STUDENT – PRODUCT ASSESSMENT TASK Task Number
1 of 4
Task Name
Feasibility study and report
National unit/s code
CPCCBC4005
National unit/s title
CPCCBC4005 Produce labour and material schedules for ordering.
CPCCBC5003
Supervise the planning of on-site building and construction work.
CPCCBC5013
Manage professional technical and legal reports on building and construction projects.
National qualification code
CPC50220
National
qualification title
Diploma of Building and Construction (Building)
RMIT Program code
C5415
RMIT Course code
BUIL6434C
BUIL6443C
BUIL6442C
Section A – Assessment Information
Duration and/or due date:
Refer to CANVAS
.
Task Instructions
This task requires you to act as a representative for a client. You will need to:
Complete a property inspection.
Obtain engineers’ certificates.
Estimate rectification costs for the structure, including a recommendation as to renovate or demolish and build.
Complete a feasibility study. Refer to the Task Details, for further information.
For this task you will:
Access and inspect a property that has been arranged by RMIT.
Complete it individually with support from a person to record your inspection on selected device.
Complete the inspection of the workplace within the allocated time.
Obtain documentation through the workplace and industry web sites or connections.
Complete the documentation within the allocated.
Submit your answers electronically according to task instructions. If you have any questions about the task or concerns about your ability to complete the task, please discuss this with your assessor.
Conditions for assessment
While there is an element of group work to acquire information; the writing, documentation and completion
of this assessment is an individual task that you must complete on your own.
You can open the document via word and complete the task digitally.
Illegible handwritten tasks will not be accepted.
Please ensure that your full and correct name is written on your version of this assessment task.
You must answer all questions correctly to be deemed satisfactory in this assessment.
Assessments will be assessed as satisfactory or not yet satisfactory.
You will receive one resubmission for this assessment. A DNS result will not entitle you to a resubmission.
Failure to submit by the due date and time will result in a Did Not Submit Result.
The completed task must be submitted on CANVAS as instructed. A hard copy will not be accepted.
Information on recording and retaining assessments and dealing with assessment appeals can be found in
the RMIT Assessment Processes document
[
Feasibility study and report
] [ 1 of 4
] [ January 2024 ]
Student product assessment task
© Content is subject to copyright, RMIT University
FINAL APPROVED – STUDENT PRODUCT ASSESSMENT TASK TEMPLATE – July 2023_Version 2.1
Page 1
of 11
RMIT Classification: Trusted
STUDENT
Find assessments for your course, how to submit your assignments and assessment appeals here: Assessments
Information on extensions and special considerations can be found here: Extensions and special consideration
If you have a disability, long-term illness and/or mental health condition, you may be granted an adjustment to the standard conditions via Equitable Assessment Arrangements
.
Please make arrangements with your assessor at least one week prior to the assessment due date if you feel you require special allowance or allowable adjustment to this task.
Useful Links Please use links below to access important information on assessments:
Assessment submission and appeals - Assessments
Extensions and special considerations - Extensions and special consideration
Equitable Assessment Arrangement (EAA) - Equitable Assessment Arrangements
Information on recording and retaining assessments and dealing with assessment appeals can be found in the RMIT Assessment Processes document
Instructions on submitting your product assessment task
P
lease submit your report on Canvas. Ensure that you have included the following in your final report-
Executive summary
Contents page
Page numbers
Introduction
Body of the report (addressing the following):
o
Your assessment of the site conditions and structure (including relevant photos) o
The checklist you completed on site.
o
A summary of what is contained in both engineer’s certification (1 heading for each engineer)
o
Estimated costs.
o
Contract review (see Part 3 section 1)
o
Schedule review process (see Part 3 section 2)
Conclusion or recommendation
Appendices o
Certifications from engineers o
Copies of emails.
o
Any other relevant photos (properly labelled) o
Copy of planning permit application (see Part 2, section 2)
o
Copy of appeals form (see Part 2, section 3)
o
Conflict resolution process transcript (see Part 4)
Client approval form outlining details of project and authorisation to proceed with refurbishment. You will also take part in a role play where you will be required to demonstrate your ability to engage in a
negotiation according to the information found in
Part 4. There is a submission required for this task using the
notes that you take during this role play. Equipment/resources students must supply:
Equipment/resources to be provided by RMIT or the
workplace:
Computer and internet access.
