2/14/24, 11:28 AM
Quiz: Chapter 10 Lecture Quiz
https://canvas.chaffey.edu/courses/38348/quizzes/302550/take
1/2
Chapter 10 Lecture Quiz
Started: Feb 14 at 11:14am
Quiz Instructions
Please complete the quiz using your notes and lecture information. Do not Google you answers. You will have 2
attempts.
1 pts
Question 1
Which of the following lists the primary purposes of the design development phase?
Work through the details of the drawing documents for submittal to the City for permits.
Work through the details of the conceptual lighting design and produce presentation mediums and
specifications to present to the client for approval.
Verbalize visual lighting ideas for the spaces.
List preliminary concepts for the lighting design.
1 pts
Question 2
Which is the most accurate list of information that should be included on an electrical plan? Luminaires, switches, HVAC units, junction boxes, auxiliary units, and wiring for controls.
Luminaires, voltage units, junction boxes, auxiliary units, and wiring for controls.
Luminaires, switches, outlets, and wiring for controls.
Luminaires, switches, outlets, junction boxes, auxiliary units, and wiring for controls.
1 pts
Question 3
Which is the most accurate list of information that should be included on a reflected ceiling plan?
Location of luminaires, voltage units, and any HVAC equipment.
2/14/24, 11:28 AM
Quiz: Chapter 10 Lecture Quiz
https://canvas.chaffey.edu/courses/38348/quizzes/302550/take
2/2
No new data to save. Last checked at 11:28am
Location of luminaires, switches, control loops, architectural elements, and any HVAC equipment.
Location of luminaires, voltage units, architectural elements, and any HVAC
Location of luminaires, electrical panels, architectural elements, and any HVAC equipment.
1 pts
Question 4
An RCP illustrates the location of lighting and what other elements?
other elements on a ceiling
electrical outlets
furniture
RCP ratio
Submit Quiz
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
what is the working for this question
arrow_forward
Estimate the length of conduit to perform the next bends. EMT will be bend using a hand
bender. Provide your answer in inches (just the number) using up to 2 decimals.
The picture shows two panels connected by a back-to-back
23.5" stubs
EMT 3/4"
6.25 ft
P
arrow_forward
**Note: There is no circuit given for this problem.
arrow_forward
17- The electromechanical breakdown depend on the type of the dielectric between
two electrodes
a- Right.
b- Wrong
18- Basic Insulation Level (BIL) is related to the design consideration of the electric
device, while Basic protection (BPL) level is related to protection level of the that
device.
a Right.
Wrong.
b-
19- As the voltage regulation increased, receiving end voltage will be reduced.
Right.
b- Wrong
20- We can be using Solar power generation field as a power factor and voltage profile
enhancement in Distribution system.
(aRight.
b- Wrong.
21- From the general electrostatic theories, the field strength at breakdown is given by:
a Eb = V/ do =0.6 [Y/ (€ o Er) ] 0.5.
b- Eb V/ do = 0.6 [Y / (€ 0/Er )] 0.5.
C- Eb V/ do = 0.6 [ Y/(Eo Er) 20.05.
d- Eb V/ do = 0.6 [ Y/ (Eo Er) 10.5.
22- Consider plane electrodes with a solid insulator between them. Find the electric
field strength at breakdown, if Young's modulus = 10000 (V.F/m2). and the relative
permittivity is (36000 TT). If the…
arrow_forward
This question apportion control system
I need this question in half an hour
arrow_forward
We are running 3 wires and a ground in a RMC to a control panel with a 60 amp circuit breaker disconnect in the control panel. The conduit is run along the ceiling where the ambient air temperature is 100 degrees. The control panel feeds our secondary cooling pump. What size are the ungrounded conductors? All conductors have typeTHHN insulation.
A
#6 AWG
B
600 Kcmil
C
#8 AWG
D
#2 AWG
What size RMC do we need?
A
3"
B
3/4"
C
1"
D
1 1/2"
arrow_forward
The system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____
a. ±0.25
b. ±1
c. ±0
d. ±0.5
arrow_forward
Please answer questions using the figure
arrow_forward
Explain the diagrams
arrow_forward
I have a wooden toy train that runs on wooden tracks. I would like to place two ESP-WROOM-32 Boards on top of the train. Broadcast communication (which involves radio frequency, not Wi-Fi) would help communicate about the train's lateness to five other wooden trains on the same track. Local communication would help communicate to the train station about the train's lateness. I would also need radio frequency Tx-Rx Modules for discharging and undergoing the signal, and repeaters just in case the signal loses power due to long-distance traveling. My wooden train should be automated. It should run at 4 inches per second, keep a minimum distance of 30 seconds away from the other wooden trains, and make a 17-second-long stop every 500 seconds.
What's the procedure to connect the components?
What's the Arduino code (C++) for this project?
arrow_forward
Part 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet.
1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.
arrow_forward
Good morning. Can you answer the question of the second stage equipment and measurements material, engineering, and within 5 minutes, with many thanks and appreciation
arrow_forward
Very detailed explanation with full detailed drawing Thank you sir
arrow_forward
choose the correct answer
In solar power plant, the cost of concentrating collector is more than flat platecollector.
TRUE or FALSE
arrow_forward
Could you explain this coffe/tea machine circuit
arrow_forward
Please help me solve question 5 below. Please provide a clear and readable solution. Thanks in advance!!! The course subject is Electrical Machines 2.
NOTE: The answers are given below. Please provide the solution. If the answer given below is wrong, please give the correct answer. The unit of total load is 200 ohms. Thanks a lot!!!
arrow_forward
what is the introduction for MEASUREMENT USING DC BRIDGES
arrow_forward
Explain the diagram
arrow_forward
Set up using matrices if possible. Detailed answer, please. The answer is 0.5 W.
arrow_forward
No plagarism please!
Correct and detailed answer will be Upvoted else downvoted
arrow_forward
Please answer with correct units and complete solution
arrow_forward
Please Solve the Electronics Question in 30 minutes with full complete detail and calculation with a complete answer
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C...
Mechanical Engineering
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Cengage Learning
Related Questions
- what is the working for this questionarrow_forwardEstimate the length of conduit to perform the next bends. EMT will be bend using a hand bender. Provide your answer in inches (just the number) using up to 2 decimals. The picture shows two panels connected by a back-to-back 23.5" stubs EMT 3/4" 6.25 ft Parrow_forward**Note: There is no circuit given for this problem.arrow_forward
- 17- The electromechanical breakdown depend on the type of the dielectric between two electrodes a- Right. b- Wrong 18- Basic Insulation Level (BIL) is related to the design consideration of the electric device, while Basic protection (BPL) level is related to protection level of the that device. a Right. Wrong. b- 19- As the voltage regulation increased, receiving end voltage will be reduced. Right. b- Wrong 20- We can be using Solar power generation field as a power factor and voltage profile enhancement in Distribution system. (aRight. b- Wrong. 21- From the general electrostatic theories, the field strength at breakdown is given by: a Eb = V/ do =0.6 [Y/ (€ o Er) ] 0.5. b- Eb V/ do = 0.6 [Y / (€ 0/Er )] 0.5. C- Eb V/ do = 0.6 [ Y/(Eo Er) 20.05. d- Eb V/ do = 0.6 [ Y/ (Eo Er) 10.5. 22- Consider plane electrodes with a solid insulator between them. Find the electric field strength at breakdown, if Young's modulus = 10000 (V.F/m2). and the relative permittivity is (36000 TT). If the…arrow_forwardThis question apportion control system I need this question in half an hourarrow_forwardWe are running 3 wires and a ground in a RMC to a control panel with a 60 amp circuit breaker disconnect in the control panel. The conduit is run along the ceiling where the ambient air temperature is 100 degrees. The control panel feeds our secondary cooling pump. What size are the ungrounded conductors? All conductors have typeTHHN insulation. A #6 AWG B 600 Kcmil C #8 AWG D #2 AWG What size RMC do we need? A 3" B 3/4" C 1" D 1 1/2"arrow_forward
- I have a wooden toy train that runs on wooden tracks. I would like to place two ESP-WROOM-32 Boards on top of the train. Broadcast communication (which involves radio frequency, not Wi-Fi) would help communicate about the train's lateness to five other wooden trains on the same track. Local communication would help communicate to the train station about the train's lateness. I would also need radio frequency Tx-Rx Modules for discharging and undergoing the signal, and repeaters just in case the signal loses power due to long-distance traveling. My wooden train should be automated. It should run at 4 inches per second, keep a minimum distance of 30 seconds away from the other wooden trains, and make a 17-second-long stop every 500 seconds. What's the procedure to connect the components? What's the Arduino code (C++) for this project?arrow_forwardPart 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. 1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.arrow_forwardGood morning. Can you answer the question of the second stage equipment and measurements material, engineering, and within 5 minutes, with many thanks and appreciationarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Electricity for Refrigeration, Heating, and Air C...Mechanical EngineeringISBN:9781337399128Author:Russell E. SmithPublisher:Cengage Learning
Electricity for Refrigeration, Heating, and Air C...
Mechanical Engineering
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Cengage Learning