a. Formulate a linear programming model for this problem. b. Draw a neat sketch of the feasible region. c. Use your sketch to determine how many of each product should be produced to maximise profit and include a brief concluding sentence summarising your findings. The numbers of units are not required to be integers.
Q: (a) Develop a sequence using SPT based on processing time for preparing the area.
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: 27. Six Sigma is a well-recognized quality management system that employs improvement projects to…
A: P1 = Decision related to the selection of project 1. If the value of P1 = 1, select project 1. If…
Q: inda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to…
A: Mean (X) = 8.00 Standard Deviation () = 0.04 Lower Specification Limit (LSL) = 8 - (3 * 0.047) =…
Q: 25. Used for computing production capacity, production quotas, wage incentives, costing, etc.. O…
A: Companies need to determine a standard based on which they can set benchmark time, wages for their…
Q: According to the Job Characteristics Approach' of Job Design, a technician who has full authority to…
A: Job Design is a psychological philosophy of inspiration that is definite as the systematic and…
Q: Q2. For the following predecessor table (where duration is in weeks) Draw a corresponding AON…
A: A network diagram is a visual representation of a project which helps to identify the activity…
Q: How does the lean manufacturing works in improving the performance of organization?
A: Lean manufacturing s the concept that mainly focus on minimizing waste during the manufacturing…
Q: Both alpha and beta are measures of reliability. Both alpha and beta are measures of reliability.…
A: Cronbach's alpha is indeed a metric for consistency reliability, or even how tightly a group of…
Q: You are in the role of a project leader. Your project is to renovate a house that a house flipper…
A: Project Plan: This project plan shall come first, followed by the creation of a "New Roof."…
Q: Florida Southwestern State College has decided to implement a new registration system that will…
A: Users may be turned into active collaborators in the development process with the aid of JAD. As a…
Q: Monthly Demand 50 abi 120 280 guarantee supplies from de to sign a contract wit rom the roaster to…
A: Based on the given information we have to minimize the total monthly cost of coffee supply from the…
Q: following ways: Analyses include individuals, while designs are only concerned with the final…
A: Analyses and designs
Q: Set up the ANOVA table for these data. (Round your values for MSE and F to two decimal places, and…
A: Here, we have three groups of data, these groups are "plant 1 atlanta", "plant 2 dallas" and "plant…
Q: Identify and briefly describe six system approach factors.
A: Systems approach factors are the things you do in your business that make you more efficient,…
Q: or the project consisting of activities shown in the able, the time of the completion of the project…
A: A project schedule network diagram shows the sequence of the task that is performed to complete a…
Q: You are an HR Manager; you will have to most likely interview job candidates. What actions can you…
A: HR Manager: He is the person who is responsible coordinating for all the administrative related to…
Q: definition of entrepreneurship
A: The entrepreneur is defined as a person who has the desire to establish new business, ability to…
Q: firm produces three products , A , B and C , for sale both in the domestic market and in the export…
A: The question is related to Profitability of each product. Proft is the excess of Sales Revenue over…
Q: Why have ERP systems evolved as the central component of the information technology infrastructure…
A: ERP stands for Enterprise Resource Planning. It is a multi-functional software which supports all…
Q: Use the schedule below to answer these questions. (Assume a 5-day work week, weekends are shown as…
A: Find the Given details below: ID Task name Duration(Days) Included Weekends(Days) Predecessors…
Q: The following is the actual sales for Manama Company for a particular good: t Sales 17 5 31 The…
A: Given data is
Q: What are the importance of thorough guests screening in the reservation procedures prior to final…
A: Guest screening is the process of evaluating a reservation's risk level by investigating the guest’s…
Q: anual demand= 4000 units, order cost S=$30/time, h=40%C, determine the EOQ and the annual total…
A:
Q: ..Takes resources from the environment and processes them to produce outputs O Organizations…
A: Any resources utilized to manufacture goods and services are referred to as inputs. Labor (workers'…
Q: Q2) Choose the correct answer 1) The PERT method to solve? a) Game theory b) transportation model 2)…
A: PERT is method associated with project management for solving network diagram model. Saddle point is…
Q: Hennes & Mauritz AB (H&M) is a Swedish multinational clothing-retail company known for its…
A: Economic benefit Those benefits which are gained by organizations in terms of increased income or…
Q: Which of the following would be considered a raw material? a. Animal fur b. Gold coin c. A table…
A: Raw Material: Raw Materials are those substances or materials which are used in the primary stage of…
Q: a) Determine the seasonal variation each of the b) Hence calculate the average seasonal variation…
A: Time series is a technique used to predict future outcomes on the basis of past data. This technique…
Q: Can you give me a clear answer to this question: Decision Variables: Objective Function:…
A: Decision Variable: Suppose- x be the no. of working hours of machine A y be the no. of working…
Q: The common measures of a queuing system's performance include: O probability that the service…
A: Concept of waiting lines in a system give rise to the need of studying queue system. Waiting line is…
Q: Why is there a need to balance the inventory needs with customer’s needs?
A: Most businesses work with tangible goods. The goods can be for use or for the sale. Inventory is the…
Q: rom the perspective of customer service. Which do you believe will provide the best level of…
A: The practice of assisting and advocating for consumers as they get familiar with, use, optimize, and…
Q: REQUIRED: Perform analysis for the Ocobee River Rafting Company to determine which alternative would…
A: Break-even analysis is one of the methods that are commonly and widely used in manufacturing…
Q: Q5 d) Briefly state what you understand by: i) The articles of association ii) Memorandum of…
A: Agreement is an arrangement between parties of coming into a mutual decision. In an agreement one…
Q: sions that were most important.
A: Game hypothesis, the investigation of decision making, unites different teaches like science,…
Q: Please describe experimental design, and how it would benefit the organization in terms of improving…
A: Experimental design is a tool used to evaluate the effect of a single or multiple changes to any…
Q: Some project management applications can be quite expensive. As a manager, how would you justify the…
A: Project Management software is indeed a long-term investment for the firm since it provides…
Q: The first step of Branch and Bound algorithm drops the integrality restrictions and solves the…
A: Branch and bound is a method of designing algorithms that are commonly used to solve combinatorial…
Q: Steps to reduce the temptations and distractions that impede the growth of the workforce.
A: Temptations and distractions at the workplace refer to those important activities that are very…
Q: Discuss FMEA in detail with examples & how calculate the RPN ?
A: FMEA stands for the Failure Modes and Effects Analysis. RPN stands for the risk priority number.
Q: importance of strategic location
A: To be considered for in a business site decision, places must firstly fulfill particular…
Q: OI 4. purcha a componer used in the manu be generator directly from the supplier. Westside's…
A: Given data: Annual Demand (D)= 12,000 unitsOrdering cost per order (O) = $25Carrying cost per unit…
Q: Problem 6-16 (Algo) The desired daily output for an assembly line is 540 units. This assembly line…
A: Given data is Desired output = 540 units Operating time = 630 minutes
Q: Explain in detail four Types of Scales of Measurement with Examples.
A: We need to define the data variables and categorize them properly, there are four scales of…
Q: What is the definition of process standardization? What are the components of it?
A: Process Standardization The construction of a set procedure for attending to tasks and activities…
Q: hich statement below is True, and which one is False? For the False ones explain why they are…
A: 3-1) The process imperfections or the imperfect process are the outcome of the waste in the process.…
Q: Which of the following statements is/are true regarding EOQ? a. At EOQ, total inventory cost is…
A: EOQ = ((2DS)/H)1/2 where: D= annual demand S = ordering cost per order H= holding cost per unit
Q: a. Create a set of linear equations to describe the objective function and the constraints. b. Use…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: 1)..An electrical parts manufacturer purchases circuit board for manufacturing electrical board at…
A: Given, Demand, d= 1000 per quarter =1000×4=4000 Unit cost, u=OMR 20 Ordering cost,o =OMR 10 Carrying…
Q: 3. The manager for a manufacturing company must recommend whether to construct a large plant,…
A: Find the Given details below: Given details: Alternative State of Nature Good Market ($)…
Step by step
Solved in 8 steps with 3 images
- d) A company can produce three products A, B and C. the products yield a contribution of Kshs.8, 5 and 10 respectively. The products use a machine which has 400 hours capacity. Each unit of the product uses 2, 3 and 1 hour respectively of the machines capacity. There are only 150 units available in the period of a special component which is used singly in product A and C. Only 200kgs of a special alloy is available in the period. The usage of special alloy is 2kgs per unit and 4kgs per unit respectively. There is an agreement with a trade association to produce no more than 50 units of product B in the period. Advise the company on the production plan that will maximize contribution.An assembly line requires two components: gadjits and widjits. Gadjits are produced by center 1 and widjits are produced by center 2. Each unit of the end item, called a jit-together, requires 3 gadjits and 2 widjits. The daily production quota on the assembly line is 750 jit-togethers. The container for gadjits holds 70 units. The policy variable for center 1 is set at 0.03. The average waiting time for a container of gadjits is 0.08 day, and 0.05 day is needed to produce a container. The container for widjits holds 60 units, and the policy variable for center 2 is 0.09. The average waiting time per container of widjits is 0.16 day, and the time required to process a container is 0.26 day. a. How many containers are needed for gadjits? 5 containers. (Enter your response rounded up to the next whole number.) b. How many containers are needed for widjits? containers. (Enter your response rounded up to the next whole number.)An assembly line requires two components: gadjits and widjits. Gadjits are produced by center 1 and widjits are produced by center 2. Each unit of the end item, called a jit-together, requires 3 gadjits and 2 widjits. The daily production quota on the assembly line is 750 jit-togethers. The container for gadjits holds 70 units. The policy variable for center 1 is set at 0.03. The average waiting time for container of gadjits is 0.08 day, and 0.05 day is needed to produce a container. The container for widjits holds 60 units, and the policy variable for center 2 is 0.09. The average waiting time per container of widjits is 0.16 day, and the time required to process a container is 0.26 day. a. How many containers are needed for gadjits? containers. (Enter your response rounded up to the next whole number.)
- LENILOVESBATO Co. produces various types of floor rugs with many different designs. They typically produce at least 200 rugs with a single machine setup. A cost incurred each time a new rug design is developed is called a(n) a. Unit-level cost b. Batch-level cost c. Product-level cost d. Facility-level costAverage Cost Company A has 50% of its total variable manufacturing cost in labor and the other50% in fuel. Company B has 80% of its total variable manufacturing cost in labor and the remainderin fuel. Suppose in a given year labor costs rise 5% and fuel costs rise 10%.Required Which company has the higher percentage increase in total variable cost?List the system of inequalities which describe B in the graph below.ECON1003 Mathematics for Social Sciences Unit 3_Version 1 Page 33 6. Anya’s Jeans has production process organized in threedistinct stages: cutting; sewing and finishing. She produces threetypes of jeans, namely peddle-pushers, hipsters and low cuts. Thenumber of minutes each type requires in each production processin shown below.Type Cutting Sewing FinishingPeddle-Pusher 4 6 2Hipster 6 7 4Low Rider 9 3 6On average, there are 6400 minutes of cutting time, 3500 minutes ofsewing time and 2400 minutes of finishing time each day. Given thatthe company makes $10 profit on each peddle-pusher $ 50 on eachhipster and $60 on each low cut and that the company sells all thejeans made. List the system of inequalities for the cutting, sewingand finishing constraints.
- 30) XYZ Company The XYZ Company uses 175 handles per day. The company operates 300 days per year. It costs $2.00 to carry one handle in inventory for one year. When handle inventory is low, an order is sent to the fabrication department to manufacture more handles. Fabrication can produce handles at a rate of 1500 per day and send the handles over to assembly while production is in progress. The setup for each production run costs $500. Assume the XYZ company orders 9,000 handles at a time (not necessarily the economic order quantity). The order receipt period = _____ days. Group of answer choices a) 6.0 b) 5.8 c) 30.0 d) 51.4 e) 50.0P1 P4 P2 P3 P5 P5 P5 P6 ... P1 has a production rate of 15 units/hour, P2 = 30 units/hour, P3 = 10 units per hour, P4 = 4 units/hour, P5 = 1 unit(s) per hour for each P5 and P6 = 6 units per hour. Operation P4 occurs seperately from and simultaneously with operations P1-P3. Operation P5 has three parallel and identical lines; therefore, each part only needs to go through one of the three lines. Consider the following two independent improvements: Improvement 1: Change station P4 into two connected stations (P4-1 and P4-2, connected in series) that have process times of 4 min/unit and 6 min/unit respectively. Improvement 2: Add two additional P5 stations to give you 5 parallel and identical lines. Improvement 2 increases capacity because it improves the bottleneck. The new bottleneck is station P4 since the original bottleneck has a process time of The new yearly capacity would be units per year. a) Which of the two improvements will provide the largest increase in capacity? What is the…A company manufactures hair dryers. It buys some of the components, but it makes the heatingelement, which it can produce at the rate of 800 per day. Hair dryers are assembled daily, 250 daysa year, at a rate of 300 per day. Because of the disparity between the production and usage rates,the heating elements are periodically produced in batches of 2,000 units.a. Approximately how many batches of heating elements are produced annually?b. If production on a batch begins when there is no inventory of heating elements on hand, howmuch inventory will be on hand two days later?c. What is the average inventory of elements, assuming each production cycle begins when thereare none on hand?d. The same equipment that is used to make the heating elements could also be used to makea component for another of the firm’s products. That job would require four days, includingsetup. Setup time for making a batch of the heating elements is a half day. Is there enough timeto do this job between production…
- Suppose that low-skilled workers employed in clearing woodland can each clear one acre per month if each is equipped with a shovel, a machete, and a chainsaw. Clearing one acre brings in $1,400 in revenue. Each worker's equipment costs the worker's employer $255 per month to rent and each worker toils 40 hours per week for 4 weeks each month. Instructions: In part a, enter your answer as a whole number. In parts b-e, round your answers to 2 decimal places. If you are entering any negative numbers be sure to include a negative sign (-) in front of those numbers. a. What is the marginal revenue product of hiring one low-skilled worker to clear woodland for one month? $ b. How much revenue per hour does each worker bring in? c. If the minimum wage is $13.65, by how much will the revenue per hour in part b differ from the minimum wage? 2$ d. Consider the employer's total costs, which include the equipment costs as well as a normal profit of $50 per acre. If the firm pays workers the…In order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredA company manufactures hair dryers. It buys some of the components, but it makes the heatingelement, which it can produce at the rate of 800 per day. Hair dryers are assembled daily, 250 daysa year, at a rate of 300 per day. Because of the disparity between the production and usage rates,the heating elements are periodically produced in batches of 2,000 units.a. Approximately how many batches of heating elements are produced annually?