The access to CANVAS
[
Feasibility study and report
] [ 1 of 4
] [ January 2024 ]
Student product assessment task
© Content is subject to copyright, RMIT University
FINAL APPROVED – STUDENT PRODUCT ASSESSMENT TASK TEMPLATE – July 2023_Version 2.1
Page 2
of 11
RMIT Classification: Trusted
STUDENT
[
Feasibility study and report
] [ 1 of 4
] [ January 2024 ]
Student product assessment task
© Content is subject to copyright, RMIT University
FINAL APPROVED – STUDENT PRODUCT ASSESSMENT TASK TEMPLATE – July 2023_Version 2.1
Page 3
of 11
RMIT Classification: Trusted
STUDENT
Scenario
Your client RMIT is considering a major refurbishment of a two-story building to ensure it is fit for
purpose and compliant with the current NCC standards. RMIT has sent you the following brief.
Dear Supervisor,
We are considering a refurbishment of Building 50 which is situated at 11-15 Orr Street Carlton.
The site is 20.8m x 14.20m a total of 295.36m
2
The building is currently used as office space, which is old and in need of a facelift. Our budget will
only allow us to allocate $950,000 to the project, so we need to ensure that the re-fit can be
completed within this constraint.
We will require you to complete a property inspection and determine if the building is structurally
sound and feasible to re-furbish or if it needs to be demolished. Your report will be used to determine if we will proceed with the project so it must be
comprehensive and include the appropriate certification from suitably qualified engineers. Yours sincerely
RMIT building committee.
Task Details To meet the clients brief you will need to:
Completing a property inspection
Obtaining engineers’ certificates related to defects discovered in the inspection.
Estimating redevelopment costs for the building (this must include the cost of demolition of
certain areas) [
Feasibility study and report
] [ 1 of 4
] [ January 2024 ]
Student product assessment task
© Content is subject to copyright, RMIT University
FINAL APPROVED – STUDENT PRODUCT ASSESSMENT TASK TEMPLATE – July 2023_Version 2.1
Page 4
of 11
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Civil Engineering
Q4:-what are the common problem being faced in the construction site.briefly discuss.
arrow_forward
Given ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences.
For strict compliance.
Thank you!
arrow_forward
In contructon xyz , a safety and health committee were developed to satisfy the clients requirement. Project director will be the chairman and this committe will be manged by project manager and advise by the Safety officer. The committe will oversee all construction work aspect which are Mechanical and electrical (M&E), Civil and structural (C&S), Architectural, Infractural works which will be performed by all four site supervisor at site.
Illustrate an appropiate organisation structure of safety and health committe for this project.
arrow_forward
Please provide the enough information and definition of these construction terms:
Civil engineer
Clearing and grubbing
Client
Commercial availability
Commercial building
Compaction test
Concrete cover
Concrete curing
Concrete Hollow Block (CHB)
Confined Space
Construction built out
Construction estimate
Construction firm
Construction plan
Construction schedule
Construction site
Contingency plan
Contract formation
Convenience outlet
Conversion
Crane
Critical path
Cross sectional area
Cut and fill
Daily Activity Report (DAR)
arrow_forward
Draw simple FBD and submit the solution within 25 minutes, Urgent.
arrow_forward
Background
You are the project manager for a construction project that involves building a new office building. Your team has identified the following tasks that need to be
completed, along with their estimated durations:
• Clear and grade the site (2 weeks)
• Obtain necessary permits (3 weeks)
Lay foundation (4 weeks)
• Install plumbing and electrical systems (6 weeks)
Complete landscaping (2 weeks)
• Construct the building shell (10 weeks)
• Finish interior (8 weeks)
Install exterior finishes (4 weeks)
Your Task
1. Using the information above, create a project activities network that illustrates the dependencies and sequence of these tasks. Consider the
following questions:
o Are the activities in the correct order?
o What are the relationships between these activities?
2. Submit your project activities network below. Once you have submitted your response, the next page will be unlocked with a model answer.
3. Review your classmates' responses. Are they the same as yours? Are there…
arrow_forward
Describe any Five major construction methods which are advance, innovative and sustainable process or techniques to be involved in during the construction stage of this project (covers site investigation, site planning and development, earthwork and excavation, temporary works, concrete handling and curing, lightweight materials inconstruction, etc.).
arrow_forward
3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack.
(2) Cables By Us is bringing a new product on line to be manufactured in their current facility in
existing space. The owners have identified 11 activities and their precedence relationships.
(a) Draw the network diagram of this project
(b) Calculate the project completion time
(c) Identify the critical path
日
OF 5
SONY
arrow_forward
Prior to completion of the work, all materials incorporated in the building during construction become the responsibility of the:
A. Owner
B. Contractor
C. Inspector
D. Superintendent
arrow_forward
Your company, a G7 contractor is appointed as main contractor for construction of a new recreational building and facilities at Pantai Minyak Beku, Batu Pahat, Johor. You are chosen for a new position as Construction Contract Manager to administer the construction contract for those recreational buildings and facilities. Prepare your scope of work as a Construction Contract Manager for submission as part of the quality management system (QMS) documentation of the project. (C3) Open ended question.
arrow_forward
Preliminary consideration for test construction.
arrow_forward
Is it the responsibility of the Resident Project Representative to review shop drawings, evaluate sample submittals, approve substitute materials, or interpret the intent of the contract plans and specifications?
arrow_forward
What are the different phases of project management?
Draw a network for the simple project of erection of steel works for a shed. The various activities of the project are as under:
Activity Description Preceded by
A Erect site workshop -
B Fence site -
C Bend reinforcement A
D Dig foundation B
E Fabricate steel work A
F Install concrete pillars B
G Place reinforcement C, D
H…
arrow_forward
QUESTION 1
We have a three storey structure from a client and the requirement is to complete in 5 months for shell and core only. Attached are the architectural and structural drawings. As a construction manager/ site engineer
(A) Elaborate on the steps needed to be taken to complete this task on time, explaining the roles of the different personnel needed for this task.
(B) Determine the realistic programme, test requirement and procurement schedules needed for this task
(C) What tools/personnel and materials do you think will be needed to set out the building in question and how will you ensure that there is no misalignment of the floors going up.
(D) Provide a skeleton of a bill of quantity for the above drawings. No rates, quantity or amount is needed.
arrow_forward
You are currently working in one of the prefabricated building manufacturers. Your
company had been appointed for a 5-storey building construction project, which will be fully using BIM and IBS. However, your company is still new to BIM. Since you have good
background in BIM, your company had instructed you to lead the project team on using BIM to manufacture the IBS component for the project. Evaluate any 3 requirements of the BIM system that need to be used for the prefabrication of the IBS component.
arrow_forward
1. Construction Management can best be defined as
a. The art and science of coordinating equipment and personnel as well as money to complete a
project on time
b. The art and science of completing a project on time while coordinating resources
c. The management and coordination of resources to complete a project on time
d. The art and science of coordinating manpower, machines, materials, money and time to complete a
project on time and within approved costs
2. Which of the following is defined as meeting or exceeding the needs of the customer?
a. Productivity
b. Quality
c. Control
d. Assurance
e. Value
3. Which of the following is NOT considered to be a general type of construction?
a. Residential
b. Municipal
c. Commercial
d. Industrial
е. Нeavy
4. Which of the following is the representative term for converting an annual value to a future value?
a. Uniform-series, compound amount factor
b. Single-payment, present worth factor
c. Uniform-series, present worth factor
d.…
arrow_forward
Occupational health and safety knowledge on construction site workers
arrow_forward
% consolidation.
arrow_forward
Checklist of activities during construction of building. Be specific and complete with the activities.
arrow_forward
Part 1: Take-home and Viva activity related to topics covered in LO1.
|You work as a mechanical software engineer in a mechanical company which provides modelling and
design services for different types of mechanical applications. Your main tasks are to analyze and assess
different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your
direct manager assigned you to work on specific tasks for different running projects.
Project 1:
Simply supported beams are usually used in structures due to their high stability and performance in resisting
shear stress and bending moment, they are applied in variety of applications such as steel-frame used for
advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the
bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear
force, bending moment and stress đue to bending for bridge modeled as simply supported beam…
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
- Present a design proposal that utilises alternative methods of construction.
arrow_forward
Using the same CPM diagram, what is the total project duration?
Immediate
Estimated
Activity
Activity Description
Predecessors
Duration
A
Excavate
2 weeks
Lay the foundation
Put up the rough wall
Put up the roof
Install the exterior plumbing
Install the interior plumbing
Put up the exterior siding
Do the exterior painting
B
A
4 weeks
C
10 weeks
D
C
6 weeks
4 weeks
5 weeks
7 weeks
9 weeks
7 weeks
8 weeks
4 weeks
E
C
F
E
G
D
E, G
Do the electrical work
F, I
Put up the wallboard
Install the flooring
Do the interior painting
Install the exterior fixtures
K
5 weeks
M
2 weeks
N
Install the interior fixtures
K, L
6 weeks
Total = 79 weeks
arrow_forward
the project constructor and all contractors must establish a ___________ program for excellence for by individuals, teams, or contractors.
arrow_forward
2 CarpetPlus sells and installs floor covering for commercial buildings. Brad Sweeney.
CarpetPlus account executive, was just awarded the contract for five jobs. Brad must now
assign a CarpetPlus installation crew to each of the five jobs. Because the commission Brad
will earn depends on the profit CarpetPlus makes, Brad would like to determine an
assignment that will minimize total installation costs. Currently, five installation crews are
available for assignment, Fach crew is identified by a color code, which aids in tracking
ofjob progress on a large white board. The following table shows the costs (in hundreds of
dollars) for each crew to complete each of the five jobs:
Jeb
2
Red
White
Blue
38
45
37
37
47
32
40
38
34
Crew
Green
Bronn
Use the Hungarian method to solve the problem
arrow_forward
Provide a concise explanation of [1] Quality Assurance and [2] Quality Control on the construction site. How do they differ? and provide examples.
