An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 17% and its void ratio, e, is 0.75. The specification requires the embankment be compacted to a dry unit weight of 19 kN/m^3. Determine, for 3 km length of embankment. Assume Gs = 2.7 a) Compute the volume (m³) of borrow material required b) solve the cost of fill if the earth fill from borrow site costs Pho 150/m³ c) calculate the volume (m³) of borrow material required is the specification required a void ratio of 0.20
An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 17% and its void ratio, e, is 0.75. The specification requires the embankment be compacted to a dry unit weight of 19 kN/m^3. Determine, for 3 km length of embankment. Assume Gs = 2.7 a) Compute the volume (m³) of borrow material required b) solve the cost of fill if the earth fill from borrow site costs Pho 150/m³ c) calculate the volume (m³) of borrow material required is the specification required a void ratio of 0.20
Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter3: Weight–volume Relationships
Section: Chapter Questions
Problem 3.24P
Related questions
Question
An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 17% and its void ratio, e, is 0.75. The specification requires the embankment be compacted to a dry unit weight of 19 kN/m^3. Determine, for 3 km length of embankment. Assume Gs = 2.7
a) Compute the volume (m³) of borrow material required
b) solve the cost of fill if the earth fill from borrow site costs Pho 150/m³
c) calculate the volume (m³) of borrow material required is the specification required a void ratio of 0.20
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning