4 mins. In…
A: Standard time = 4 mins Irregular work element's normal time = 2.25 mins PFD allowance = 15% Normal…
Q: Use Johnson's Rule to sequence the following set of five jobs that require first a shearing…
A: Given data
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using:Cycle time = Available time / Desired output
Q: Technology has had a great effect on our ability
A: At the point when a huge number of individuals in the United States and all throughout the planet…
Q: Cycle time is the longest cycle time allowed for each workstation in a line balancing to produce one…
A: The concept used here is understanding manufacturing times such cycle time, lead time, takt time…
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: Lead time is the lenght of time required from the start of process till its completion. Bottleneck…
Q: A producer of inkjet printers is planning to add a new line of printers, and you have been asked to…
A: Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: An independent accountant is planning to prepare tax returns for six of her clients.Prior to her…
A: Step 1: Initially, the minimum number should be selected by considering both the columns. Here, 0.5…
Q: Natura has to fill 7 orders for its clients. He requires placing the required product in work boxes…
A: Workcenter 1 Workcenter 2 Orders Place in box (minutes) Closing Box (minutes) 1 9 6 2 8 5…
Q: a) The Operations Manager at Metal Fabricators must decide the sequence in which the four Block…
A: Given, Machine Number EstimatedMaintenance days Time to promised delivered FCFS Order…
Q: . Consider a four-step serial process with the number of workers at each step and processing times…
A: Bottleneck is defined as the point of congestion in the system of production which occurs when the…
Q: Currently a company that designs Web sites has six customers in its backlog. The time since the…
A: Job sequencing is a process which helps to schedule the job based on different heuristics. Based on…
Q: Operator Loading Chart 60 57 50 42 40 35 32 29 30 10 Worker A Worker B Worker C Worker D Worker E…
A: In the given question there are 5 worker A ,B, C, D and E and the cycle time of each worker is given…
Q: A company assembles a product that consists of three pieces called AA, BB, and CC. The AA and BB…
A: The total hours which the machine can work in an year: 50 weeks * 5 days * 8 hours = 2000 hours…
Q: WorkPro is a small manufacturer. It uses a job process for production. The following sample of jobs…
A: "Since you have asked multiple questions, we will solve the first one for you. To get remaining…
Q: DreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven work…
A: As per your request, I have solved the last question from the given set of questions. Kindly find…
Q: Cycle time should always be between the shortest and the longest task times in a production cycle…
A: What is task time? Task time in any production is equal to the time taken from eth beginning of work…
Q: Nhen HR Manager increase the scope of a job by expanding the number of different tasks to be…
A: Answer- a. Job enlargement
Q: Assume the jobs displayed in Table 18.22 need to be processed on a single resource andare sequenced…
A: SPT, also known as Shortest Processing Time is the shortest time taken by a job or a process to get…
Q: a process consisting of three resources. Assume there exists unlimited demand for the product, and…
A: since we only answer up to 3 subparts, we'll answer the first 3. please resubmit the question and…
Q: Sequencing jobs through two work centers. Use Johnson’s rule to obtain the optimum sequence for…
A: The lowest time is 1.50 hours in work center B and so it is placed in the first position in the…
Q: What is the mean assembly time per product unit for size C in terms of hour? a) 0,1136 b) 0,0251 c)…
A: The answer is as follows:
Q: The constraints governing the jobs are as fo1lows: A and B are start jobs; A controls C, D and E; B…
A: Given data is
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Cycle time is the total actual time spend to produce an item in the production process.
Q: Given the following information on job times and due dates. Job Job Time (Hours) Due Date (Hours)…
A: we'll answer the first question since the exact one wasn't specified. please submit a new question…
Q: An architect has five projects to complete. She estimates that three of the projects willrequire one…
A: Compute the time required to complete the project: Time required to complete=1+1+1+3+4=10
Q: What is flow processing, and what are its advantages and disadvantages?