NEED ASAP 30 MINS
arrow_forward
Describe the four types of information documented in the daily construction report?
arrow_forward
Qsn. Discuss the materials required to construct the building using PET bottles as an construction unit .Please don't solve wrong , will dislike
arrow_forward
Prepare an organizational chart depicting the construction process. Identify the parties involved, their functions, responsibilities, and connections with each other.
Why must builder/contractor understand materials?
Make a list of the kinds of materials used in (a) a water distribution system, (b) a city street pavement, (c) a sewage collection system, and (d) a roofing system.
Discuss at least three sustainable construction methods or materials used in the Philippines today. Cite some examples.
arrow_forward
Show neat and clean step by step solutions. Also show FBD if possible.
arrow_forward
i’m struggling on this hw question please help! I will leave a good review and thumbs up. Show all WORK so i can understand easily!
arrow_forward
) Briefly describe the role of the following personnel in the managementof a building project:(i) The client or building owner(ii) Architect(iii) Consulting engineer(iv) Project Supervisor Design Process (PSDP)(v) Project Supervisor Construction Process (PSCP)(vi) Clerk of Works
arrow_forward
Explain the following statement:The LBSR project was a self-certified project.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- Civil Engineering Q4:-what are the common problem being faced in the construction site.briefly discuss.arrow_forwardGiven ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences. For strict compliance. Thank you!arrow_forwardIn contructon xyz , a safety and health committee were developed to satisfy the clients requirement. Project director will be the chairman and this committe will be manged by project manager and advise by the Safety officer. The committe will oversee all construction work aspect which are Mechanical and electrical (M&E), Civil and structural (C&S), Architectural, Infractural works which will be performed by all four site supervisor at site. Illustrate an appropiate organisation structure of safety and health committe for this project.arrow_forward
- Please provide the enough information and definition of these construction terms: Civil engineer Clearing and grubbing Client Commercial availability Commercial building Compaction test Concrete cover Concrete curing Concrete Hollow Block (CHB) Confined Space Construction built out Construction estimate Construction firm Construction plan Construction schedule Construction site Contingency plan Contract formation Convenience outlet Conversion Crane Critical path Cross sectional area Cut and fill Daily Activity Report (DAR)arrow_forwardDraw simple FBD and submit the solution within 25 minutes, Urgent.arrow_forwardBackground You are the project manager for a construction project that involves building a new office building. Your team has identified the following tasks that need to be completed, along with their estimated durations: • Clear and grade the site (2 weeks) • Obtain necessary permits (3 weeks) Lay foundation (4 weeks) • Install plumbing and electrical systems (6 weeks) Complete landscaping (2 weeks) • Construct the building shell (10 weeks) • Finish interior (8 weeks) Install exterior finishes (4 weeks) Your Task 1. Using the information above, create a project activities network that illustrates the dependencies and sequence of these tasks. Consider the following questions: o Are the activities in the correct order? o What are the relationships between these activities? 2. Submit your project activities network below. Once you have submitted your response, the next page will be unlocked with a model answer. 3. Review your classmates' responses. Are they the same as yours? Are there…arrow_forward
- Describe any Five major construction methods which are advance, innovative and sustainable process or techniques to be involved in during the construction stage of this project (covers site investigation, site planning and development, earthwork and excavation, temporary works, concrete handling and curing, lightweight materials inconstruction, etc.).arrow_forward3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack. (2) Cables By Us is bringing a new product on line to be manufactured in their current facility in existing space. The owners have identified 11 activities and their precedence relationships. (a) Draw the network diagram of this project (b) Calculate the project completion time (c) Identify the critical path 日 OF 5 SONYarrow_forwardPrior to completion of the work, all materials incorporated in the building during construction become the responsibility of the: A. Owner B. Contractor C. Inspector D. Superintendentarrow_forward
- Your company, a G7 contractor is appointed as main contractor for construction of a new recreational building and facilities at Pantai Minyak Beku, Batu Pahat, Johor. You are chosen for a new position as Construction Contract Manager to administer the construction contract for those recreational buildings and facilities. Prepare your scope of work as a Construction Contract Manager for submission as part of the quality management system (QMS) documentation of the project. (C3) Open ended question.arrow_forwardPreliminary consideration for test construction.arrow_forwardIs it the responsibility of the Resident Project Representative to review shop drawings, evaluate sample submittals, approve substitute materials, or interpret the intent of the contract plans and specifications?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning