ABS engineering decided to build and new factory to produce electrical parts for computer manufacturers. They wll rent a small factory for 2,000dhs per month while utilites will cost 500dhs per month, they had to pay 800Dhs for municipality for water and electricity connection fees. On the other hand they will rent production egipment at a monthly cost of 4,000dhs. they estirmated the material cost per unit will be 20dhs, and the labor cost will be 15dhs per unit. They need to hire a manager and security for with a salary of 30,000 and 500odhs per month each. Advertising and promotion will cost cost them 15oodhs per month. Required Calculate the total Fed cost Cakte the total variable cost per unit- the machine mar production capacity is 10000 units per month, what the selng prce they should set to break even monthly- t they to earn a profit equel to 10.000 per month for how much he should sel the unit What is the ftred cost per unit at maximum production- What is the total vanable cost at maximum production

Survey Of Economics
10th Edition
ISBN:9781337111522
Author:Tucker, Irvin B.
Publisher:Tucker, Irvin B.
Chapter6: Proudction Costs
Section: Chapter Questions
Problem 8SQP
icon
Related questions
Question

please answer first four subparts

ABS engineering decided to build and new factory to produce electrical parts for computer manufacturers. They will rent a small factory for 2,000d
per month while utilities will cost 500dhs per month, they had to pay 800Dhs for municipality for water and electricity connection fees. On the other
hand they will rent production equipment at a monthly cost of 4,000dhs. they estimated the material cost per unit will be 20dhs, and the labor cost will
be 15dhs per unit. They need to hire a manager and security for with a salary of 10,000 and 5.000dhs per month each. Advertising and promotion will
cost cost them 1500dhs per month.
Required
2 Calculate the total Fiked cost-
Calate the total variable cost per unit-
the machine mar production capacity is 10000 units per month, what the seling pice they should set to break even monthly-
4-
St they to earna profit equal to 10,000 per month, for how much he should sel the unit
5 What is the fred cost per unit at maximum production
7What is the total variabie cost at maximum production
if they set the selling price for 8ODHS on max production and managed to reduce the total fixed cost by 3 what is the profit increase percentage
2they set Die selling price for SODHS on max production and managed to reduce the total variable cost by 3 wnats the profit increase percentage
Transcribed Image Text:ABS engineering decided to build and new factory to produce electrical parts for computer manufacturers. They will rent a small factory for 2,000d per month while utilities will cost 500dhs per month, they had to pay 800Dhs for municipality for water and electricity connection fees. On the other hand they will rent production equipment at a monthly cost of 4,000dhs. they estimated the material cost per unit will be 20dhs, and the labor cost will be 15dhs per unit. They need to hire a manager and security for with a salary of 10,000 and 5.000dhs per month each. Advertising and promotion will cost cost them 1500dhs per month. Required 2 Calculate the total Fiked cost- Calate the total variable cost per unit- the machine mar production capacity is 10000 units per month, what the seling pice they should set to break even monthly- 4- St they to earna profit equal to 10,000 per month, for how much he should sel the unit 5 What is the fred cost per unit at maximum production 7What is the total variabie cost at maximum production if they set the selling price for 8ODHS on max production and managed to reduce the total fixed cost by 3 what is the profit increase percentage 2they set Die selling price for SODHS on max production and managed to reduce the total variable cost by 3 wnats the profit increase percentage
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Survey Of Economics
Survey Of Economics
Economics
ISBN:
9781337111522
Author:
Tucker, Irvin B.
Publisher:
Cengage,
Micro Economics For Today
Micro Economics For Today
Economics
ISBN:
9781337613064
Author:
Tucker, Irvin B.
Publisher:
Cengage,
EBK HEALTH ECONOMICS AND POLICY
EBK HEALTH ECONOMICS AND POLICY
Economics
ISBN:
9781337668279
Author:
Henderson
Publisher:
YUZU
Managerial Economics: Applications, Strategies an…
Managerial Economics: Applications, Strategies an…
Economics
ISBN:
9781305506381
Author:
James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:
Cengage Learning