A: The flow of work commonly from one workstation to another without causing any delay at the constant…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: A process includes 9 tasks and there are 3 workers. Each task can be assigned to only one worker and…
A: Since there are three workers, therefore they must be working at three workstations, and consecutive…
Q: Rocky’s Pre-Cast Shop is considering two different processes for completing Pre-Cast jobs. Process A…
A: 3. Total time = 8 hours×60 minutes=480 minutes Maximum capacity of Process B = 48015=32 jobs per day
Q: A manufacturing system is used to produce a product. Each unit of product must be processed…
A: Cycle time = Bottleneck time Bottleneck station = Workstation V [ because it has lowest Capacity ]
Q: As the Cottrell Bicycle Co. of St. Louis completes plans for its new assembly line, it identifies 25…
A: Find the Given details below: Given details: Task Time(Sec) Immediate Predecessors K3 60 -…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: Jobs A, B, C, D, and E must go through Processes I and II in that sequence (Process Ii rst, then…
A:
Q: A shoe repair operation uses a two-step sequence that all jobs in a certain category follow. Alljobs…
A: Given Data Job Station A Station B A 27 45 B 18 33 C 70 30 D 26 24 E 15 10 a)…
Q: (CLO-4] The standard time to perform the regular work cycle for a certain manual operation is 4…
A: Standard time = 4 mins Irregular work element's normal time = 2.25 mins PFD allowance = 15% Normal…
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: We have joined after 4 customers, hence there are a total of 5 customers in the system now
Q: There are five jobs (namely 1,2,3,4 and 5), each of which must go through machines A, B nd C in the…
A: The term "sequencing problem" refers to the choice of a suitable sequence for a finite number of…
Q: DreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven work…
A: Given: No. of workers = 5Labor charge = $ 15/ hourSelling cost = $ 6Variable cost = $…
Q: Karina Nieto works for New Products Inc., and one of hermany tasks is assigning new workers to…
A:
Q: Using Table 1 found on the next page, develop a process map that captures the current process being…
A: A Process map shows how the work is being done step by step. Since it shows the flow of work, it is…
Find the value of X in the following Flow Shop data consisting of 5 jobs which are to be processed on two machines M1 & M2 in that order.
Jobs |
|
M1 |
M2 |
A |
|
13 |
21 |
B |
|
8 |
16 |
C |
|
30 |
25 |
D |
|
11 |
27 |
E |
|
15 |
25 |
For the sequence using Johnson’s Rule, the Make span = X
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 8 images
- A manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the i nished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?A manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the finished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?Consider the following batch-flow process consisting of three process stepsperformed by three machines. Process steps step 1 step 2 step 3 processing time 0.25min./unit 0.20 min./unit 0.15 min./unit setup time 30 min 20 min 45 min Work is processed in batches at each step. Before a batch is processed at a step, the machine atthat step must be set up. (During a setup, the machine is unable to process any product.) Assumethat there is a dedicated setup operator for each machine (i.e., there is always someone availableto perform a setup at each machine.)a. What is the capacity of step 1 if the batch size is 35 parts?b. For what batch sizes is step 1 (2, 3) the bottleneck?
- n a manufacturing process, a molded part spends 7 hours in inventory before being placed in a deburring machine, where the part is processed for 2 minutes. After deburring, the part spends 4 hours in inventory waiting for its turn on the polishing machine. The part then spends 7 minutes in polishing before waiting 6 hours in line to be painted. The part goes through a painting process that takes 7 minutes, then spends 11 hours in inventory before being shipped to the customer. What is the percentage of value-added time for the part?20 ______ are high-volume product processes that typically produce standardized products and require identical or similar operations. a Line processes b Intermittent processes c Machine processes d Outlier processes 21 ______ is concerned with regulating inputs to a work center in relation to output and available capacity so that the queues and waiting times of jobs can be managed and kept under control. a Input control b Input-output control c Process control d Capacity control 22 ______ is a method applied to situations in which various resources must be allocated to activities on a one-to-one basis. a Time-series method b Assignment method c Integer programming d Linear analysisA Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 6 workers, who produced an average of 78 carts per hour. Workers receive $10 per hour, and machine coast was $36 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $13 per hour while output increased by four carts per hour.a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/$) = (round to 4 decimal places).b) Compute the % growth in productivity between the Prior to and after buying the new equipment. The growth in productivity = % (round to 2 decimal places)
- A company that operated 10 hours a day manufactures two products on three sequential processes. The following table summarizes the data for the problem: Which of the following is the most appropriate representation for variables x and y for the given situation? a.) x is the # of units of Product 1 to be procured; y is the # of units of Product 2 to be procured. b.) x is the # of units of Product 1 to be produced; y is the # of units of Product 2 to be produced. c.) x is the # of units of Product 1 to be stored; y is the # of units of Product 2 to be stored d.) x is the # of units of Product 1 to be delivered; y is the # of units of Product 2 to be delivered.A Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 7 workers, who produced an average of 87 carts per hour. Workers receive $15 per hour, and machine coast was $43 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $14 per hour while output increased by four carts per hour. a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/S) = Blank 1 (round to 4 decimal places). b) Compute the productivity changes between the Prior to and after buying the new equipment. The productivity growth = Blank 2% (round to 2 decimal places) Blank 1 Add your answer Blank 2 Add your answerThe ClickClock corporation produces clocks with six stations. Each station is manned by a human worker, who do the following tasks: These workers get paid $ 10 an hour. Ignore any Station Task Sequence Processing Time (secs) Task Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A Check switch travel Clean inside bezel Install module in bezel Total time for B Install battery clip in module Heat-stake battery clip in module Install two batteries in module Check switch 14 2 26 A 3 10 Preparation 1 4 18 68 23 B 6 12 Preparation 2 7 25 60 8 20 9 20 Battery 10 22 Installation 11 8. Total time for C 70 Install band Inspect band Total time for D Cosmetic inspection Final test D 12 45 Band 13 13 Installation 58 E 14 4 Packaging 15 71 Preparation Total time for E 75 Place watch and cuff in display box Place cover in display box base 16 20 17 14 Watch 18 Place owner's manual and box into tub 30 packaging Total time for F 64
- A lab provides ultrasound service to patients. The service process consists of two steps: 1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time = 6 minutes/patient) 2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process time = 20 minutes/patient) Note that the ultrasound images need to be read by radiologists, but we assume that they have an ample capacity and thus will not model the role in the service process. Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more receptionists and/or technicians to increase the service capacity to at least 14 patients/hr. What would be the extra payroll cost (in dollars per hr)?There is a manufacturing company that has a dedicated production line to make one specific product. The line has three stations working in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3. The output from station 3 is the finished product. Station 1 can process 500 units per week, station 2 can process 300 units per week, and station 3 can process 400 units per week. illustrates this problem. Question Answer ↓ What is the maximum output number per week?The OR is available for 12 hours a day; the hospital has decided to not perform any procedures between 7pm and 7am. This time is equally divided across three surgeons. The standard procedure time for the knee surgery done at the clinic is 1h. The cleaning and housekeeping that needs to happen after each procedure takes 20 minutes. Almost all of this time could be saved if the cleaning crew were notified earlier on. 10 minutes are spent on patient preparation / anesthesia work before each procedure. (Note: this is not part of the 60-minute procedure time). Proposals have been evaluated to move these 10 minutes to outside the OR, and there exists no medical reason that would prohibit doing this.) A surgeon only starts a case if all of the work associated with the case (preparation, procedure, and cleaning) can be completed in the 4h allotted to each surgeon. Surgeons never start BEFORE their allotted time. Though the clinic aims to operate 7 days a week, holidays, vacation, and…