Department of Civil, Structural & Environmental Engineering Spring Semester 2023 Professor Kamran M. Nemati CIE 327 –
Civil Engineering Materials Answers to Problem Set 5 Question 1: How many gallons are in a barrel of crude oil? Typically, how much bitumen is produced from a barrel of crude oil? One barrel of crude oil equals 42 gallons. Typically, 1.3 gallons (3%) of bitumen is produced from a barrel of crude oil. Question 2:
What are the sources of asphalt? Give examples of each. Natural sources, i.e., Trinidad Lake asphalt. Manufactured, i.e., production of asphalt in refineries from crude oil/petroleum. Crude oil surpassed natural sources in 1907. Question 3:
Describe asphalt cements (also known as paving asphalt). What are they typically used for? Asphalt cement is a type of asphalt that is very sticky and highly viscous, specially prepared with the quality and consistency required in the manufacture of asphalt pavements (hot-mix pavements). They are typically used for: ▪
road construction ▪
roofing applications ▪
roofing shingles ▪
water proofing applications ▪
coatings
CIE 327 –
Civil Engineering Materials Answers to Problem Set 5 Page 2 CIE327ha5.doc
Question 4:
Spell out HMA and BST. What are the other names for BST? HMA: Hot Mix Asphalt BST: Bituminous Surface Treatment BST is also called seal coat or chip seal. Question 5:
Before PG (Performance Graded) grades, what were the asphalt binder specifications typically based on? ▪
Measurements of viscosity ▪
Penetration ▪
Ductility, and ▪
Softening point temperature Question 6:
An asphalt has a performance grading of PG 58-28. Explain what each component means. PG: Performance Grading 58: Expected average 7-day maximum pavement temperature is 58°C -28: Expected minimum pavement temperature is -28°C. Question 7:
Explain different types of aggregate grading used in HMA. Dense graded: Most common Gap graded: Used for stone matrix asphalt (SMA) Open graded: Used as a surface course in many areas Uniformly graded: Not used as a construction material
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Prior to concrete pouring of a slab on grade, a polyethylene sheet it to be laid on the ground. The slab dimension is 30 meters wide and 50 meters length, how many linear meter of 12 feet wide PE sheet you’ll need for this activity?
a. 400 l.m.
b. 450 l.m.
c. 500 l.m.
d. 1673 l.m.
What is total material of PE sheet, if the cost per 50 m. is Php 7,000?
a. Php 56,000.00
b. Php 63,000.00
c. Php 70,000.00
d. Php 238,000.00
arrow_forward
Question Two
Prepare a data sheet & calculate the cost of painting a top and all sides of a Platform below which a table
of item cost has been prepared.
1.75 Nos of labor II class,
1 Mixing Paint Machine,
Labor II Charge= $2.5/m2
Mixing Charge= $1/m2, without any addition in mixing
Series
Material Rate at Source per Lead in KM Conveyance Charge
Floor Paint
1
$67
50m?
$1.5 KM/m2
6m
115°
CS Scanned with CamScanner
2.65m
arrow_forward
As an assistant sales engineer of a construction material supplier, you are required to reply to the following enquiries:
(a) Embedment is the defects commonly found in road surfacings. With annotated diagrams, discuss the causes of the defect and method of improvement.
(b) State common uses of bitumen and bituminous products in constructions.
(c) Polyurethane (PU) is commonly used in construction industry. Describe its properties and uses.
arrow_forward
SUBJECT
DATE
DURATION
EXAMINER
TOTAL MARKS
QUESTION 1
:
a)
b)
c)
:
26,5
19.0
13,2
9,5
4,750
2,000
1,05
0,425
0,075
REQUIREMENTS:
:
NB: SHOW ALL NECESSARY STEPS AND CALCULATIONS!!!
Sieve Opening (mm)
You are tasked with classification and/or comparative analysis of Materials A and B as shown in the table below.
VUT
Vaal University of Technology
Your world to a better future
FACULTY OF ENGINEERING AND TECHNOLOGY
DEPARTMENT OF CIVIL ENGINEERING AND BUILDING
SOIL MECHANICS I [Test 2: 2nd Opportunity]
24/06/2022
1.5 Hours
M. Lamola
25
VAAL UNIVERSITY OF TECHNOLOGY
54
Percentage Passing (%)
Material A
100
79
66
35
21
16
12
10
Material B
100
100
100
91
87
77
65
58
50
Plot the particle size distribution curves/graphs of the two materials on the same set of axis;
Indicate whether the samples meet the standard requirements for road construction.
Justify your answer by computing the respective Cu & Cc of each sample.
Indicate the percentage (i) fines, (ii) Sand, (iii) and Gravel in each sample.
arrow_forward
Select from the following, the type of admixture that you will use if:
The work will be carried out in Jericho during the month of August
Select one:
O A. Type B admixture
O B. Type G admixture
O C. Accelerator admixture
O D. Air Entrainer
Jump to...
arrow_forward
Note# Honorable expert teacher kindly solve each and every step of the Q#1(FULL) as soon as possible, its urgent for today..i will be very thankful to u for this kind favor.
Course; is Environmental Engineering1. ( Department; Civil engineering department )
arrow_forward
It has been proposed the pipeline to be 1m diameter made out of the following spirally or
longitudinally welded pipe steel. Steel grade ST37, L235, API 5L Grade B, yield strength 235N/mm2
to BS 534. Suggest two strategies to prevent/reduce the corrosion in the new pipeline. Justify your
choice with examples of their use in pipelines and discuss their advantages and disadvantages.
arrow_forward
Documentl Microsoft Word Product Activaion Failed)
Mailings
Review
View
Acrobat
Aa
=,而、 律| 219T
AaBbCcDc AaBbCcDr AaBbC AaBbCc
1 Normal
1 No Spaci.
Heading 1
Heading 2
Paragraph
Styles
4
Problem 1,
A pipe of diameter 1.5 m is required to transport an oil of sp gr 0 90 and viscosity 3 x 10-2 porse at
3000litre/s Tests were conducted on a 15cm diameter pipe using water at 20. Find the velocity and
rate of flow in the model Viscosity of water at 20 = 001poise
arrow_forward
(b) With the aid of a sketch, describe the operation of the two main types of die
casting machine. Ensure your answer highlights how they are different.
(c) The company you work for is considering producing a new part using die casting.
Discuss the reasons why the company should and should not consider this
manufacturing method.
(d) Briefly discuss some of the operations that are typically performed on a part after
it has been produced using a solidification process.
arrow_forward
Genel
ERM EXAM
ly courses / CIVE 361L-1-20
In the Aggregate Impact Value test you get the following
Total weight of Aggregate
344 grams
%3D
38 grams
Weight of Aggregate passing through 2.36 mm
Calculate Aggregate Impact value
Select one:
O a. 89.06
O b. 11.04
O C. 98
O d. 67
AS
(8)
arrow_forward
HELP ME HUUHUH CIVIL ENGINEERING - EARTHQUAKE
arrow_forward
Q plastic analysis.
arrow_forward
What is an electrostatic precipitator? Explain its working.
arrow_forward
Mr. Jae Yeong wants to put up a plant rack for his mini garden using a recyclable material from
neighboring construction site. The materials given allowed him to do so but with some repair
(welding 2 aluminum blocks). Given that there should be an allowable specification requirement
for the rack to serve its purpose. Determine the value of the largest P that can be applied.
a
1.5 in
4.5 in
a
t
0.65 in
Oallow
30 ksi
Tallow
19 ksi
arrow_forward
Not sure how to do this one, textbook says the answer is 2.105L. Would appreciate a full solution. Thanks!
arrow_forward
05: Answer the following questions
1. What is a "weathering test" and for which product is it applicable
2. Differentiate between ASTM distillation & TBP distillation?
arrow_forward
If you could help me with parts a-d id greatly appreciate it, I will rate immediately. Thank you.
arrow_forward
Write water absorption of Aggregate:
1-Introduction.
2-Procedure.
3- discussion .
arrow_forward
Civil engineering
Subject: structural theory
Topic: Loads Based on NSCP 2015,
One-Way Load Distribution
Two-Way Load Distribution
arrow_forward
Q1: Why Iraqi
specification no. 5
limited max. SO3 by
2.5% when C3A
! 7%.
arrow_forward
Discusse Pumped Concrete used in Costal marine construction
arrow_forward
1. A certain material having a specific gravity of 3.52 in a 250 mL beaker was found to have weigh 484 g.
What is the porosity of the material?
a. 0.68 b. 0.38 c. 0.45 d. 0.29
2. The width of an apron conveyer with a capacity of 75 tons/hr and speed of 50
A. 220 mm B. 370 mm C. 070 mm D. 460 mm
3. The diffusivity of water in air at 10 deg. F and 1 atm in cm2/sec is
A. 0.256 B. 0.273 C. 0.404 D. 0.581
arrow_forward
How to do these in AutoCad? step by step, please.
arrow_forward
gerotechnical engineering question
arrow_forward
What difficulties arise in use of construction material which absorb water? How theyovercome
a) In the laboratory.b) And on construction site.
arrow_forward
REQUIREMENT
-Compute for the TOTAL VOLUME of the STRUCTURAL CONCRETE for the
given structure.
NOTE: STRUCTURAL CONCRETE ONLY
ITEM NO
DESCRIPTION
UNIT
QUANTITY
STRUCTURAL CONCRETE
900(1)bl
cubic meter
(Class A, 14 days)
arrow_forward
" ZAIN IQ
H+
Exam c.docx →
Exam
Ql:- Using the dimensional analysis, find the relationship between the variables,
shear stress t, flow velocity v, density p, viscosity u and pipe diameter D.
arrow_forward
(a) Write brief notes containing examples to explain the use of each of each of the
following in the design of reinforced concrete structures:
Limit state design
[10 Marks]
(i)
(ii)
(iii)
Factored design actions
Design combination of actions
[5 Marks]
[5 Marks]
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Related Questions
- Prior to concrete pouring of a slab on grade, a polyethylene sheet it to be laid on the ground. The slab dimension is 30 meters wide and 50 meters length, how many linear meter of 12 feet wide PE sheet you’ll need for this activity? a. 400 l.m. b. 450 l.m. c. 500 l.m. d. 1673 l.m. What is total material of PE sheet, if the cost per 50 m. is Php 7,000? a. Php 56,000.00 b. Php 63,000.00 c. Php 70,000.00 d. Php 238,000.00arrow_forwardQuestion Two Prepare a data sheet & calculate the cost of painting a top and all sides of a Platform below which a table of item cost has been prepared. 1.75 Nos of labor II class, 1 Mixing Paint Machine, Labor II Charge= $2.5/m2 Mixing Charge= $1/m2, without any addition in mixing Series Material Rate at Source per Lead in KM Conveyance Charge Floor Paint 1 $67 50m? $1.5 KM/m2 6m 115° CS Scanned with CamScanner 2.65marrow_forwardAs an assistant sales engineer of a construction material supplier, you are required to reply to the following enquiries: (a) Embedment is the defects commonly found in road surfacings. With annotated diagrams, discuss the causes of the defect and method of improvement. (b) State common uses of bitumen and bituminous products in constructions. (c) Polyurethane (PU) is commonly used in construction industry. Describe its properties and uses.arrow_forward
- SUBJECT DATE DURATION EXAMINER TOTAL MARKS QUESTION 1 : a) b) c) : 26,5 19.0 13,2 9,5 4,750 2,000 1,05 0,425 0,075 REQUIREMENTS: : NB: SHOW ALL NECESSARY STEPS AND CALCULATIONS!!! Sieve Opening (mm) You are tasked with classification and/or comparative analysis of Materials A and B as shown in the table below. VUT Vaal University of Technology Your world to a better future FACULTY OF ENGINEERING AND TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING AND BUILDING SOIL MECHANICS I [Test 2: 2nd Opportunity] 24/06/2022 1.5 Hours M. Lamola 25 VAAL UNIVERSITY OF TECHNOLOGY 54 Percentage Passing (%) Material A 100 79 66 35 21 16 12 10 Material B 100 100 100 91 87 77 65 58 50 Plot the particle size distribution curves/graphs of the two materials on the same set of axis; Indicate whether the samples meet the standard requirements for road construction. Justify your answer by computing the respective Cu & Cc of each sample. Indicate the percentage (i) fines, (ii) Sand, (iii) and Gravel in each sample.arrow_forwardSelect from the following, the type of admixture that you will use if: The work will be carried out in Jericho during the month of August Select one: O A. Type B admixture O B. Type G admixture O C. Accelerator admixture O D. Air Entrainer Jump to...arrow_forwardNote# Honorable expert teacher kindly solve each and every step of the Q#1(FULL) as soon as possible, its urgent for today..i will be very thankful to u for this kind favor. Course; is Environmental Engineering1. ( Department; Civil engineering department )arrow_forward
- It has been proposed the pipeline to be 1m diameter made out of the following spirally or longitudinally welded pipe steel. Steel grade ST37, L235, API 5L Grade B, yield strength 235N/mm2 to BS 534. Suggest two strategies to prevent/reduce the corrosion in the new pipeline. Justify your choice with examples of their use in pipelines and discuss their advantages and disadvantages.arrow_forwardDocumentl Microsoft Word Product Activaion Failed) Mailings Review View Acrobat Aa =,而、 律| 219T AaBbCcDc AaBbCcDr AaBbC AaBbCc 1 Normal 1 No Spaci. Heading 1 Heading 2 Paragraph Styles 4 Problem 1, A pipe of diameter 1.5 m is required to transport an oil of sp gr 0 90 and viscosity 3 x 10-2 porse at 3000litre/s Tests were conducted on a 15cm diameter pipe using water at 20. Find the velocity and rate of flow in the model Viscosity of water at 20 = 001poisearrow_forward(b) With the aid of a sketch, describe the operation of the two main types of die casting machine. Ensure your answer highlights how they are different. (c) The company you work for is considering producing a new part using die casting. Discuss the reasons why the company should and should not consider this manufacturing method. (d) Briefly discuss some of the operations that are typically performed on a part after it has been produced using a solidification process.arrow_forward
- Genel ERM EXAM ly courses / CIVE 361L-1-20 In the Aggregate Impact Value test you get the following Total weight of Aggregate 344 grams %3D 38 grams Weight of Aggregate passing through 2.36 mm Calculate Aggregate Impact value Select one: O a. 89.06 O b. 11.04 O C. 98 O d. 67 AS (8)arrow_forwardHELP ME HUUHUH CIVIL ENGINEERING - EARTHQUAKEarrow_forwardQ plastic analysis.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,